To RETAIN the dwelling house as build on site & PERMISSION to alter the existing fenestration & extend the dwelling house, upgrade the existing sewerage system & all associated site & ancillary works
To construct a new dwelling house, garage, sewage treatment system and construct a new entrance onto public road and associated site works.
To construct a slatted shed with underground slurry storage tank
To construct dwelling house, garage, treatment unit and all associated services
To demolish the existing rear extension, extend the existing house, upgrade the wastewater treatment system & all other associated site and ancillary works
To construct a dwelling house and garage, with effluent treatment system, new entrance from public road, and all associated site works
To build a dwelling, garage, install a wastewater treatment system and all associated site works.
For develpment, the development will consisst of; a) renovation of existing vacant dwelling, b construction of new dormer extension to rear of dwelling, c) decommissioning of existing septic tank, d) provision of new proprietary wastewater treatment system and percolation area e) and all associated site works
For the development at this site in the townlands of Slievenalicka, Illaunbaun, Drumbaun and Lackamore (although no infrastructure will be sited within Lackamore townland), Co. Clare. The development will consist of: • Construction of 1 wind turbine with a maximum overall blade tip height of 150m. • Construction of associated turbine foundation, crane pad hardstand and assembly area. • Construction of one permanent 38 kV electrical on-site substation with one control building with welfare facilities, all associated electrical switchgear, security fencing, underground cabling, drainage infrastructure, and all ancillary works. • All associated internal underground electrical and communications cabling connecting the wind turbine to the on-site Substation. • Upgrade of existing tracks, roads and provision of new site access roads to facilitate construction and operation of the turbine. • Two borrow pits. • One peat repository area for peat and spoil management. • Construction of one temporary construction compound. • Development of internal site drainage. • Permanent and Temporary tree felling to accommodate the construction and operation of the turbine. • Signages. • All associated site development works. This application is seeking a 10-year planning permission, together with a 35-year operational life for the wind turbine from the date of its commissioning. The development is covered by the provisions of the Renewable Energy Directive III (Directive 2023/2413) Yes. The planning application is subject to section 34D of the Planning and Development Act, 2000, as amended. When a notice is issued in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply. An Environmental Impact Assessment Report (EIAR) and Screening for Appropriate Assessment have been prepared in respect of the planning application and will be submitted to the Planning Authority with the application
For the construction of an extension to rear of existing dwelling house including modification of existing extension, alterations and internal layout, installation of new domestic waste water treatment system with polishing filter together with all associated site works
The development consists of a) the RETENTION of existing "granny flat" to the rear of dwelling house and b) the replacement of existing sub-standard septic tanks with a new proprietary wastewater treatment system, sand polishing filter and percolation area together with ancillary site works
For the development of Illaunbaun Wind Farm in the townlands of Tooreen, Slievenalicka, Illaunbaun, Drumbaun & Lackamore (although no infrastructure will be sited within Lackamore townland), County Clare. The development will consist of: • Construction of 5 wind turbines with a maximum overall blade tip height of 150 m. • Construction of associated turbine foundations, crane pad hardstand and assembly areas. • Construction of one permanent 38 kV electrical on-site substation with one control building with welfare facilities, all associated electrical switchgear, security fencing, underground cabling, drainage infrastructure, and all ancillary works. • All associated internal underground electrical and communications cabling connecting the wind turbines to the on-site Substation. • Upgrade of existing tracks, roads and provision of new site access roads to facilitate construction & operation of the wind farm. • Two borrow pits. • Three peat repository areas for peat & spoil management. • Construction of one temporary construction compound. • Development of internal site drainage. • Permanent & Temporary tree felling to accommodate the construction & operation. • Signages and • All associated site development works. This application is seeking 10-year planning permission, along with a 35-year operational life for the wind farm from the date of its commissioning. The development is covered by the provisions of the Renewable Energy Directive III (Directive 2023/2413) Yes x No The planning application is subject to section 34D of the Planning and Development Act, 2000, as amended. When a notice is issued in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply. An Environmental Impact Assessment Report (EIAR) & Screening for Appropriate Assessment have been prepared in respect of the planning application and will be submitted to the planning authority with the application.
To build a sunroom onto the existing dwelling and all associated site and ancillary works
To build a new dwelling house, install a wastewater treatment system and all associated site and ancillary works
The development will consist of: a) the replacement of existing substandard septic tank with a proprietary waste water treatment system & polishing filter and b) the creation of a vehicular entrance and parking area together with ancillary site works
To construct a dwelling house, garage and proprietary waste water treatment system along with ancillary site works
Of the rear extension and attic conversion of existing dwelling together with ancillary works
To construct a 5 bay slatted shed with underground slurry storage and associated site works
For development of a livestock slatted unit and manure pit with associated ancillary siteworks
To build a new dwelling, install a waste water treatment system & all other associated site and ancillary works
For 1.) the conversion of 1st floor restaurant to guest accommodation and associated works and 2.) elevation alterations
To build a new house, garage, install a waste water treatment system, create a new entrance onto the public road and all associated and ancillary site works
To rebuild, extend and renovate the derelict house on site, install a wastewater treatment system and all other associated site and ancillary works
To RETAIN and complete alterations made to the existing gate lodge and site works granted under P19/738. PERMISSION is sought to a) change and extend the flat roof on the rear extension b) change the main roof structure/finishes c) change the site works. PERMISSION to RETAIN and complete alterations include a) new rear bedroom window b) new block wall on the rear east elevation C) gable window on the west elevation d) to RETAIN and complete the external shed along with associated site works
Of the storage shed and the extension to side and rear of the dwelling house and all other associated site and ancillary works
For the development which will consist of the erection of a 2.39m high paladin fence measuring 30.4m in length and located along the northwestern boundary of Rockmount Water Treatment Plant
Of the following a) the side and rear extensions to the existing house as constructed b) CHANGE OF USE from an existing house to commercial that allows for short-term accommodation c) the wastewater treatment system and polishing filter d) modifications to the site entrance, front boundary walls and internal roads along with associated site works
To build a new dwelling house, install a wastewater treatment system & all other associated site and ancillary works
Of the new entrance onto the public road, the creation of a hardcore area inside the entrance and all associated and ancillary site works
For development which will consist of a dwelling house with proprietary wastewater treatment system and polishing filter together with ancillary site works
For development which will consist of a domestic garage with home office and studio together with ancillary site works
To demolish the existing disused chalet / agricultural building and construct a new dwelling house, site entrance, private garage, on-site wastewater treatment system and all associated site works
To construct a private storage shed along with ancillary site works
To Extend the Appropriate Period of Planning Permission for P16-511 to build a dwelling house incorporating and refurbishing the existing structure to the rear as part of the new building, build a garage and install a waste treatment plant, and all associated ancillary works
To build a new storage shed and carport connecting onto the rear of the existing dwelling house and all associated site and ancillary works
Of the following a) the front boundary wall and entrance b) the changes made to the dwelling house c) the private shed along with associated site works
The development consists of the construction of a dairy with a waste water treatment system, slatted cubicle unit and associated site works
The development consists of the RETENTION of a conservatory extension to the side of the existing dwelling house together with ancillary site works
To construct a dwelling house, garage, wastewater treatment system with outfall to existing Doolin Inn wastewater treatment system, road access via existing Doolin Inn road entrance and associated site works
Of alterations to dwelling house as constructed under planning permission P22/44 together with ancillary site works
For proposed private dwelling house, detached garage, new site entrance, waste water treatment system all associated site works
To build a garage with home office area & all other associated site and ancillary works
For a proposed private dwelling house, new site entrance, waste water treatment system and all associated site works
To revise part of front elevation, to convert part of storage area to gift stall, and to relocate exit to proposed smoking area
To construct/install a structure for the serving food/beverages ancillary to the existing Doolin Inn complex along with associated site works
To Extend the Appropriate Period of Planning on P16/826 on the Grant of Outline Permission ( Planning Ref. No. P13-326 ) which will consist of the construction of a private dwelling house, garage, entrance, waste water treatment system/percolation area along with associated site works and services
For amendments to planning granted under P23/60130. The amendments include altering the position of the house, the garage and the site boundaries along with any associated works
To construct a new dwelling house, new entrance, access road, private garage and install a new wastewater treatment system along with all associated works
To construct a garage with a storage area to the rear of the existing dwelling house and all associated site works
To construct a new dwelling house, private garage, site entrance, on-site wastewater treatment system and all associated site works and services