To construct 1) A two storey House, 2) Septic tank and percolation area. 3) Bored Well. 4) A domestic vehicular entrance. 5) All ancillary ground works in association with the above
A detached single storey house, single storey domestic garage, effluent treatment system, percolation area, new recessed entrance and all associated site development works
Single storey dwelling house, garage, new site entrance, bored well, proprietary treatment system and associated percolation area, all ancillary site works and services
Permission for the construction of a single storey dwelling, domestic garage, upgrading of existing entrance, bored well, septic tank & percolation area and all associated site works
The construction of a single storey dwelling, domestic garage, connection to services, septic tank & percolation area, new entrance, and all associated site works
Retention permission for a new front boundary wall, vehicular entrance with off street parking and all associated site works
Dwelling, garage, wastewater treatment unit, soil polishing filter, new well, new entrance onto public road, blocking up of existing agricultural entrance and associate works
Unauthorised development, including the construction of a commercial building, 2. No. domestic sheds/stores, 2. No. metal shipping containers used for storage of goods for a charitable organisation, and all associated site works
Two storey dwelling, garage, on-site wastewater treatment system, bored well, access via existing private laneway and all associated site development works
The change of use from holiday home use to permanent residential use
A new single and two storey detached dwelling, New vehicular access with set back low level wall and gate onto public road, wastewater treatment unit and polishing filter, surface water soakaway, timber fence and hedgerow boundary treatment to west, south and east site boundaries, landscaping and all associated site works at, Killamoat Lower, Rathdangan, Co Wicklow; within the Killamoat Lower, settlement boundary.
The Change of Use from an existing holiday home use to permanent domestic dwelling house residential use
The proposed development comprises the construction of: A) a 1062m2 warehouse extension to the south of an existing light industrial warehouse building; B) demolition of an existing 92m2 light industrial unit; C) a 105m2 extension to the west of an existing light industrial warehouse building; D) hard and soft landscaping, boundary treatments, and all associated works and site works to facilitate the development
To construct (I) Milking facilities building incorporating dairy, plant, storage, Meal Bin, Rain Water storage tank, Loose area, underground slurry tank, Cubicle area with feeding area (ii) New agricultural entrance with Hardcore area and all associated site works at Ballyshane, Clonmore, Co. Carlow. A Natura Impact Statement has also been submitted
The construction of a two storey dwelling, detached double garage, onsite wastewater treatment system and polishing filter, a bored well and all associated ancillary site works
Retention permission for a single storey extension to the existing dwelling and all associated site works
Permission for the erection of a dwelling house and domestic garage all with associated site works and services
Permission for the erection of an agricultural storage shed with associated site works and services
The construction of single storey extension to north and east elevations of existing office area with all associated site development works
Retention Permission is sought for the as-built Extension to the west of the existing factory premises
10-year permission. The development will consist of the construction of (i) a Solar PV development comprising photovoltaic panels laid out in arrays over a total development site area of ca. 91.2ha, (ii) the construction of a 38kV substation building ((6.1m (h) x 20.9 (l) and 7.3 (w)) and associated compound area, a transformer unit (ca. 6m x ca. 3.6m) and associated bund, (iii) 352 number Battery Energy Storage System units comprising 22 modules (ca. 21.9m x ca.5.2m) each with 16 number cabinet units within each module and (iv) all ancillary development including 15 number transformer integrated units (ca. 10.5m x ca.2.7m), 12 number inverter units (ca. 6.0m x ca.2.4m), 7 number CCTV cameras mounted on 4m high poles, a 3m high acoustic barrier, with berm and fencing, perimeter security fencing, site access, site egress and all ancillary works and services. The development will have a 40-year operational lifetime. Permission currently exists for a PV development on ca/65.6ha of the site (Planning Permission Ref No. 21/23) that will be superseded by this application if approved
Construction of a new dwelling, wastewater treatment unit & polishing filter, new well, entrance onto public road and associate works
Construction of a new dwelling, garage, wastewater treatment unit and soil polishing filter, connection to public water supply, new entrance onto public road and associate works
For proposed works which will include a solar farm on an area of approximately 27.0 hectares, comprising photovoltaic panels on ground mounted frames, 1 No., onsite 38kV substation, an energy storage system (4 No. units), 10 No. single storey inverter/transformer stations, security fencing, a palisade double security gate, 2 No. storage containers, CCTV, a temporary construction stage wheelwash system and all ancillary development works. Elgin Energy Services Ltd are applying for the proposed solar farm to have planning permission that is effective for 10 years (and an operational period of 35 years). The planning application incudes a Natura Impact Statement
Development at a site at the entrance to the Tullow Wastewater Treatment Plant, Bunclody Road (N81), Tullow, Co. Carlow, R93 RY69 measuring approximately 0.14 hectares. The development will consist of [1] the retention of the existing ‘as built’ wall to the north and south of the site entrance to the Tullow Wastewater Treatment Plant; [2] the demolition of part of the ‘as built’ southern wall, fence and hardstanding; [3] the construction of a new realigned section of wall, concrete hand standing and fence to tie in with the remainder of the ‘as built’ wall, footpath and fence; and [4] hard and soft landscaping works and other associated site development works above & below ground necessary to deliver the development
Development at a site entrance to the Tullow Wastewater Treatment Plant, measuring approximately 0.0605 hectares. The development will consist of works to improve the visibility splay at the ertrance to Tullow Wastewater Treatment Plant, including; demolition of the existing boundary fencing; construction of new retaining boundary walls and new boundary fencing and the provision of a new grass verge along the N81. The development will also consist of the: relocation of existing road signage; relocation of utility and light standard poles; all hard and soft landscaping; and all other associated site excavation, infrastructural and site development works above and below ground including changes in level and boundary treatments
10 Year permission for development consisting of the construction of a Solar PV development comprising photovoltaic panels laid out in arrays over a total development site area will be ca. 65.6 ha, the construction of a 38kV substation (ca 114.4m2 x 4.75 tall) a transformer unit (ca. 18m2 x 4m tall) and associated bund (ca. 55m2), along with ancillary development including; 24 no. Power Hubs (ca. 15.25m2 x 2.4m) which incorporate an inverter and a transformer, 1 no. single storey communications building (11.1m2 x 2.5m), 1 no. single storey client side sub-station building (15.25m2 x 2.9m), 1 no. single storey equipment storage building (7.5m2 x 2.7m), 10 no. CCTV cameras mounted on 4m high poles, perimeter security fencing, site access, site egress and all ancillary works. Permission currently exists for a PV development on part of the site (Planning Permission Ref No. 16325). An Natura Impact Statement will accompany the planning application.
The construction of a new dwelling, domestic garage, wastewater treatment unit and polishing filter, new well, relocating section of existing laneway, new double entrance onto public road for proposed dwelling and farm laneway, blocking up existing entrance onto public road from farm lane and associate works
To construct a dwelling house with services, domestic garage and all associated site works
Construction of an overground slurry storage tank and all associated siteworks
Construction of a new dwelling, garage, wastewater treatment unit and polishing filter, new well, upgrade existing entrance onto public road and associate works
New 95sqm single storey extension to the existing 166sqm Community Hall to include single storey extension to northern end of hall (Floor Area of 55.0sqm), upgrading of male and female toilets, additional storage area including internal upgrade works, effluent treatment and disposal system to current EPA guidelines and all associated ancillary works
Vegetable store and polytunnels, proposed new entrance, gravelled yard and all associated site works
Permission to erect an extension to the side of our existing dwelling house with connection to existing services on site
For the proposed erection of a warehouse building including external signage and all auxiliary accommodation, the erection of paladin fencing to site boundaries including entrance gate together with all associated site works
The proposed erection of a warehouse building including external signage and all auxiliary accommodation, a self-storage facility to the rear consisting of container units, the erection of paladin fencing to site boundaries including entrance gates together with all associated site works and landscaping
Alterations to perimeter fencing including removal of existing v-mesh on northern and partial west perimeters and replaced with a 900mm concrete retaining wall with v-mesh reinstated on top to maximum height of 2,400mm along with all associated site works
The erection of a slatted cattle shed, concrete yards and ancillary works
Construct a dormer style dwelling house, garage, new site entrance, proprietary treatment system and associated percolation area, all ancillary site works and services
Construct a single storey dwelling, garage, on site wastewater treatment system, percolation area, bored well, new domestic splayed entrance and driveway and all associated site development works
The construction of a slatted shed, installation of cubicles within an existing shed, extension of a dairy building and associated site works
Permission for 2 no. New steel framed warehouse/light industrial units (including ancillary offices and operational facilities over two storeys to the front of unit no. 2), associated car parking, site vehicular entrance, perimeter fencing, sign to front façade of unit no. 2, connection to existing services and all associated site works
Permission to demolish an existing dormer style dwelling and construct a replacement single storey dwelling, a new detached single storey garage, wastewater treatment system and percolation area, (removal of existing septic tank), removal of existing substandard entrance and construct a new entrance and driveway, use of existing water mains connection and all associated site works
Retention of the installation of an overflow service yard and for the position of windows as constructed from that granted under PL Ref No. 08/451 & 19/467 and for permission for a proposed vehicle entrance to serve and approved carpark (carpark granted under PL Ref No. 19/467) and the installation of PV Solar Panels to the roof together with all associated site works
Alterations to existing three storey facility (site numbers 9 & 13 of planning reference no. 07/659 and building constructed under PL 08/451). Alterations to include widening of existing entrances, additional windows at second floor level, additional parking area, perimeter fencing, 2 no. new entrances and internal access to adjacent sites (site numbers 10 & 11 of planning reference no. 07/659), connection to all existing services and retention for an existing portacabin unit and all associated site works
To construct 7no. glamping pods with services and all associated site works
The upgrade of an existing farm entrance to a forestry standard road entrance
For proposed works to include a solar and storage park on an area of approximately 68.8 hectares, comprising linear arrays of solar photovoltaic panels mounted on steel supported structures with associated cabling and ducting (including cable connection to the proposed onsite 110 kV tail fed substation), 50 inverter substations, a storage park (including 30 no. containers with battery cells, transformers and power conversion units), perimeter fencing, 8 no. palisade double security gates, 3 no. temporary construction compound/material storage areas, 6 no. steel storage containers, 17 no. turning bays, CCTV, a temporary construction stage wheel wash system and all associated ancillary development works. Elgin Energy Services Ltd. are applying for the proposed development to have planning permission that is effective for 10 years (and an operational period of 40 years). A Natura Impact Statement (NIS) has been prepared and will be submitted to the planning Authority with the Planning Application.
Detached dormer bungalow, single storey domestic garage, entrance, connection to existing foul sewer and all associated site works
The change of use of an existing adjoining single storey domestic shed to use as habitable part of our existing dwelling, retention permission for the construction of a domestic shed and all associated site works