Demolition of existing garden sheds to the rear and the construction of a single storey extension to the side and rear comprising of a kitchen, living and dining area and 2 no. ensuite bedrooms including internal modification works to the existing dwelling.
Retention permission for a dormer window to the rear roof slope at attic level.
Partial demolition (c.114.3 sq m) of existing single-storey, detached, 5-bedroom bungalow (c.216.7 sq m), refurbishment (c.102.4 sq m) and single-storey, double-pitched and flat roof extension (c.219.9 sq m), to accommodate the primary dwelling (4 bedrooms and ancillary living and welfare areas) and an attached secondary, semi-independent annexe (1 bedroom and ancillary living areas), for integrated use as a multi-generational, fully accessible, family dwelling. And all associated and ancillary site development, landscaping and boundary works, including localized site reprofiling (max. 500mm increase) to match existing ground floor level, new access ramps and covered walkway connecting entrance of house to existing driveway.
Development of the site for purpose of operational vehicle storage, including surfacing and ancillary infrastructure.
Of an existing 16.8sqm single story conservatory extension to existing dwelling and an existing single storey 31.32sqm detached garage to the rear of the existing dwelling and all associated site development works
A new vehicular entrance and boundary fence to new display surface car parking, on 0.15ha of vacant land, located west of the existing car parking including a 6m high internally illuminated signage totem and tensile fabric canopy structures. Extension of existing workshop by 208sq.m located to the north of Block B and extension of 106sq.m for new vehicle preparation to the north of Block B and internal alterations including a trade parts counter and a new double door on the west elevation of the showroom building, known as Block B, a two storey extension matching the existing height of Block C of 692sq.m to the north of the servicing area of the building known as Block C for vehicle servicing and waiting facilities and an external canopy structure of 200sq.m to the east elevation of the existing parts building known as Block A on an overall site of 2.257ha.
Single storey dwelling with attic storage space, a domestic garage, a wastewater treatment system and a new entrance together with all ancillary works
Change of use from existing short term tourist accommodation units to full apartment type living accommodation units consisting of 10 two bed ground floor units and 10 two bed duplex type units at first floor level (20 units in total); also, include small elevational changes to facilitate balcony extensions at first floor level and new balcony areas at ground floor level in order to accommodate private amenity space for the individual units; omit Planning Condition 6 of Planning Ref. S01A/0051 (which links the use of units to the City West Hotel); new bicycle shelter and all associated site development works, parking, landscaping and boundary treatment works.
Widen existing vehicular entrance to 3.5 metres with removal of 1.1 metre length of front garden wall and construction of new entrance pillar and ground storey front porch extension and side extension including utility room and en-suite bedroom with green garden flat roof including all associated ancillary works.
First floor side extension consisting of 2no. Bedrooms and en-suite over (previously granted) ground storey side extension including utility room and en-suite bedroom with front porch extension and all associated ancillary works.
1. an all weather pitch with ancillary lighting, perimeter fencing, 2. A playground area and 3. A revised walking track along bollard lighting to that previously granted under planning ref 21/192 and all associate site works
The development will consist of two storey extension to side / front of existing dwelling ( north end ) together with single storey extension to side ( south end ) and porch area to front of existing dwelling. The development also includes revised internal ground floor plan layout and modifications to existing elevations, together with all associated site works.
The construction of a 31m2 shed in the rear garden to be used as a gym, and all associated site development works above and below ground.
Change of use of their land to a football field with a walking tracking along with the construction of a single storey dressing room with oakstown treatment plant and soil polishing filter and extending the existing parking area and all associated site works
The installation of telecommunications equipment including no. 3 ballast mounted shrouded antennas, no. 1 ballast mounted dish, remote radio units (RRU's), cable trays, GPS, cabinet and all other associated site development works on the building rooftop to provide for high-speed wireless data and broadband services.
Retain existing mezzanine storage floor as installed at first floor level; Permission to convert part of the first floor mezzanine storage floor to office space and install new windows to both the east (side) and the south (rear) elevations at first floor level.
The development will consist of internal alterations to the existing retail units to facilitate an amalgamation of the units into a single unit of approximately 234 sq.m and a change of use of the amalgamated unit from its permitted Retail use(s) (under planning Ref. SD03A/0857), to a Sports Facility (Gym).
Change of use of their land for use as a training / playing field along with construction of a hardcore parking area, a new entrance along with a temporary portacabin and portaloo toilets and all associated site works
Partial change of use from warehouse/storage to office use on ground and first floor level consisting of offices, canteen and toilet facilities, internal staircases, and associated facilities; 1 dock leveller located on the south west elevation to existing loading bay; new external windows & doors for office spaces to the existing south east south west and north west elevations with formation of entrance to office space to existing south east elevation; new carparking/hardstanding to provide 27 car parking spaces inclusive of 2 disabled spaces; external ramped/stepped to approach to office entrance to south west elevation; alterations to existing perimeters gabion walls to the south west of existing site and realignment of kerbing and shrub line to south west elevation; car parking external LED lighting provided by way of lamp standards to car park; alterations to existing surface water drainage and associated site works.
Retention of 77sq.m floor space divided evenly between ground and first floors; retention of balcony to front of existing dwelling. Permission for change of use from 289.32sq.m family home to 4 apartments consisting of 3 one bedroom apartments 56.6sq.m (2 person) and 1 two bedroom apartment 67.45sq.m (3 person) units. The development will include balconies to the 2 first floor apartments, access to the development from existing vehicular entrance from Blessington Road (N81), new on site vehicular and pedestrian entrance to accommodate access to rear site, 6 parking spaces, communal garden area at ground floor level, bicycle storage, bin storage, signage, upgraded bio cycle system, site development and boundary treatment works.
Extend office use into warehouse area at ground and first floor to provide for office at first floor and canteen and toilets at ground floor.
Planning permission and retention permission for a Large-scale Residential Development (LRD) consisting of amendments to a Strategic Housing Development (SHD) permitted under ABP Ref. 305556-19, as subsequently amended under SDCC Planning Ref’s SD22A/0299 and SD22A/0422 at a site at Citywest Shopping Centre, Fortunestown, Dublin 24. The proposed amendments for which permission is sought, include the following: (i) External alterations to Block F, comprising the relocation of a plant room door at ground floor level from the south elevation to the northern elevation along with the relocation of balconies at the eastern end of the building at 2nd to 6th floor levels together with a reconfiguration of the design of the balconies; (ii) Omission of 3 no. permitted on-street bin stores and replacement of same with a single consolidated bin store near the south-western corner of the shopping centre, together with a reconfiguration of hard / soft landscaping and on-street car parking spaces, resulting in the net loss of 1 no. on-street car parking space in this area; (iii) alterations to the design and configuration of the permitted single storey staircore structure leading to the basement level that is situated at the south-eastern corner of the shopping centre. The amendments for which retention permission is sought, include the following: (iv) Alterations to the permitted siting, design and size of the permitted ESB Substation and Switchroom at Block D together with the reconfiguration of hard / soft landscaping and on-street car parking spaces, resulting in the net gain of 1 no. on-street car parking space in this area; and (v) Internal and external alterations to the layout, design and configuration of the permitted single storey plant room and associated ESB substation / switch rooms at the south-eastern corner of the shopping centre, together with a slight re-siting of the reconfigured plantroom structure. In the interest of clarity, it should be noted that the proposed amendments and amendments to be retained will not result in any change to the total number of residential dwellings permitted on site, or the total number of on-street car parking spaces, as previously permitted. A dedicated website has been set up for this LRD application which can be viewed at: www. Carrigmorewoodsamendment1.ie
Amendments to the residential development permitted under An Bord Pleanála Reference ABP-305556-19 comprising of the omission of a permitted vehicular access ramp from ground to basement level of the existing Citywest Shopping Centre along the southern elevation; The permitted entrance to the ramp is proposed to be replaced at surface level with 5 car parking spaces, with associated amendments to the parking layout, pedestrian paths and landscaping in the immediate vicinity; An increase in the area of a permitted surface to basement level circulation core in the south-eastern corner of the existing Citywest Shopping Centre (to incorporate a lift and revised stairwell design), together with associated amendments to pedestrian paths and landscaping in the immediate vicinity; The relocation of permitted demountable bollards further eastwards along a permitted roadway to the south-east of the Citywest Shopping Centre; The enlargement of a permitted hammerhead circulation area to the south-east of the Citywest Shopping Centre and the provision of a standalone ESB Substation to the south-east of Block D; These amendments are provided to reprove the operational efficiency of the vehicle circulation and parking arrangement to service the permitted apartment buildings and to meet the requirements of ESB to serve the site.
The development will consist of amendments to the Strategic Housing Development permitted under An Bord Pleanála Reference TA065.305556. The proposed amendments comprise the provision of photovoltaic panels on the roofs of all 6 no. blocks, the provision of roof plant at Blocks A, B, C and D, the provision of an ESB substation at Block O that requires the relocation of no. 1 carparking space, and the reconfiguration of the ground floor of Block E to provide an enlarged plant room. These amendments are necessary to service the permitted blocks, improve the energy efficiency of the development, and to meet the requirements of ESB to serve the site. At Block A it is proposed to provide the following: 21 no. photovoltaic panels arranged in 3 no. rows; and a screen plant area accommodating an internal plant room of 13.24 sqm and an external plant area of 34.72 sqm surrounded. The proposed screened plant rises approx. 1 metre above the permitted lift overruns. At Block B it is proposed to provide the following: 21 no. photovoltaic panels arranged in 3 no. rows on the 5-storey section of the permitted building; a red brick internal plant room of 10.3 sqm on the 4-storey section of the building; and a screened external plant area of 29.2 sqm on the 4-storey section of the building. The proposed roof plant rises approx. 1 metre above the permitted lift over run. At Block C it is proposed to provide the following: 21 no. photovoltaic panels arranged in 3 no. rows on the 6-storey section of the permitted building; a red brick internal plant room of 10.3 sqm on the 5-storey section of the building; and a screened plant area of 32 sqm on the 5-storey section of the building. The proposed roof plant rises approx. 1 metre above the permitted lift over run. At Block D it is proposed to provide the following: 21 no. photovoltaic panels arranged in 3 no. rows; a screened with an internal plant room of 13.5 sqm and an external plant area of 24.33 sqm; a c. 3-metre-high red brick ESB substation with LV switch room to the southwest of the Block D, and the ancillary relocation of 1 no. car parking space. The proposed screened plant rises approx. 2 metre above the permitted parapet level. At Block E it is proposed to provide the following; 18 no. photovoltaic panels arranged in 3 no. rows; and the reconfiguration of the ground floor to replace 1 no permitted retail unit with an enlarged Plant Room (117.15 sqm}, ESB substation (13.6 sqm), a Generator Room (21.82 sqm}, and a Low Voltage (L V} switchroom (13.71 sqm}. These works require the removal of existing windows and doors at the permitted retail unit. At Block F it is proposed to provide 18 no. photovoltaic panels arranged in 2 no. rows. These, and all associated site works including landscaping at a site of 2.9 hectares.
Single storey side extension to southern side of dwelling with pitched roof over & 1 no. roof light.
Mixed use residential scheme (total GFA 26,929sq.m) comprising 6 blocks with balconies/terraces to be provided on all elevations at all levels for each block, to provide 290 apartment units and associated residential amenity facilities, a childcare facility, 4 retail units and 2 café/restaurant units. A total of 153 car parking spaces (including 2 car club spaces) are proposed at surface level and existing basement level of the Citywest Shopping Centre to serve the development to include the reallocation of 37 existing surface level spaces; 67 new surface level spaces and the reallocation of 49 spaces from commercial to residential use at existing basement level of the Citywest Shopping Centre.
The erection of an extension to our dwelling approx. 23sqm in total to effect both the front and rear elevation. Together with all associated and ancillary site works
Demolition of 2 sheds and 2 compounds and works to the existing building comprising of the construction/installation of 5 external dock levellers with roller shutter doors with associated revisions to the existing western elevation to accommodate same; associated site levels and drainage layout adjustments to accommodate the development; expansion of existing concrete yard and all associated engineering and site works necessary to facilitate the development.
The development will consist of a change of use of a Children's Play Facility (established under SDCC Ref. SD17A/0301) at part ground and part first floor level of the existing Citywest Shopping Centre building together with associated internal works of conversion and refurbishment and the erection of a new second floor extension with sedum roof on top to provide a public library that is arrange over three floors, as follows: (i) Ground Floor - Internal alteration and conversion of the existing ground floor lobby (approx 92 sq.m GIA). The existing light and stair access will provide access to the two upper floors that will contain the main floorspace associated with the library; (ii) First Floor - Internal alteration and conversion of existing floorspace (approximately 906 sq.m GIA) to provide public library space with ancillary staff and welfare facilities together with circulation areas. Provision is also made for additional / new external ancillary plant to the rear terrace (approximately 71 sq.m) and PV panels; and (iii) Second Floor - Construction of a new second floor extension to provide approx. 635 sq.m of public library floorspace (GIA) together with a west facing outdoor roof terrace (of approximately 117 sq.m). Associated external works include the provision of 16 no. short stay bicycle parking spaces (8 no. Sheffield stands) and 2 no. secure long stay bicycle spaces.
Erection of linear arrays of solar photovoltaic panels on the roof of Unit 2007 together with 4 invertors 1.075m wide x 0.33m deep x 0.55m high together with all ancillary works. There will be 350 panels in all, each 1.34m x 2.28m in size, located on 3 of the 4 south facing sides of the roof area, all concealed from view behind the parapet walling. No panels are proposed on the 4 north facing elevations. The panels will provide sustainable energy to the premises with the surplus being fed into the grid. An additional means of escape is also proposed.
Change of use of the existing ground floor from café to restaurant, combining hot food takeaway, online home delivery and restaurant use.
Changes of use within parts only of the existing building from storage and production to: (a) use of an area as a marketing suite/showroom (380sq.m ground floor together with an 80sq.m first floor mezzanine extension); (b) automotive academy and training area (925sq.m); (c) construction of additional ancillary office/welfare accommodation (467sq.m) at ground and first floor; (d) two storey briese soleil/sun shade structure to the south elevation; (e) additional windows and glazed screens on all elevations; (f) new single storey hand wash valet structure (146sq.m) on south elevation; (g) new wall mounted signage to west and south elevation; (h) 14 new car parking spaces (previously approved) and 25 new electric car charging points; (i) revisions to existing hard and soft landscaping to accommodate the development; (j) new ramped and stepped access with external terrace to form new entrance area with canopy at existing exit on west elevation; (k) existing 8 metre high water sprinkler tank to be replaced with 11 metre high water sprinkler tank. It is intended that the majority of the premises (6926sq.m) will continue in use for storage and distribution with ancillary office use continuing also.
Erection of a new external car wash structure (64sq.m) at the south east corner of the existing building, including for all associated site works, excavations, pumps, drainage, kerbing and landscaping.
Expansion of the floor plate of proposed creche/pre-school facility (area 370sq.m) to include adjoining storage space (32sq.m) with revised layout plan to that approved in ref. SHD3ABP-302398-18.
Change of use of part ground floor of existing office / warehouse premises to a Deli-Cafe (Delicatessen - Cafe) to include a new recessed shopfront, signage and associated alterations and modifications.
Amendment to Block D4 of the Strategic Housing Development permitted under ABP-310570-21. The proposed amendment to Block D4 is for a reduction in height to 9 storeys (from 13 storeys) and associated reduction in the number of units to 44 (from 60 units); Block D4 will have 4 one beds (no change), 34 two beds (down from 46) and 6 three beds (down from 10) all with associated private balconies/terraces to the north/south/east/west elevations; This will result in the reduction in the total number of residential units across the entire development site from 421 residential units to 405 residential units; Block D4 will also provide 564sq.m residential amenity space at ground floor level (an increase of 9sq.m); Minor amendments to the southern elevation are also proposed. The application includes for all site services required to facilitate the amendment to Block D4.
Change of use of the ground floor of Unit C, Citywest Shopping Centre from its permitted Office use (permitted under South Dublin County Council Reg. Ref. SD03A/0857), to a Health Centre - specifically for the provision of support services to persons with intellectual disabilities.
Construction of a residential development of 463 dwellings comprising 353 apartments, 89 houses and 21 duplex apartments, creche (c.587.8sq.m) and community building (c.141sq.m) as follows: (A) 353 apartments in 7 apartment buildings (with balconies or terraces [including communal terraces] as follows: Block 1 (6 storeys with a part 7 storey level) of 57 apartments; Block 2(6 storeys with a part 7 storey level) of 47 apartments; Block 3 (6 storeys over undercroft/semi-basement with a part 7 storey level) of 56 apartments with car parking and ancillary plant/storage at basement level; Block 4 (6 storeys over undercroft/semi-basement with a part 7 storey level) of 56 apartments with car parking and ancillary plant/storage at basement level; Block 5 (6 storeys with a part 7 storey level) of 47 apartments; Block 6 (6 storeys over undercroft/semi-basement with a part 7 storey level) of 58 apartments with car parking and ancillary plant/storage at basement level; Block 7 is 6 storeys of 32 apartments (creche at ground and first floor) with outdoor play area. (B) 89 houses; House types 1A, 2A, 4, 4A- 3 storey to front [2 storey to rear] remainder of house types 2 storey. (C) 21 duplex apartments in 2 3-storey buildings. (D) Single storey community building including management office, 3 single storey ESB substations, single storey bicycle and bin stores. (E) 401 car parking spaces (including 3 car sharing spaces) to serve overall development and 364 bicycle spaces ([for apartments] with apartment bicycle storage provided internally at ground floor level for apartment blocks 1-7). (F) Provision of public open space areas within the development (including playground areas and communal open space areas); all ancillary landscape works, public lighting, planting and boundary treatments including regrading/re-profiling of site where required as well as provision of footpaths and cycle paths. (G) Vehicular access to the proposed development will be from the Citywest Road (N82) and will include pedestrian crossings and works to facilitate access (including vehicular and footpath/bridges over stream/ditch), secondary vehicular and pedestrian access to boundary to lands to north (currently under construction) and pedestrian to boundary to Magna Drive. (H) Provision of surface water and underground attenuation and all ancillary site development work. The application contains a statement setting out how the proposal will be consistent with the objectives of the relevant SDCC Development Plan.
Change of use from office use to use as a health centre for the provision of medical and health services and associated development and works.
Amendment to Unit A of Tramway Lane (Block E1 of the permitted Strategic Housing Development (SHD) (Ref. ABP-310570-21). Unit A has permission for commercial / retail use. The proposed amendment is for change of use to Dentist. The development will also include a single storey plant area located to the rear / north side of the premises. The proposed amendment includes all associated site services and development works required to facilitate the proposed change of use.
Retention consists of the construction of two rooflights in the main roof to the front of the property.
Change of use of approved ground floor warehouse/factory area (455sq.m) to a disaster recovery/business continuity centre and change of use of approved ancillary offices at ground and first floor (459sq.m) to office use; extension at first floor area (81sq.m) to provide staff toilets and server room; external generator plant enclosure and all associated ancillary works necessary to facilitate the development.
The development will consist of amendment to Unit B of "Tramway Lane" (Block E1 of the permitted Strategic Housing Development (SHD) (Ref. ABP-310570-21). Unit B (c.257.2 sq.m) has permission for commercial/retail use. The proposed amendment to Unit B consists of the incorporation of an off-licence area within the permitted retail unit (c.13.3 sq.m). The proposed amendment includes all associated site services and development works required to facilitate the amendment to the "Tramway Lane" block (on lands located north of the Luas red line and Fortunestown Luas stop.
A two storey dwelling and a domestic garage with on-site treatment plant with soil polishing filter and all associated site works
Reconstruction of fire damaged house including minor alterations and increase (1.3 sqm) to floor plan and change to roof construction and finish
Retention of single storey extension to rear (circa 12sq.m); first floor extension to rear (circa 2sq.m) and attic conversion (circa 12sq.m).
1. change of use (removal of condition number two of planning reference 06/5121) from restricted use as a dwelling to use by all classes, 2. retention permission for a dry dash finish to the external elevations, 3. retention for a single storey garage to the rear of the dwelling and revised boundaries to that previously granted under planning red 06/5121 and 06/6529 and all associated site works
Amendments to Unit B of "Tramway Lane" (Block E1 of the permitted Strategic Housing Development (SHD) (Ref. ABP-310570-21) and Large Scale Residential Development (SDCC Ref. LRD23A/0007) to include a single storey plant area to the rear, beside the permitted cycle stores. The proposed amendment includes all associated site services and development works required to facilitate the amendment to the "Tramway Lane" block.
Up to 268kWp (c. 1227m2) of Roof Mounted Solar PV Panels and all associated works on our premises.
Construction of a residential scheme comprising 421 units, offices, retail units x3 and residential amenity areas x2, within 9 blocks ranging in height from 1-13 storeys. The proposal will include 289 car parking spaces along with 650 cycle parking spaces. The development will provide public and communal open spaces throughout including a public plaza adjoining Fortunestown Luas stop. Provision of vehicular, pedestrian, and cyclist accesses to the site, including pedestrian bridge to the public park (under construction) to the east. The application includes for all landscaping, ESB substations, plant areas, bin storage, surface water attenuation and all other site development works, and site services required to facilitate the proposed development. The proposed development seeks to amend SHD permission ABP-302398 -18 (under construction to the west), replacing 32 permitted duplex apartments along with associated amendments to internal roads and open spaces. The current proposal also replaces permission SD16A/0078 previously granted on this site.