First floor pitched roof extension over existing ground floor consisting of 3 bedrooms with a dormer window to front and side roof; 4 roof lights to side roof; extension to porch at ground floor level to front of dwelling.
7 terraced, 2 storey dwellings (4 end terrace and 3 mid terrace) with attic level and dormer window and 'Velux' to the front roof and 'Velux' to rear roof, each dwelling has new vehicular entrance to the Ballymount Road, 2 car parking space each in front garden, landscaping and boundary walls, new footpath and all associated works.
7 terraced, 2 storey dwellings (4 end terrace and 3 mid terrace) with attic level and dormer window and 'Velux' to the front roof and 'Velux' to rear roof, each dwelling has new vehicular entrance to the Ballymount Road, 2 car parking space each in front garden, landscaping and boundary walls, new footpath and all associated works.
Construction of a temporary logistics and storage facility within the Clonburris NorthWest Development Area of the Clonburris Strategic Development Zone (SDZ) Planning Scheme 2019. The facility includes the provision of a logistics facility comprising a warehouse (single story pitched roof c.11.356 meters in height) and adjoining unit (single storey pitched roof c. 6.22m in height) with a combined Gross Floor Area of 1,411sq.m; The provision of a single-storey ancillary office and staff facilities to include an office (25sq.m), canteen/ changing area (24.8sq.m), and WC (9sq.m); Vehicular and pedestrian access from the Fonthill Road (R113) to the east, 24 car-parking spaces, 5 HGV setdown parking spaces and turning/loading areas and 18 bicycle parking spaces; All ancillary site development works including attenuation, footpaths, lighting, landscaping boundary treatments and signage; The logistics facility will exist for a temporary period of up to 10 years to facilitate the delivery and storage of building materials throughout the construction phases of the development of the entire Clonburris Strategic Development Zone; The logistics facility will not be open to the general public; This application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015 all on wider lands bounded generally by Thomas Omer Way (L 1059) to the north, the Dublin-Cork railway line to the south, the Fonthill Road (R 113) to the east and undeveloped lands to the west.
Conversion of existing attic space; modifications of existing roof structure to gable, raising existing gable wall, dormer to rear and new access stairs.
Construction of single storey garden room consisting of home office and gym and all associated site works
Extension to existing external freezer plant platform structure to east of existing building and associated site works.
Roof dormer to the rear aspect of the roof and construction of a single storey 18sqm rear extension with flat roof.
Construction of a single storey extension to side of existing dwelling with internal modification and associated site works.
The development will consist of: The erection of two No. illuminated signs on the west and south facade of the existing building known as block 20 and all assocated site works.
Single storey attached metal storage unit floor area of 11sq.m and metal canopy to front elevation; Internal extension of first floor area by 50sq.m
Amendments to the development permitted under Reg. Ref. SD18A/0301 comprising of alterations to the permitted two storey data centre building including internal reconfiguration, alterations to finished floor levels, alterations to the building footprint to provide for the relocation of an internal staircore to the south of the building, and the replacement of the enclosed first floor level with an open screened roof mounted plant space (resulting in a reduction of 4,091sq.m in the gross floor area (GFA) of the data centre building); Associated alterations to the facade of the data centre building, including alterations to fenestration, cladding, step-out in the southern facade to accommodate a staircore, and a reduction in the eastern building parapet height of c. 2 metres; Provision of a canopy over the loading docks on the east facade; Alterations to the permitted generator compound, generators, and flues, including a reduction in the number of generators (5 now proposed), and provision of MV rooms within the generator compound; Provision of an ESB substation compound in the north-eastern portion of the site, comprising a single storey substation building (with a GFA of c. 125sq.m), within a 2.6 metre high security fence, 2 transformers, client control building (with a GFA of c. 47sq.m), and associated access arrangements; The ESB substation compound will be accessed from Kingswood Drive; Omission of the permitted sprinkler tank, pump room and 10kV Substation, reconfiguration of the permitted car parking, and revisions to permitted boundary treatments; Associated alterations to landscaping, access and internal road arrangements, services, lighting, and layout, and all associated and ancillary works.
Retention of an existing two-storey flat roof extension to rear and single storey pitched roof porch extension to front entrance of existing dwelling.
Retention permission for the construction of a single storey side and rear extension to existing detached single storey house as constructed and all associated site works.
Construction of a single storey side and rear extension to existing detached single storey house and all associated site works.
Extension to existing dwelling consisting of extension to rear of 57sq.m; conversion of attic into 2 bedrooms and ensuite bathroom with 3 dormer windows facing into garden of dwelling by raising the roof by 1.375m and extending the building to rear by 5.45m resulting in an increase of the area of the building from 52sq.m to 162sq.m.
Installation of site services including the construction of a new gravity foul sewer, foul pumping station and rising main discharging to the public sewer, connection to the public watermain, boundary landscaping and planting treatments including removal of central hedgerow, provision of 'green link' path. Installation of a sub-surface collector drain and infilling of central dry drainage channel. Vehicular and pedestrian/cyclist access points, internal road commencement (details as marked on submitted plans) and all ancillary development works as necessary to facilitate future development at this site.
Change of use of the second floor of the subject building to a Dental Practice comprising of 2 surgery rooms, offices, waiting room/reception, sterilisation room and toilets and ancillary site works.
This development will consist of the following works to the existing generator compound located at the north of the site: (1) the change of use from a generator compound to an enclosed bicycle store, (2) replacing the existing metal grate roof with a new single skin non-drip flat roof; to cover 24 secure bicycle store spaces and 3 electric scooter spaces.
Front porch and two storey extension to the side and rear of existing dwelling.
1 industrial storage building to the west of the main complex with an area of 465.3sq.m and a height of 8.8m; all associated site works and utility connections.
To apply for planning permission for a proposed Solar PV Panels to the warehouse roof Only as part of an overall warehousing development at Kingswood Road, Citywest Business Campus Co Dublin. (existing granted planning reg ref SD22A/0290 & SD23A/0281 with associated warehousing development works under construction on site). The subject elements for which Planning Permission is Sought are as follows: Provision of 243No Solar PV Panels, overall area525msq, to the warehouse roof only. Elevations Site plan & drainage layout remains the unaltered, and the building area remains as per previous planning applications
Amendments to ABP Ref. No. ABP-303803-19 requested pursuant to Section 146B of the Planning and Development Act, 2000 (as amended), can be broadly described as follows: Alterations to the layout, size and positioning of the concierge/reception area, communal amenity areas, creche and two number commercial units provided at the ground floor and omission of the previously approved office and two number apartments to facilitate the introduction of a larger commercial unit capable of accommodating a small supermarket; Removal of Core C to facilitate the introduction of a larger ground floor commercial unit and reconfiguration of the Block C’s internal space across first to fifth floor levels and the introduction of a glazed link between Blocks B and C at first floor level; Reconfiguration of the approved basement layout; Amalgamation and consolidation of communal amenity space serving the development at ground floor level; Relocation of the substation and switch room previously proposed in Block D to Block A and associated alterations to previously approved ground floor Apartments 2 and 3 in Block D and Apartments 1 and 2 in Block A; Minor alterations to party walls in Blocks A, B and D to accommodate a number of one-bedroom apartments in lieu of previous approved studio apartments; Minor alterations to previously approved facades, building line and internal partition walls to accommodate the aforementioned amendments and a slight increase in the number of apartments featuring within the development, from 196 no. to 204 number units.
The development consists of; (i) retention permission for amendments to the previously approved development (ABP Ref. No. ABP-303803-19) including: (a) reduction of the footprint of the approved basement level, providing 67 no. car parking spaces and 316 no. bicycle parking spaces; (b) removal of Core C and the provision of a glazed link bridge at first floor level between the approved blocks C and D; (c) alterations to the layout, size and positioning of the internal communal areas, with all communal amenity rooms and communal facilities now consolidated at ground floor level (407.7sq.m); (d) alterations to the layout, positioning and a reduction in the size of the approved creche unit (from l9lsq.m to 182sq.m) and relocation of associated external play space at ground floor level; (e) omission of the previously approved office space, gym space and 2 no. apartments (previously approved Apartment 1 Block C and Apartment 6 Block D) at ground floor level and the provision of additional commercial retail floor space (increased from 248sq.m to 604sq.m) comprised within 2 no. commercial retail units and associated amendments to building line; (f) relocation of substation and switch room from the ground floor level of the previously approved Block D to the ground floor level of Block A and associated alterations to previously approved ground floor Apartments 2 and 3 in the approved Block D and Apartments 1 and 2 in Block A; (g) minor internal alterations within the approved Blocks A, B, C and D to accommodate 8 no. additional residential units in total (8 no. one-bedroom units) and a revised unit mix of 17 no. studio units, 88 no. one bedroom units, and 99 no. two-bedroom units, to now provide for 204 no. units in lieu of the permitted 196 no. units (ABP Ref. No. ABP- 303803-19). Retention permission is also sought for: (ii) minor alterations to the previously approved facades and building materials; and (iii) all associated development works necessary to facilitate the development.
Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs, 2 no. roof windows to the front and flat roof dormer to the rear.
Ground floor partial side/front extension and porch; ground floor internal alterations; partial raising of roof ridge height and build up of walls at front and rear to create attic conversion, with dormer roof windows on both side roofs, and window at attic level in front elevation.
Demolition of all existing 1-3 storey industrial/commercial structures on the site (c. 5,500 sq.m). Construction of a 1-4 storey Transitional Care Facility (c.11,747 sq.m.) providing therapy and treatment space and a pharmacy and general practitioners space at ground floor level and 171 no. bedspaces at 1st to 3rd floor levels. 2 no. internal landscaped areas are provided at ground floor level (c.440 sq.m) and 2 no. outdoor amenity areas are provided at 1st floor level (c.483 sq.m). Provision of a coffee dock area, hairdresser, comms rooms, toilets, staff changing facilities, kitchen area, laundry rooms, lobbies/reception areas, admin areas, storage spaces, staff canteen, LV switch room, mains/ sprinkler tank room/ boiler room, multipurpose rooms, dining rooms, meeting and office rooms, sluice rooms, nurses stations, ancillary refuse storage area, ancillary generator, ancillary ESB substation and switch room associated with the operation of the facility throughout. Provision of Stair/lifts, photovoltaic panels, mechanical plant and green/blue roofs associated with the operation of the facility throughout. Partial provision of the pocket park identified in the Tallaght LAP (c.1,500 sq.m). Provision for the relocation and upgrade of the existing vehicular and pedestrian access point along First Avenue for servicing and staff parking and relocation and upgrade of the existing vehicular and pedestrian site access point along Cookstown Road. Provision of signage on the southern, eastern and northern facades of the proposed building and associated totem signage. All associated site development works above and below ground, services provision, connection to water supply and foul and surface water networks on First Avenue and Cookstown Road including partial diversion of the foul line to the north east of the site at First Avenue, attenuation/bioretention systems, provision of internal roads and footpaths, tree removal, bicycle storage (60 no. total spaces), staff and visitor car parking (55 no. total spaces) and 3 no. set down/ loading bays.
An amendment to the permitted commercial retail unit 2 at Blocks B/C as granted under ABP. Ref. 303803-19 and as amended under Reg. Ref. LRD23A/0006 and will compromise: i) the provision of an ancillary off-licence sales area of c. 29 sq.m within the permitted commercial retail unit 2 (c. 493 sq.m); ii) the provision of associated signage to the front elevation compromising 1 no. signage panel with backlit pin mounted lettering within the designated signage zone; internally illuminated projection sign; information signage and 1 no. internally illuminated sign over the customer entrance; iii) minor works including louvres to the rear elevation; new bi-parting doors, frosted vinyl, vinyl with graphic coverings and manifestations to glazing to the front elevation; iv) associated plant area to be provided at basement level; and v) all ancillary site services and site development works.
Amendments to the Warehouse Development permitted under SDCC Reg Ref SD22A/0290 comprising: the change of use of 272 sq/m of Warehouse Floor Area at Ground Floor Level to Ancillary Office and Staff Facilities; extension of the Ancillary Office and Staff Facilities (within the permitted building footprint) at First and Second Floor Levels (totalling 430 sq.m); elevational changes; provision of an additional 21 no. car parking spaces; relocation of bicycle parking; reduction in the size of the HGV yard; provision of a smoking shelter (3.9 sq.m); and all associated site and development works above and below ground. The total gross floor area of the permitted warehouse development will increase from 11,691 sq.m to 12,121 sq.m
Demolition of all existing 1-3 storey industrial/commercial structures and small cafe on site totalling c.5,500sq.m in area; construction of a 1-5 storey nursing home/step-down facility (131 bedspaces) over partial basement (total floor area c.6,743sq.m) with central courtyard (c.519sqm); construction of a deck-access apartment development comprising 139 residential units arranged in 2 blocks (Block A - 8 storeys and Block B - 5 to 6 storeys) with a total floor area of c.10,556sq.m excluding deck access (c.1,141sq.m); 2 commercial units comprising a cafe and pharmacy located at ground floor level facing Cookstown Road in residential Block A ( c.292sq.m in area); the residential development consists of 67 one bed/two person units, 12 two bed / three person units and 60 two bed/4 person units with north, south, east and west facing balconies throughout and residents amenity area at ground floor level; central communal open space (c.1,272sq.m); the basement serving the nursing home consists of a sprinkler tank and pump rooms, tank room, plant room and workshop; provision of dining and kitchen areas, siting/family rooms, activity rooms, coffee dock, hair salon, oratory, lobbies/reception areas, ancillary offices and staff areas, stores, toilets, shower/changing facilities, ESB substation, generator, switch room, service yard and waste areas serving the nursing home; provision of an ESB substation, switchboards, waste areas, water tanks and generator serving Blocks A and B; lobbies, stair/lifts, photovoltaic panels and green roofs throughout; partial provision of the pocket park identified in the Tallaght LAP (c.1,165sq.m); new vehicular access from First Avenue and egress onto Cookstown Road via a one-way system through the subject site; entrance signage on the eastern elevation of the proposed nursing home; all associated site development works, services provision, connection to the water supply, foul and surface water networks on First Avenue and Cookstown Road including partial diversion of the foul line to the north east of the site at First Avenue, attenuation/bioretention systems, vehicular and pedestrian access including internal road and footpaths, public realm upgrade works, landscape and boundary treatment works, tree removal, bicycle storage (307 spaces), car parking (42 spaces), set-down parking spaces including 1 ambulance space serving the nursing home and delivery/loading areas to Cookstown Road and First Avenue.
Internal adjustments to office/staff facilities resulting in a Change of Use of 59sq.m of warehouse floor area to office/staff facilities floor area on the ground floor plan (rear warehouse location) due to increase of 'Ancillary 1 Storey Driver's Office & Staff Facilities' and minor alterations (internal partitions relocation) to internal layouts at 'Main Ancillary Office' with no associated area change. Minor adjustment to dock leveller doors to facilitate detailed structural design and associated elevational adjustments with no area changes. Associated site plan adjustments due to the above alterations. All other details remain as per the granted applications Reg. Ref. SD22A/0290 & SD23A/0281.
The Proposed development will consists of permission of installation of 3no. high level external building signages, one to the Northeast elevation, one to the Southeast and one to the Southwest elevation and all associated works.
New external Freezer Plant Platform Structure; single storey MRO Stores building within the existing construction compound; external Data Centre unit to the south of the existing Manufacturing Suites Building; airlock extension & relocated external double emergency exit doors to the south of the existing Manufacturing Suites Building; Pallet Storage building adjacent to the existing Drum Store West building within the Utility Yard and boiler Water Chemical Dosing Unit within the CUB yard and all associated site works.
The development will comprise the provision of a warehouse with ancillary office and staff facilities and associated development. The warehouse will have a maximum height of 18 metres with a gross floor area of 11,691 sq.m including a warehouse area (10,604 sq.m), ancillary staff facilities ( 499 sq.m) and ancillary office area (588 sq.m); The development will also include: a vehicular and pedestrian entrance to the site from Kingswood Road to the north-east; a separate HGV entrance from Kingswood Avenue to the south-east; 64 ancillary car parking spaces; bicycle parking; HGV parking and yard; level access goods doors; dock levellers; access gates; hard and soft landscaping; canopy; lighting; boundary treatments; ESB substation; plant; and all associated site development works above and below ground; 2.56 Ha site at Kingswood Road and Kingswood Avenue, Citywest Business Campus, Dublin 24; The lands are generally bounded to the south-east by Kingswood Avenue, to the south-west by an ancillary car park associated with Citywest Business Campus, to the north-west by Kingswood Business Centre and Ardsolus Residential Development and to the north-east by Kingswood Road.
Demolish existing single storey extension at rear; construct a single storey extension at rear; construct a receded porch for front door at garage to tie in with existing.
(i) Demolition of the existing industrial and commercial buildings (15,989sq.m); (ii) construction of a mixed-use development featuring: (a) 1104 'build-to-rent' apartments in 4 blocks varying in height from four to eleven storeys. Each apartment has associated private open space in the form of a ground floor terrace or a balcony and has access to internal communal amenity spaces (totalling 2741sqm) and 5,107sqm of external communal amenity space at ground, first floor and roof levels; and (b) 4 commercial units at ground floor level of Blocks B and D (comprising of 2 in Block B accommodating a cafe/restaurant/bar; 1 in Block D accommodating Class 1, 2 and 8 uses as per the Planning and Development Regulations, 2001-2019, as amended; and 1 in Block D to serve the Circle K Belgard petrol station which is to be retained), 1,500sqm of office space across first to sixth floor levels of Block D and a crèche with external play area at ground floor level of Block C. The development is served by a total of 351 parking spaces (including 17 limited mobility parking spaces and 16 car share spaces) and 1860 bicycle spaces (1464 resident spaces and 396 visitor spaces); (iii) road, junction and streetscape upgrade works along First Avenue, Cookstown Road and Old Belgard Road, including the installation a signalised junction at the intersection of First Avenue and Cookstown Road and Old Belgard Road and Cookstown Road; (iv) construction of 3 new roads and 1 pedestrian/cycle link to the Belgard Luas Stop; (v) construction of a 1,688sqm landscaped public plaza with an outdoor flexible events space in the south-western corner of the site; and (vi) associated site and infrastructural works are also proposed which include: foul and surface water drainage; attenuation tanks; lighting; landscaping; boundary fences; plant areas; ESB substations; internal hard landscaping, including footpaths and street furniture; and all associated site development works. Any person may, within the period of 5 weeks beginning on the date of receipt by An Bord Pleanála of the application and on payment of the prescribed fee of €20 (except for certain prescribed bodies), make a submission or observations in writing to An Bord Pleanála, 64 Marlborough Street, Dublin 1 or online at www.pleanala.ie. Any enquiries relating to the application process should be directed to the Strategic Housing Development Section of An Bord Pleanála (Tel. 01-8588100).
Retention permission is sought for: Part (104 sq.m gross) of the first floor currently in light industrial use at Unit 5-9: Enlargement of ground floor window at Unit 5-9 on the north elevation enlargement of first floor windows at Unit 5-9 on the south elevation. Planning permission is sought for: (i)The change of use of Unit 4 (of 292.5 sq.m), including that part at first floor (104 sq.m) for which retention permission is sought, from light industrial use to office based industry use and amalgamation of Unit 4 with Unit 5-9 (1,505 sq.m gross) to provide a single office based industry unit of 1,797.5 sq.m gross together with all associated and ancillary works, including internal fit-out. (ii) At the south elevation of Unit 4: a. At ground floor, existing door, external shutter box, all supports and electrics to be removed and to be replaced with a new glazed door unit, and existing roller shutter door and all supports/electrics to be removed and replaced with new window unit. b. At first floor, 2 no. new aluminium/glass windows. (iii) 4 no. bicycle parking spaces, including provision for cargo bike.
Proposed 18m Multi-operator Streetpole Solution and ground equipment cabinet
(i) Conversion of existing attic to non habitable storage use; (ii) provision of dormer window to the rear and all associated site works.
Demolition and removal of existing single and two storey showroom extensions (485 sq Mts) to front elevation (facing Belgard Road) and side elevation (facing Cookstown Estate Road), along with removal of projecting canopy on this side elevation, re-fenestration to front facade (facing Belgard Road) along with a section of side facade (facing Cookstown Estate Road), to include fitting of new curtain walling with matching entrance doors along new wall cladding and new illuminated building signage and required site works.
Attic Conversion with WC dormer roof window & 1 no rooflight in rear slope of roof at attic Level
Single storey side extension to existing two storey dwelling and all associated works.
Erection of a 6000mm high totem style site sign for the Turnpike Business Park; the totem will be 1800mm wide x 250mm deep in plan, including lettering/numerals and illuminated elements to it's north and south sides and will be located at the east boundary of the site near the site entrance; associated works.
Planning permission for attic conversion with 2 dormers to rear roof to accommodate stairs to allow access to attic conversion as non-habitable storage space with roof windows to front all with associated ancillary works
Demolition of all existing 1-3 storey industrial / commercial structures and small café on site totalling c.5,500sqm in area; - Construction of a deck-access apartment development comprising 123 residential units arranged in 2 no. blocks (Block A 5 to 7 storeys and Block B 5 to 6 storeys) with a total floor area of c.9,806sqm including the proposed bike shelter (c.93sqm) and excluding deck access (c.901sqm); -Commercial floor space located at ground floor level facing Cookstown Road in Residential Block A (c.421sq.m); - The residential development consists of 58 no. 1 bed/2 person units, 12 no. 2 bed/3 person units and 53 no. 2 bed/4 person units with north, south, east and west facing balconies throughout and residents amenity area at ground floor level; -Central communal open space (c.1,303sq.m); -Provision of an ESB substation, switchboards, waste areas, water tanks and generator serving Blocks A and B; -Lobbies, stair/lifts, photovoltaic panels and green roofs throughout; -Partial provision of the pocket park identified in the Tallaght LAP (c.1,286sq.m); -New vehicular access from First Avenue and egress onto Cookstown Road via a one way system through the subject site; -All associated site development works, services provision, connection to the water supply, foul and surface water networks on First Avenue and Cookstown Road including partial diversion of the foul line to the north east of the site at First Avenue, temporary foul pump station. attenuation/bioretention systems, vehicular and pedestrian access including internal road and footpaths, pedestrian facilities/public realm upgrade works, landscape and boundary treatment works, tree removal, bicycle storage (302 no. total spaces) comprising 276 no. spaces (serving proposed mixed use development) and 26 no. spaces (serving concurrent transitional care facility application), car parking (32 no. total spaces) comprising 15 no. spaces (serving proposed mixed use development) and 17 no. spaces (serving concurrent transitional care facility application), 2 no loading bays (one each on First Avenue and Cookstown Road), 2 no. setdown/loading areas to the internal road and 1 no. ambulance setdown space serving the adjacent concurrent proposed Transitional Care Facility. The concurrent application has been made to South Dublin County Council regarding a 131 bed Transitional Care Facility on the western portion of the site (SDCC Ref SD22A/0361 refers) currently under appeal to An Bord Pleanála (ABP Ref 317394).
Demolition of all existing 1-3 storey industrial/commercial structures and small cafe on site totalling c.5,500sq.m in area; Construction of a 1-5 storey Transitional Care Facility (step-up/step-down) providing 131 bedspaces over partial basement (total floor area c.6,743sq.m) with central courtyard ( c.519sq.m ); The basement consists of a sprinkler tank and pump rooms, water tank room, plant room and workshop; Provision of dining and kitchen areas, siting/family rooms, activity rooms, coffee dock, hair salon, oratory, lobbies/reception areas, ancillary offices and staff areas, stores, toilets, shower/changing facilities, ESB substation, generator, switchroom, service yard and waste areas serving the facility; Lobbies, stair/lifts, photovoltaic panels and green roofs throughout; Partial provision of the pocket park identified in the Tallaght LAP (c.1,286sqm); New vehicular access from First Avenue and egress onto Cookstown Road via a one-way system through the subject site; Entrance signage on the eastern elevation of the proposed facility; All associated site development works, services provision, connection to the water supply, foul and surface water networks on First A venue and Cookstown Road including partial diversion of the foul line to the north east of the site at First A venue, temporary foul pump station, attenuation/bioretention systems, vehicular and pedestrian access including internal road and footpaths, interim pedestrian facilities/public realm upgrade works, landscape and boundary treatment works, tree removal, bicycle storage (76 total spaces), car parking (32 total spaces), set-down parking spaces, 1 ambulance set-down space serving the facility and delivery/loading areas to First A venue.
The existing single-storey extension will be demolished, and a new single-storey extension will be added to the side of the main house, linking the two buildings. Second single-storey extension to the side of the linked building. Dormer window to the rear roof area of the new extension. New single-storey porch to the front.
Combination of single storey and two storey flat roof extensions to the rear of the existing building along with associated internal modifications and siteworks.
Combination of single storey and two storey flat roof extensions to the rear and side of the existing building along with associated internal modifications and siteworks
2 industrial storage buildings to the west of the main complex; Building no. 1 - 460sq.m with a height of 8.8m; Building no. 2 - 244.4sq.m with a height of 7.0m; all associated site works and utility connections.