RETAIN the following: 1. Alterations and extension to dwelling house. 2. Car Port. 3. Stand Alone Office. 4. Workshop/Garage. 5. Fuel Shed.Decision record indexed
For the construction of a new two storey dwelling house, detached domestic garage, wastewater treatment system and percolation area, upgrading of existing site entrance and all ancillary site worksDecision record indexed
Carron Research Station, Fahee, Carron Co Clare V95 CY89
For the refurbishment and partial change of use of the existing Carron Research Station at Fahee, Carron, Co Clare. The proposed works will include minor modifications to the building elevations, modifications to the entrance for universal access, construction of a plant room and a standalone storage shed, provision of PV panels, material change of use of existing dormitory accommodation to research labs/offices and a self-contained 2 bedroom apartment, widening of the existing entrance, provision of EV accessible parking and all associated works. The site is located in close proximity to the East Burren Complex Special Area of Conservation (SAC) and a Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the planning applicationDecision record indexed
Of dwelling house, septic tank and percolation area on revised site layout to that previously granted under planning Ref: 05/1354.Decision record indexed
For (a) dwelling house, garage, on site waste water treatment/percolation and all associated services and (b) temporary retention (5 years) of Mobile home, wastewater cesspool and associated services. Gross floor space of proposed works: 207 sqm (H), 60 sqm (G). Gross floor space of work to be retained: 37.1 sqmGrounds not yet categorised
For dwelling house, garage, waste water treatment/percolation and all associated services. Gross floor area of proposed works: 113.6sqm (dwelling house) and 60sqm (garage)Decision record indexed
For [a] dwelling house, garage, on-site waste water treatment / percolation and all associated services and [b] temporary retention [5 years] of mobile home, wastewater cesspool and associated services. Gross floor space of proposed works: 207 msq & 60 msq., Gross floor space of work to be retained; 37.1sqmGrounds not yet categorised
To erect dwelling house, domestic garage, wastewater treatment system, polishing filter and all associated services. Gross floor area of proposed works: 238.35sqm (dwelling house) and 41.60sqm (domestic garage)Decision record indexed
To renovate and extend the existing cottage to include the detached shed refurbished for domestic use, reroute connections to mains water and sewerage services and all ancillary site worksDecision record indexed
The development will consist of (a) replacement dwelling house (b) renovation and reuse of existing barn (c) upgrading domestic wastewater treatment system (d) retaining existing sheds (e) associated site works and servicesDecision record indexed
For a dwelling house, domestic garage, waste water treatment system, polishing filter and all associated services. Gross floor space of proposed works, house 214.70 sqm & 30 sqm/Decision record indexed
To build a new dwelling house, install a waste treatment system, create a new entrance onto the public road & all other associated site and ancillary worksDecision record indexed
To build a new dwelling house, install a wastewater treatment system, create a new entrance to the public road and all associated site and ancillary worksGrounds not yet categorised
Sought to retain and complete dwelling house, domestic garage, waste water treatment system, polishing filter and all associated services on revised site boundaries. (previous permission Ref. 18/71). Gross floor area of proposed works: 171..30 sqm (dwelling house) and 30.00 sqm (domestic garage)Decision record indexed
For the construction of a Multi Use Games Area (MUGA), with associated site fencing, netting, artificial surface, floodlighting and all associated ancillary site development worksDecision record indexed
For completion of dwelling house, garage and relocation of waste water treatment system and polishing filter all on revised site boundaries. Gross floor space of work to be retained: 235.20 (house), 53.0 (garage)Decision record indexed
To construct a single dwelling house, proprietary effluent treatment system, percolation area and all associated site services. Gross floor space of proposed works: 96 sqmDecision record indexed
For the construction of a dormer extension onto an existing dwelling house and all ancillary site works. Gross floor space of proposed works: 131.9 msq.Decision record indexed
To a) construct an entrance, dwelling house and detached domestic garage b) Install a wastewater treatment system and soil polishing filter c) Install a bored well together with all associated site development works and servicesGrounds not yet categorised
For the consruction of a single dwelling house, domestic garage, proprietary effluent treatment system, percolation area and all associated site services. Gross floor area of proposed works: 230.00 sqm (dwelling house) and 66.00 sqm (garage). The application also includes an Archaeological Impact Assessment Report.Decision record indexed
For the construction of a single dwelling house, domestic garage, proprietary effluent treatment system, percolation area and all associated site services. Gross floor space of proposed works: Dwelling: 258 sqm, Garage 66 sqm.Grounds not yet categorised
Of A) dwellinghouse on revised site boundaries, B) Retain existing garage, C) Retain elevation changes to dwellinghouse. Gross floor space of work to be retained: 139.50 sqm (Dwelling), 38.34 sqm (Garage)Decision record indexed
To construct a dwellinghouse, entrance, wastewater treatment system and soil polishing filter together with all associated site development works and servicesDecision record indexed
To erect dwelling house, domestic garage, wastewater treatment system, polishing filter and all associated services. Gross floor space of proposed works: House: 198.7 sqm, Garage: 37.5 sqm.Grounds not yet categorised
To erect dwelling house, domestic garage, wastewater treatment system, polishing filter and all associated services. A Natura Impact Statement and Construction Environmental Management Plan will be submitted to the planning authority with the application. Gross floor space of proposed works: 198.70 sqm (house), 37.50 sqm (garage)Grounds not yet categorised
Of dwelling house with revised site boundaries, and to retain new location of garage. Gross floor space of work to be retained: 229 sqm (house) & 60 sqm (garage)Decision record indexed
Aillwee Caves, Ballycahill Td, Ballyvaughan Co Clare V95 EV59
For the following development: 1. to demolish existing aviary units, existing rc wall / recycling area, existing shed and existing visitor seating; 2. for new Aviary Units, new RC boundary wall and associated fencing; 3. RETAIN existing Birds of Prey reception building and adjacent toilet block, including ancillary site worksDecision record indexed
To construct 1] A new 2 storey extension to side of existing house 2] Alteration & refurbishments to existing house 3] A domestic garage and all associated site works. Gross floor space of proposed works: H 127.48 & 60.0 msq GDecision record indexed
To erect dwellinghouse, domestic garage, wastewater treatment system, percolation area & all associated services. Gross Floor area of proposed works: 221sqm (dwellinghouse) & 59.40sqm (domestic garage)Decision record indexed
Lands at Lisnanard Townland, Ballyvaughan, Co. Clare
For development at a site at lands at Lisnanard Townland, Ballyvaughan, Co. Clare (no Eircode available). The site measures circa 1.126 hectares and is principally bounded by the R477 road to the north; residential dwellings, agricultural buildings, and agricultural lands to the east, an un-named lane and a residential dwelling beyond to the west; and agricultural lands to the south. The site also includes a section of the R477 Regional Road that is within the Lisnanard Townland. The development will consist of: (1) The construction of a new Wastewater Treatment Plant (WwTP) comprising of: an inlet pumping station; a below ground storm tank (c.168m3); a storm overflow flow meter; an outfall manhole and emergency pumping station; a hose reel; inlet works; washwater kiosk; a sludge pumping station; a flow splitting chamber; a picket fence thickener (c.3.51m diameter); a return liquors pumping station; 2 no. settlement tanks (c.4.97m diameter); a final effluent flowmeter chamber; sample point and kiosk; a concrete hardstanding area for emergency mobile dewatering unit; a control building; a standby generator; 2 no. solar panels (c.20m [L] x 15m [w] x 3m [h]); 2 no. site parking spaces and associated ESB charge point; task lighting; internal access roads; new direct access from the R477; new signage; a paladin boundary fence (c.2.4m high), with a main access gate to the north, and landscaping maintenance access points to the south and east. (2) The installation of new sewers comprising of: a combined final effluent and storm sewer, storm overflow / return, sludge / return liquors, scum and dirty drain, foul pumping main, surface water drainage and potable watermains within the WwTP site; the installation of c.266m of new gravity sewer that will intercept the flow east of the existing septic tank and transfer these flows to the new WwTP; and c.240m of a new final effluent gravity sewer to convey the treated effluent from the new WwTP to the existing outfall. The emergency overflow pipe from the inlet pump station will connect to this sewer before leaving the WwTP. Installation of this effluent sewer will terminate at the existing manhole junction on the R477. (3) Landscaping works within the site boundary comprising of: earth embankment works; a proposed wildflower and biodiversity enhancement area; screen planting to supplement existing trees and hedgerows; removal of a section of the existing stone wall and trees / hedgerow to the north to facilitaDecision record indexed
For: (i) dormer extension to the rear of the existing dwelling, of which is a protected structure RPS No. 3696. (ii) Retention for the installation of a new proprietary effluent treatment system & percolation area to replace the old sub-standard septic tank system. Gross floor space of work to be retained: 68.50 sqmDecision record indexed
To construct a single dwelling house, proprietary effluent treatment system, percolation area and all associated site services. Gross floor space of proposed works: House: 206.5 sqm, Garage: 60 sqm.Grounds not yet categorised
To construct a single dwelling house, proprietary effluent treatment system, percolation area and all associated site services. Gross floor space of proposed works: Dwelling: 206.5 sqm, Garage: 60.00 sqmGrounds not yet categorised
For construction of a single dwellinghouse, domestic garage, proprietary effluent treatment system, percolation area and all associated site services. Gross floor space of proposed works: Dwelling - 187 sqm Garage - 60 sqmDecision record indexed
To (a) demolish existing substandard dwellinghouse (b) Construct new dwellinghouse and connect to existing services together with all ancillary site development worksDecision record indexed
For a change of use of an existing garage to an independent living unit and to construct an extension and alterations to the existing building. Gross floor space of proposed works: 10.65 sqmDecision record indexed
Of a; (1) single storey 2 bedroom apartment, (2) septic tank and percolation area, (3) domestic garage adjoining the existing shed and (4) permission to move back existing front boundary wall to allow for sight distanceGrounds not yet categorised
To erect dwelling house, wastewater treatment system, percolation area and all associated services. Gross floor space of proposed works: 235.00 sqmGrounds not yet categorised
For the construction of a single dwellinghouse, domestic garage, a Ter 3 tertiary effluent treatment system & associated percolation area & all associated site services. This application also includes an Appropriate Assessment Screening Report & a Flood Risk Assessment ReportDecision record indexed
For the consruction of a single dwelling house, domestic garage, proprietary effluent treatment system, percolation area and all associated site services. Gross floor space of proposed works: 219.00 sqm (dwelling house) and 60.00 sqm (garage) = 279 sqmGrounds not yet categorised
To (a) demolish the existing storm-destroyed dwelling. (b) For the construction of a new replacement dwelling house, a new proprietary effluent treatment system & percolation area, domestic garage, and all associated site services. Gross floor space of proposed work: 256 sqm (House) & 60 sqm (Garage). Gross floor space of any demolition: 100.00 sqmDecision record indexed
To erect dwelling house, domestic garage, waste water treatment system, percolation area and all associated services. Gross floor space of proposed works: 237.4 sqm + 37.5 sqm.Decision record indexed