To construct a new dwelling house, on-site wastewater treatment system and all associated site works and services
The development consists of the construction of an agricultural loose house and associated site works.
Of dwelling house as constructed, de-commission and close off existing septic tank, construct new advanced treatment system, bore new well and carry out ancillary site works
To RETAIN and complete extension to rear of house and all associated site works
To construct a dwelling House, domestic garage, vehicular entrance, effluent treatment system, including all associated site works and services
For the construction of a dwellinghouse, New Entrance, and Proprietary Wastewater Treatment System including ancillary site works
(Reference No. P21/886) to Clare County Council for the construction of a dwelling house, treatment system, stables, bored well, create new entrance to public road and carry out ancillary site works and for full planning PERMISSION for Stables, Hay Store and Dungstead
To construct dwelling house, treatment system, stables, bored well, create new entrance to public road and carry out ancillary site works
For refurbishment and alterations, and construction of an extension to an existing dwelling house along with all ancillary works
To construct a new dwelling house, access road, entrance, private garage and install a new wastewater treatment system along with all associated works
A partial first floor conversion from attic to storage with associated roof extension, elevation changes from that granted by previous permissions, car port, sheds to the rear of the property, a green house and a free standing archway
To construct a new dwelling house, private garage, site entrance, wastewater treatment system and all associated site works.
For the change of house plan previously granted under P18/572
Of the conversion of attic space to living accommodation
To demolish existing derelict dwelling house, construct new dwelling house, treatment system and carry out ancillary siteworks
Of the conversion of old stables to a guest cottage, connection to existing services and all associated site works. The stables area to the rear of Fort Edward House which is a protected structure
The development will consist of the restoration of the existing farmhouse, the repurposing and restoration of the existing farm building, the construction of a link corridor between the two, the installation of a wastewater treatment as well as all ancillary site works
To construct a single dwelling house, garage and advanced wastewater treatment system along with ancillary site works
To construct a storey and half dwelling house, installation of a wastewater treatment system and percolation area, new site entrance and associated site works
To construct a four bay slatted cattle shed with calf creep area and cattle handling facilities on our lands.
To erect a dwelling house, entrance, effluent system and polishing filter and associated site works
For development which will consist of the construction of a dwelling house, garage, a septic tank with percolation area and ancillary site works
To alter and extend dwelling house and associated site works.
To (a) Construct side extension and fenestration changes to existing cottage (b) Construct detached domestic garage together with all associated site development works and services
For development which will consist of a 10-year permission for a Synchronous Condenser and Battery Energy Storage System (BESS) across a site of approximately 2.97 hectares, co-located with an existing solar farm. The development will have an operational capacity of c. 50 MW and will consist of the construction of battery energy storage system units, power conversion units, a synchronous condenser, control modules and rooms, transformers and bunds, cooling equipment, a generator circuit breaker, an emergency diesel generator with associated fuel tank, water tank, underground cabling, fencing with access gates, CCTV and lighting posts, a temporary construction compound, new and upgraded access tracks, and associated landscaping, and ancillary works. The development would be in operation for up to 30 years. A Natura Impact Statement (NIS) has been submitted with this application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
For the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
To erect a dwelling house, entrance, garage, install an effluent treatment system and soil polishing filter and all associated site works
For development which will consist of the construction of a dwelling house, garage, a septic tank with percolation area and ancillary site works
The development consists of the construction of a slatted cubicle unit and associated site works
For the change of use of former garda station to a residential dwelling, the building up of the existing porch area and installing a window, relocation of the front entrance door, the construction of a new front porch, new windows on the west elevation and changes to door and window locations on the south elevation together with all associated site works
For the development of a dog park with shelter, parking area, modifications to existing entrance, signage and all associated site works to facilitate the proposed development
And completion of an extension and alterations to an existing dwellinghouse and to upgrade existing wastewater treatment system and all associated works
To alter, extend & refurbish existing dwelling house including all associated siteworks and services
To install an all weather astro turf training pitch with perimeter fencing and flood lighting and all associated site works
Of the converted garage for domestic use, the connecting porch area, the altered fenestration, internal layout and all associated and ancillary site works
To retain existing works & Permission for: internal alterations at existing property, The application comprises Retention of the existing 2 storey extension to the rear (previously demolished). Alterations include: minor demolition and rearrangement of the existing internal walls in order that same can be used as a single domestic dwelling house together with a new wastewater treatment facility and percolation area in adjoining lands & all ancillary works
Of the construction of a sun-room to the side of the dwelling and for the enclosing of the existing open porch area to the front of the house with glazing, all with associated site works and accessed by a shared entrance and driveway from the public road
To retain the as constructed covered outdoor dining areas to the side & the rear of existing village shop together with all associated site works
For development which will consist of demolishing remains of an existing structure and the construction of a dwelling house, with an effluent treatment system, upgrade of an existing access to a public road, and ancillary site works
For to erect a two storey extension to existing dwelling house and all associated site works
To construct an agricultural shed and all associated site works
For the construction of a new dwelling house and garage, complete with a new entrance, boundary wall, sewage treatment system and ancillary works
For the construction of a dwelling house, wastewater treatment system, utilising existing entrance including ancillary site works
For development which will consist of the construction of a single dwelling house, detached garage, advanced wastewater treatment system, new site entrance and ancillary site works
To carry out the following development: a) Construct a public car park on green field site in the village centre of Bodyke to include b) Provision of vehicular and pedestrian access from the R352 roadway via alterations to existing access. c) Provision of additional pedestrian access to the car park from the adjacent Bodyke Community Park. d) Provision of cycle parking and repair station. e) Installation of public lighting. f) Connection to existing surface water drainage system, via a proposed rain water garden. g) All ancillary site works. In accordance with the Habitats Directive, Appropriate Assessment Screening has been carried out on the project and the screening report accompanies the application. A preliminary examination of the nature, size and location of the development has been carried out pursuant to Article 120(1) of the Planning & Development Regulations, 2000 (as amended) and it has been concluded that there is no real likelihood of significant effects on the environment arising from the proposed deveopment and, accordingly an Environmnetal Impact Assessment is not required
To construct a dwelling house, entrance, driveway, wastewater treatment system, bored well and all associated site works
To remove one window from front elevation and replace this window with a door and convert part of existing store room on ground floor to entrance hall to provide separate entrance to existing residential unit on first floor
Of a Domestic Garage and Studio including ancillary site works
For development at this site in the townlands of Ballyvonnavaum TD, Coolshamroge TD, Cloonmore TD, Deerpark TD, and Manusmore TD, Ennis, Co Clare. The development will consist of planning permission for a period of 10 years to construct and complete a Solar PV Energy development with a total site area of 27.34 hectares, to include inverter station modules, solar PV panels ground mounted on support structures, internal access tracks, security fencing, electrical cabling and ducting, CCTV and other ancillary infrastructure, drainage, additional landscaping and habitat enhancement as required and associated site development works including works relating to the access to the site. The solar farm would be operational for 35 years. A Natura Impact Statement has been prepared in respect to the application for planning permission
For development, the development consists of the construction of a slatted unit and associated site works