Single storey front and side extension (28sq.m) consisting of front porch, playroom and utility room; external wall and roof finishes to match existing dwelling.
Single storey extension to side and rear of existing dwelling and all associated site works
For a side access gate, relocation of front entrance pier to widen driveway and all associated site development works.
Planning permission for a change of use of attic space to habitable accomodation and retention planning for a detatched conservatory/greenhouse.
Construction of two single storey data centres with associated office and service areas; and three gas powered generation plant buildings with an overall gross floor area of 24,624sq.m that will comprise of the following: Demolition of abandoned single storey dwelling, remaining agricultural shed and derelict former farm building; Construction of 2 single storey data centres (12,797sq.m), both with associated plant at roof level, with 24 standby diesel generators with associated flues (each 25m high) that will be attached to a single storey goods receiving area/store and a single storey office area (2,404sq.m) located to the west of the data centres as well as associated water tower and sprinkler tank and other services; Amendments to the internal access road and omission of access to loading bay permitted under SDCC planning Ref. SD19A/0042/ABP Ref. PL06S.305948 that include the relocation of permitted, and new, internal security gates; and new internal access roads to serve the proposed development that will provide access to 39 new car parking spaces (including 4 electric and 2 disabled spaces) and sheltered bicycle parking to serve the new data centres; The development will also include the phased development of 3 two storey gas powered generation plants (9,286sq.m) within three individual buildings and ancillary development to provide power to facilitate the development of the overall site to be located within the south-west part of the overall site. Gas plant 1 (3,045sq.m) will contain 20 generator units (18+2) with associated flues (each 25m high) will facilitate, once operational the decommissioning of the temporary Gas Powered Generation Plant within its open compound as granted under SDCC Planning Ref. SD19A/0042/ABP Ref. PL06S.305948. Gas plant 2 (3,045sq.m) will contain 20 generator units (18+2) with associated flues (each 25m high). and, Gas plant 3 (3,196sq.m) will contain 21 generator units (19+2) with associated flues (each 25m high). These plants will be built to provide power to each data centre, if and, when required. The gas plants will be required as back up power generation once the permitted power connection via the permitted substation is achieved; New attenuation pond to the north of the site; Green walls are proposed on the southern elevation of each power plant, as well as to the northern elevation of the generator compound of the data centres, and enclosing the water tower/pump room compound, and a new hedgerow is proposed linking east and west of the site; Proposed above ground gas installation compound to contain single storey kiosk (93sq.m) and boiler room (44sq.m). The development will also include ancillary site works, connections to existing infrastructural services as well as fencing and signage. The development will include minor modifications to the permitted landscaping to the west of the site as granted under SDCC planning Ref. SD19A/0042/ABP Ref. PL06S.305948. The site will remain enclosed by landscaping to all boundaries. The development will be accessed off the R120 via the permitted access granted under SDCC planning Ref. SD19A/0042/ABP Ref. PL06S.305948. An EPA-Industrial Emissions (IE) licence will be applied for to facilitate the operation of the gas powered generation plant. An Environment Impact Assessment Report (EIAR) has been submitted with this application. All on a site of 22.1hectares.
The development will consist of the amendment of Condition no. 3 (ii) and 3 (iii) of the permission granted under Reg. Ref. SO21A/0042 that related to the Gas Plant of the overall permitted development only, so that these aspects of the new condition shall read as follows: Condition no. 3(ii) Within four (4) years from the date the first Gas Plant commences operation, the applicant or operator shall undertake a review with GNI of the ability to serve the Gas Plant with green gas and / or hydrogen (or similar fuels) shall be Investigated and reported to the Planning Authority. Any ability for the Gas Plant to be operated with green gas and/ or hydrogen (or similar fuels) shall be implemented within an agreed timeline agreed with GNI. Condition no. 3(iii) If the applicant receives a firm offer from Eirgrid under which the Gas Plant is not required, and the connection has been realized with capacity onsite from Eirgrid, then the Gas Plants shall be removed from the entire site within a year of the ceasing of operation. The nature and extent of the permitted Gas Plants, or any other element of the parent permission granted under Reg. Ref. SD21A/0042 will otherwise not be amended by this application. An EPAIndustrial Emissions (IE) licence will be applied for to facilitate the operation of the Gas Plant that Is subject of this amendment application.
Relocation of the temporary gas powered generation plant for a further two years from lands to the rear of the Takeda Ireland complex to the east of the site; to lands to the immediate north-west within the Edgeconnex campus and to the immediate east of the data centre granted and built under Reg. Ref. SD17A/0141 and SD17A/0392; the relocated temporary gas powered generation plant will be enclosed within a walled yard of 2,836sq.m containing 12 generator units with associated flues (each 15m high) that was permitted for a period of three years on the 15th May 2017 under condition No. 4 of permission granted under Reg. Ref. SD17A/0027; vehicular access to the generation plant will remain from the permitted service road into the Edgeconnex site and Grange Castle Business Park as originally permitted.
Attic conversion to storage space to include the following: existing main hipped roof design changed to a gable end style roof with a small 'Dutch' hip in its design, one roof light on main front elevation roof surface and two roof lights on main rear elevation roof surface.
Retention of rear dormer extension and attic conversion to existing two storey, end of terrace dwelling including: rear dormer extension with a roof light to facilitate stair access to the attic; attic conversion to include storage space and a playroom; 3 roof lights to the rear of existing roof; all associated ancillary site works.
Permission for conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs, 2 no. roof windows to the front and flat roof dormer to the rear.
Ground floor extension to side and rear of house.
Erection to side and rear of existing dwelling and associated site works.
Construct new first floor bedroom extension over ground floor car port extension to south of existing dwelling.
2 storey extension to front/side/rear elevations to the south of existing dwelling; comprises of home office at ground floor level; bedroom with en-suite bathroom at first floor level and all associated site works.
Planning Permission for a two-storey side and rear extension, along with a single -storey infill rear extension and all associated site works
Removal of existing prefabricated structure on site with replacement permanent detached two storey/dormer structure located to the south-west of the site for mixed flexible community uses (such as childcare/creche/playschool/community uses) and all associated site works. The development is within the curtilage of a site that includes a protected structure 025, James Mc Carten Memorial Slab 1807 and within a natural area adjoining the Liffey Valley.
Retention of 3.4sq.m existing ground floor area to the rear of the existing surgery; permission for a ground floor single storey extension 9.4sq.m to the front of the dental surgery to enlarge the waiting area as the previously approved permission Reg. SD08A/0273; Change of use of the existing first floor apartment (64sq.m) into an extension to the existing dental surgery comprising a new sterilising area and 2 new surgeries together with all associated site works.
New dormer roof to rear.
Retention Planning Permission for a detached shed structure constructed to the left side of main home, containing home gym and store areas.
Subdivision of existing bedrooms and the formation of openings in partition walls to form a total of 5 ensuite bedrooms on ground floor level and 11 ensuite bedrooms and one bedroom on first floor level to include associated new foul drainage and the removal of existing first floor ensuite structure to rear,; demolition of existing single storey 20th century laundry/stores extensions to side; construction of new single storey kitchen and stores; demolition of existing porch and reconstruction of new porch in kitchen yard; the removal of existing bathrooms on ground and first floor over to accommodate the installation of a lift; change of use of existing chapel for use as mission office to include internal rearrangement of existing sacristy to form tea room and toilets and construction of new entrance door and ramp; removal of 2 no. external steel fire escape stair structures to rear and fire safety measures to existing structure to include installation of internal fire rates compartment screens and door in existing corridors; erection of partition to form corridor to existing porch to maintain access to adjoining church yard; form plant room on ground floor; the enlargement and rearrangement of the existing car parking area to front of convent to provide 12 parking spaces including 2 disabled parking spaces and associated landscaping works.
Retention permission will consist of Ground floor only extension to the side/rear of the existing house. A new storage shed at rear of site and all ancillary works.
Retention permission will consist of a ground floor only extension to the side/rear of the existing house. A new storage shed at rear of site and all ancillary works.
The erection of 1 no. single storey detached ancillary accommodation garden room (approx. 30.5m2 gross internal area) including associated site works in rear garden on overall site comprising 0.0167 hectares (circa 167 m2) approx.
The development will consist of the construction of a single-storey extension to the rear of the existing dwelling to provide kitchen, dining and living accommodation, the conversion of the existing garage to the side of the dwelling to provide a playroom, the construction of a single storey extension to the front of dwelling to provide a new porch, the construction pf a first - Floor extension to the side of dwelling to provide a new bedroom, together with internal alterations and all associated site works.
Demolition of single storey shed to rear of existing dwelling and the removal of chimney to side; construction of first floor extension to side with pitched roof to match existing; construction of a part single/part two storey extension to the side and rear; construction of a dormer window to the rear at attic floor level; construction of side bay window to south-west elevation at ground floor level; widen existing vehicular entrance to 3.5m; other works as part of the development include alterations to all elevations; rooflights; SuDS drainage; landscaping and all associated works to facilitate the development.
Demolition of the existing side concrete shed and chimney stack; Construction of a double storey side extension & a single storey extension at rear and a dormer extension for storage; and rooflights at the front; widening the existing vehicular access; internal alterations & all associated site works.
A single storey ground floor extension to side/ rear, including, demolition of part of existing kitchen extension, removal of existing rear sheds, drainage works and a gate to existing side boundary wall, into the existing garden.
Single storey pitched roofed ground floor extension with a 'Velux' type window in the roof slope all located to the front of the existing property and for uses associated with the existing use of the property as a single family dwelling. The proposed development will include changes to the front and part side elevations.
Attic conversion, including change of roof profile from dutch hip roof to gable, dormer window to rear of roof, rooflight to front of roof and a new window to side elevation of existing dwelling.
Demolition of existing garage to side and erection of new two storey house with attic conversion and 'Velux' rooflights to front and rear with all associated site and drainage works.
Retention of 2 prefabs as childcare facilities within the curtilage of a Protected Structure 025 - James MacCarten slab 1807 within a National Heritage Area adjoining Liffey Valley.
Single storey pitched roofed ground floor extension with a 'Velux' type window in the roof slope all located to the front of the existing property and for uses associated with the existing use of the property as a single family dwelling. The proposed development will include changes to the front and part side elevations.
Retention and continuance of the use for a further two years of the temporary gas powered generation plant, that is located to the rear of the Takeda Ireland complex, that is sited within a walled year of 2,836sq.m containing 12 generator units with associated flues (each 15m high), which was permitted initially for a period of three years under Reg Ref. SD16A/0345 and was subsequently extended for an additional period of 2 years from the 4th February 2020 under Condition no. 2 of permission granted under SD19A/0342 Vehicular access to the generation plan will remain from the permitted service road into Edgeconnex site and Grange Castle Business Park as originally permitted.
Attic conversion incorporating dormer extension to side; all associated site works.
Planning Permission for a standalone extension to rear comprising of an office, activity room & storage including all associated siteworks
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs, 2no. roof windows to the front and flat roof dormer to the rear.
Change of roof profile from hip end to full gable end profile to accommodate dormer extension to the rear (b) 1 No. velux roof light to front elevation (c) All associated site works.
Demolition of a lean to annex and a brick coal shed both at the rear of the property. Making good of the shared roof and shed wall of no. 48 Beech Grove to which the shed of No. 49 abuts.
Attic conversion including a change of roof profile from hipped roof to a half-hipped gable-ended profile, a rear dormer roof extension, a new window to the gable wall and new internal access stairs, and all associated site works.
Planning Permission is sought for alteration/extension of the existing two-storey end of terrace house, comprising demolition of the existing rear bay window, and construction of a new single storey flat roof rear extension, with rooflights, and a new two-storey side extension, with Dutch-hipped pitched roof, modifications to the existing fenestration, plus associated internal alterations and site development, including provision of a new vehicular access gate from the roadway to the rear garden.
The development will consist of the partial change of use of the ground floor of an existing dwelling to a childcare facility and a proposed extension to the ground floor to form part of the childcare facility that will accommodate for early childhood care and education (ECCE) scheme. The development includes (A) a new side entrance to the proposed childcare facility, (B) a proposed rear extension to the existing ground floor measuring 12m2, (C) internal alterations to include a proposed accessible WC and minor demolition to accommodate for the new extension, (D) dishing of existing footpath to front of dwelling to accommodate greater vehicular access to site, (E) and all associated ancillary site works.
Partial change of use of the ground floor of an existing dwelling to a childcare facility; proposed ground floor extension to form part of the childcare facility; new side entrance; proposed rear extension to the existing ground floor measuring 12sq.m; Internal alterations to include proposed accessible wc and minor demolition to accommodate new extension; all associated ancillary site works.
Development comprising of new pitch roofed two storey extension to side incorporating new garage at ground floor level, and all associated site works.
The construction of a 2-storey extension and any associated site works to the south elevation of the existing engineering stores in the administration offices building which comprises of construction of circa 34sq.m area with a maximum height of 9.4m to accommodate two storey units at Grange Castle Business Park, Grange Castle, Dublin 22. The application relates to development which comprises of an activity, which requires an Industrial Emissions Licence in accordance with the First Schedule of the EPA Act 1922 as amended.
The Development will consist of an Attic conversion including a dormer window to the side of existing roof and an new window to side elevation at ground floor level. The development will also include the widening of existing vehicle entrance to front of site and associated site works
Change of use of area of single storey detached timber cabin in rear garden, previously wc (3sq.m) & timber cabin (23sq.m) to family flat (26sq.m); construction of single storey shed (5sq.m) & wc (3sq.m) in rear garden.
Demolition of a one storey warehouse building (c.1,051.2sq.m) and site boundary wall and the construction of 11 three storey residential units; 11 three bed units ranging in size from c. 105.9 - 112.2sq.m all with associated private back gardens, balconies and terrace areas; vehicular and pedestrian access is proposed off the Lower Lucan Road via two entrance points; 17 car parking spaces (including 1 disabled); sheltered bicycle storage and bin storage at surface level; a central public open space area of c. 282sq.m with all boundary treatment and landscaping works as well as all associated site development works on an overall site of c. 0.242Ha.
Single storey extension to the side and rear of dwelling comprising of bedroom, bathroom, family room and dining room.
Temporary single storey prefabricated building located on the existing school staff car park within the site, measuring a total of 855.3sq.m and will include 9 general classrooms, staff & pupil toilets, ancillary staff/multi-purpose room and circulation. It will also include minor temporary alterations to the existing hard and soft landscaping to accommodate the temporary accommodation. These prefabs will be used to facilitate the remediation works in the Phase 1 Griffeen Valley ETNS building and will be required for a period of 12 months from the date of commencement of the works on site.
To construct a two storey rear extension, kitchen extension ground floor, bedroom extension first floor, to our property and associated site works