To construct a slatted cattle shed incorporating calf creep area, calving pen, loose bed areas and cattle handling facilities, and to resurface silage slab and working apron and associated site works
For a single dwelling house, attached carport and garage, advanced wastewater treatment system along with ancillary site works
For the construction of a slatted agricultural building with an underground slurry storage tank for housing livestock on the existing farm complex together with all associated ancillary and incidental works
To construct a single dwelling house, advanced wastewater treatment system along with ancillary site works
Of changes to dwelling layout and elevations from previously granted permission 08/1292 which includes addition of playroom, utility and WC at the ground floor & additional extra floor area and conservatory to the rear, relocated site entrance, changes to site layout. PERMISSION to construct a single storey extension to the side of the dwelling and all associated site works
For Ballina/Killaloe Sports and Community Facilities Development Company (T/A Clarisford Park) in conjunction with Ballina Killaloe Active Retirement Group Ltd. are applying for full planning permission for 1) The construction of a new Petaque (Boules) Arena, c/w boundary fencing, lighting and spectator seating area and 2) The replacement of the existing grass surface on the sand based training pitch with a 4G Astro All Weather Surface. There are no proposed changes to existing flood lighting and fencing arrangements to the existing pitch area. A Natura Impact Statement has been submitted to the Planning Authority with the planning application
To fill the existing poor quality agricultural land with stone and soil in order to raise the level of the ground, re-locate existing agricultural entrance, including all ancillary site works
To demolish open slurry tank, construct slatted cubicle shed dungstead and associated site works
To refurbish an existing house and to construct a ground floor and a dormer roof extension, which includes the provision of a supported living accommodation unit, and all associated site works. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with this application
To refurbish an existing house and to construct a ground floor and dormer roof extension and a Granny Flat extension to the existing dwelling house and all associated site works
To RETAIN an Outbuilding/ Shed and all associated site works.
To construct a dwelling house and garage, with effluent treatment system, and all associated site works, accessed by an existing entrance and driveway from the public roadway
To erect a dwelling house and garage, install an effluent treatment for private domestic purposes and all associated site works
For a small extension (comprising staff room to existing creche facility and all associated site works
Of the following additions as constructed a) front porch b) granny flat and link to main dwelling c) fenestration changes d) rear storage sheds together with all associated site development works and services
To develop swimming platform, yoga deck, outdoor recreation area and changing stalls associated site works. A Natura Impact Statement accompanies this application
To construct extension to dwelling house, and all associated site works
To develop a swimming platform, and associated site works. A Natura Impact Statement accompanies this application.
To construct a dwelling with on-site wastewater treatment, a non-commercial workshop/store and a change of use of an existing agricultural entrance
For a new dwelling, wastewater treatment system, polishing filter, entrance and all associated site works
To construct a new dwelling house, garage, wastewater treatment system and all associated works
Of three number velux type roof windows to the front of existing dwelling house
To erect a dwelling house, garage, entrance and install an effluent treatment system and soil polishing filter and all associated site works
To RETAIN extension to dwelling house, consisting of first floor accommodation
For the construction of an extension and modifications to an existing dwelling house, upgraded site entrance and all associated site works
For a two-storey detached house, new site entrance, new septic tank connected to existing waste water treatment system and all associated works. A Natura Impact Statement will also be submitted to the Planning Authority
To erect a dwellinghouse, garage, entrance and install an effluent treatment system and soil polishing filter and all associated site works
To erect a dwelling house, garage, entrance and install a septic tank and percolation area and all associated site works
To RETAIN existing extension to the rear of house and all associated site works
To construct a garage with first floor study and link to their existing dwelling house along with all associated site works
To RETAIN concrete wall to font and side of farmyard
To remove existing septic tank and install an effluent treatment system and sand filter infiltration area and all associated site works
To construct a dwelling house and garage, with effluent treatment system, new entrance from public road and all associated site works
The development will consist of a new dwelling house, shed, site entrance, wastewater treatment system and associated site works
For development which will consist of change of design and location of house previously granted permission under planning ref: P21/27 and change of applicant's names as pertinent to Condition 2(a) of said permission
The development will consist of change of use of shed and minor modifications of shed design granted planning permission under P21/27 to Alternative Healthcare Consultancy Room and associated facilities
To RETAIN private domestic garage at the rear of house and all associated site works
For development which will consist of a dwelling house, proprietary treatment system and associated site works, including new road entrance
To RETAIN outbuilding and storage shed as constructed for domestic storage purposes, RETAIN gazebo as constructed and to RETAIN and repair glasshouse
To construct a dwelling house, garage, bored well, waste water treatment system, percolation area, entrance and all associated site works
To construct a dwelling house and garage, with effluent treatment system, new entrance from public road, and all associated site works
For development of a wind farm in the townlands of Fahy Beg, Fahy More North, Ballymoloney, Ballyknavin (Ed O'Briensbridge), Balllyquin More, Woodpark and Leitrim, Co Clare together with the development of an underground grid connection cable to the national grid. The underground grid connection is located primarily within the public road within the townlands of Leitrim, Fahy More South, Ballybrack, Aharinaghmore, Tooreen (Ed Cloghera) Aharinaghbeg, Knockdonagh, Roo East, Blackwater, Rosmadda West, Parkroe, Lackyle (Ed Ballyglass) and Castlebank, Co Clare. Temporary accommodation works to facilitate the delivery of wind turbine components to the site will be required in the townland of Ardataggle, Co Clare. The development will consist of: Construction of 8 no. wind turbines with a blade tip height range from 169m to 176.5m, a hub height range from 102.5m to 110m and a rotor diameter range from 131m to 138m; Erection of 1 no. permanent meteorological mast to a height of 100m above ground level; Construction of 1 no. onsite 38kV electrical substation to ESB Networks (ESBN) specifications and associated compound including Welfare facilities, Electrical infrastructure, Parking, Wastewater holding tank, Rainwater harvesting tank, Security fencing and all associated infrastructure, services and site works including landscaping in the townland of Woodpark; Installation of medium voltage electrical and communication cabling underground between the proposed turbines and the proposed on-site substation and associated ancillary works; Construction of turbine foundations and crane pad hardstanding area; Construction of new site tracks and associated drainage infrastructure; Upgrading of existing tracks and associated drainage infrastructure where necessary; Access to the proposed wind farm site will be from the R466 local road and will consist of the use of an existing quarry entrance in the townland of Leitrim which will be upgraded, as well as the creation of 1 no. new permanent site entrance on the Fahymore local road in the townland of Ballyquin More, and the use of 1 no. existing field entrance which will be upgraded, in the townland of Ballymoloney. The site entrances shall be used for both construction and operation of the proposed wind farm; All associated drainage and sediment control; Installation of new watercourse and drain crossings; Reuse and upgrading of existing internal watercourse and drain crossings; 2 no. temporary construction site compounds and
To erect a dwellinghouse and garage, install an effluent treatment and soil polishing filter and all associated site works
To construct dwellinghouse, garage, bored well, waste water treatment system, entrance and all associated site works
To construct dwellinghouse, garage, bored well, waste water treatment system, entrance and all associated site works
To build three tourism pods for short term rentals, access road off an existing private entrance, wastewater treatment system + percolation area and all associated site works
To demolish existing buildings on site, the construction a new dwelling house, new site entrance, connection to public services and all associated site works
To remove an existing shed and to construct a dwelling house and garage with effluent treatment system, new entrance from public road, and all associated site works
To construct a slatted shed and associated site works
To RETAIN constructed slatted cattle shed, site entrance and associated site works