Permission for development which consists of; change of use of an existing dwelling to a short term rental dwelling (air B&B)Grounds not yet categorised
Permission for development which consists of the construction of a a 182sqm single storey extension to the Operating Theatre Department, and a 60sqm extension of the existing Theatre Plantroom on the first floor level, and associated worksDecision record indexed
To construct a dwelling house, garage, and wastewater treatment system and all associated works. Gross floor space of proposed works: 224.69 sqmDecision record indexed
Permission for development which consists of construction of a 181m2 single storey extension to the Theatre Department, and a louvre screen 1.5m high around 60m2 external Theatre Plant on the first-floor level, and associated worksDecision record indexed
Permission for development will consist of retention of (1) minor changes to existing building elevations including, alterations to existing window & door openings, (2) removal of portion of boundary wall, (3) demolition of external stairwell, and permission for (i) change of use of part of ground floor, first floor and second floor from existing Enterprise Centre to office (area for change of use 974 sqm). (ii) construction of new two storey stairwell extension (gross floor area 31 sqm). (iii) doubled-sided standalone pole sign, (iv) construction of all ancillary site features, including signage, car parking, boundary treatment and associated site worksDecision record indexed
Permission for development which will consist of minor amendments and retention to previously granted planning permissions ref:15/320 (BP Ref PL.61.246535) & 17/378. Amendments to include: (A)The re-orientation of vehicular access to houses no.71 and 73 with the omission of the existing turning area. Access to these houses will be from the existing development entrance point which is located opposite House No.79. (B) Introduction of additional communal open space which will be landscaped and (C) Retention of connectivity footpaths (i) adjoining the existing public footpath to the Southern corner of the site and (ii) footpath providing connectivity to park across point to the Eastern corner of the siteDecision record indexed
Permission for development which consists of: the demolition of the existing single storey dwelling with built in roof space and the construction of a two storey building containing 4 No. two bedroom residential units and all associated site and external works including a widened site entrance, drainage connections and ancillary sheltered bin store and storage shedsGrounds not yet categorised
To demolish the existing single-storey side extension to their dwelling, the provision of a single storey and two storey extension to the side elevation of their dwelling, the provision of a single storey extension to the rear elevation of their dwellingDecision record indexed
For a new ground and first floor side extension and single storey rear extension, alterations to existing elevations, internal alterations and all ancillary site works and services. Gross floor space of proposed works: 136.60 sqm(H), 43.40 sqm(extension)Decision record indexed
To construct a dwellinghouse, sewage treatment plant, domestic garage, percolation area, and associated services. Gross floor space of proposed works: 240.00 sqm(H), 55.46 sqm(G)Decision record indexed
Permission for development which consists of: retention of (1) Change of use from retail to Creche/Montessori School at 66D Renmore Road, Renmore, Galway, H91P0E2, (2) external play area for creche/montessori school located in part of rear garden of 53 Dun na Mara, Renmore, Galway, H91C5KH and (3) footpath between rear of 66D Renmore Road and play area to rear of 53 Dun na MaraDecision record indexed
Planning permission for the retention of (1) change of use from retail to creche/Montessori school at 66D Renmore Road, (2) External play area for creche/Montessori school located in part of rear garden of 53 Dun na Mara, Renmore, Galway, H91 C5KH and (3) footpath between rear of 66D Renmore Road and play area to rear of 53 Dun na MaraDecision record indexed
For residential development. The proposed development consists of the provision of a total of 74 no. residential units as follows - 4 no. 3 bed semi-detached housing units, 4 no. 3 bed terraced housing units, 38 no. 2 bed apartment units, and 28 no. 3 bed duplex townhouse units together with all associated landscaping and site works and connection to existing services. The planning application is accompanied by a Natura Impact Statement. Gross floor space of proposed works: 6,744.8 sqmGrounds not yet categorised
Permission for development which consists of: permission to sub-divide and construct an extension to the rear of the existing Dwelling of no.63 Renmore Road,Galway City. These amendments proposed are to provide 4 no. residential units within the building, the permission sought is to include all façade amendments, access amendments & associated services and landscaping / carparking at the site.Grounds not yet categorised
Planning permission is sought for the development which will consist of the construction of a new sun room to the south of an existing dwelling and a new window to the east of the same dwellingDecision record indexed
For extensions to existing house at ground and first floor level, modifications to original house, upgrade of wastewater treatment system and all ancillary site works. Gross floor space of proposed works: 57 sqm. Gross floor space of proposed works: 12.65 sqmDecision record indexed
For development which will consist of alterations to previously approved permission Ref No. PL 21178 including the addition of two dormer windows, minor alterations to permitted window openings and associated works.Decision record indexed
Permission for development which consists of the construction of a 150m2 plant platform to house geothermal heat pumps. It will be located above the existing electrical energy centre. The application includes the construction of a louver screen to the north elevation to conceal the geothermal heat pumps when viewed from the Dublin Road and associated worksDecision record indexed
To construct a dwelling house with a waste water treatment plant, percolation area and all associated site works. Gross floor space of proposed works: Dwelling House 215 sqmDecision record indexed
Permission for development which consists of: to modify existing roof attic area for use as bedrooms and associated elevation changes to construct rear ground floor extension to existing dwelling and associated servicesDecision record indexed
Merlin Park Industrial Estate and Doughiska Road, Townland of Doughiska, Galway Co. Galway
RED III Permission for development which consists of: the construction and operation of a development consisting of an energy centre building, heat network pipeline, landscaping works, roof mounted solar PV and all other associated ancillary infrastructure at the Merlin Park Industrial Estate and Doughiska Road, within the townland of Doughiska, Galway, Co. Galway. The Galway City East Energy Centre building will integrate multiple low carbon energy technologies. The development will include the installation of 2no. Air Source Heat Pumps (ASHPs) each with a 1.5MW capacity, 2 no. electric boilers, each with a 1.5MW capacity to handle peak loads and temperatures, and 2 no. gas boilers, each with a 1.5MW capacity for emergency back up support. The proposed energy centre building will have a building height of 6.2m, with solar PV panels mounted on the building rooftop. The adjacent building to the east (Smurfit Westrock), will have solar PV panels mounted on the building rooftop. The building to the north (Value Centre), will also have roof mounted solar panels. The proposed development will also include a heat pipeline network consisting of 2no. pipes, with a maximum diameter of 450mm each, spanning a distance of circa. 2390m in an underground trench, from the proposed energy centre building to Doughiska Road, along the length of Doughiska Road, crossing Monivea Road to the north, terminating outside the Clayton Hotel, and crossing Old Dublin Road to the south, terminating outside the Castlegar GAA Club, linking the proposed Galway City East Energy Centre building to future heat customer buildings in the area. Ancillary development will consist of security fencing, access and parking, drainage infrastructure, and landscaping works at the proposed energy centre building. Site preparation will involve foundation works, and construction of essential access facilities to support overall functionality for the purpose of generating renewable heat energy and transmitting it to future heat customer buildings within the townland of Doughiska, Galway Co. Galway (the Proposed Development). Permission is sought for a ten year construction period.Decision record indexed
Permission for development which will consist of the relocation of 26 no. car park spaces, from the previously permitted location outside of the site ownership (Pl. Ref. No. 13/322), to a location within the site ownership, including subsequent alterations to site layoutGrounds not yet categorised
For the construction of a single-story extension and all associated services onto the rear of an existing dwelling house. Gross floor space of proposed works: 73.70 sqm Gross floor space of any demolition: 5.30 sqmDecision record indexed
Permission for development which will consist of the construction of a new front porch and a new single storey extension to the rear of existing dwelling with alterations to elevations and associated site worksDecision record indexed
Unit 6-8 Doughiska Road, Merlin Commercial Park, Galway
Permission for development which consists of the retention of first floor level floor space and associated alterations created by the addition of a mezzanine within previously approved 2 storey warehouseDecision record indexed
For: (A) an existing steel structure agricultural/hay shed. (B) The retention of an existing steel and timber framed two horse/pony stall/shed with covered horse/pony tackle area. (C) All associated building works and allassociated site works. Gross floor space of work to be retained: 34.60 sqm(hay shed), 23.83 sqm(horse shed)Decision record indexed
Permission for development which consists of: planning permission to partially demolish a rear extension to the dwelling and construct a ground-floor rear extension, comprising a bedroom, a new kitchen, utility and living areas, together with internal modification and new front roof windows and elevation changesDecision record indexed
To erect dwelling house, waste water treatment system, polishing filter and all associated services. Gross floor space of proposed works: 213.30 sqmDecision record indexed
Permission for development which consists of a) the construction of an extension to an existing community dwellinghouse, b) for associated internal alterations and c) for all associated site development worksDecision record indexed
Permission for development which consists of: retention & completion of dwelling house, including the removal of structurally unsound walls and foundations and minor alterations to the original design granted under planning ref. 24/60081, including all associated worksDecision record indexed
Permission for development that consists of the renovation and extension of existing dwelling as follows: (a) removal of existing pitched roof and construction of new first floor accommodation with flat roof, (b) ground floor extensions to the front and rear, (c) alterations to existing elevations (d) new garden shed, (e) associated site worksDecision record indexed
Permission for development which consists of (i) To Demolish the existing dwelling house (ii) The provision of a single detached dwelling house on Site “76A”,Decision record indexed
For dwelling house, septic tank and percolation area on revised site boundaries. (Previous permission ref. 98/4638). Gross floor space of work to be retained: 119.50 sqmDecision record indexed
Permission for development which consists of the following A) Demolition of derelict cottage, front boundary walls and garden walls within site, and associated outbuildings; B) Construction of 6 no. residential units consisting of 6 no. 2 storey detached houses; C) New vehicular entrances and pedestrian entrances onto Renmore Road D) Boundary treatments; and E) Provision of all associated surface water and foul drainage services and connections ancillary to the residential development and all associated site worksDecision record indexed
Permission for development which consists of: A. Demolition of front boundary walls; B. Construction of 2 no. residential units consisting of 2 no. 2 storey detached houses; C. New vehicular entrances and pedestrian entrances onto Renmore Road; D. Boundary treatments; and E. Provision of all associated surface water and foul drainage services and connections ancillary to the residential development and all associated site worksDecision record indexed
Permission for development which consists of; (a) construct a first floor extension, over previous ground floor exempted development extension, including the provision of an additional first floor window to the side elevation of the existing dwelling house, (b) retain existing garden shed, and all associated site works at 22 Belmont, Renmore, Co. Galway, H91 PXT9Decision record indexed
Permission for development which consists of A) Construction of a single two storey detached house; B) Boundary treatments; and C) Provision of all associated surface water and foul drainage services and connections ancillary to the residential development and all associated site worksDecision record indexed
Permission is sought for the development which will consist of the construction of a front porch extension to a dwelling house along with all associated site services/worksDecision record indexed
For a) retention of a rear garden store extension, b) alterations & side extension to an existing two storey dwelling including energy upgrades & associated elevational changes, c) a standalone domestic shed to the rear with roof link to existing and all associated external worksDecision record indexed
Unit 1 & Unit 2, Merlin Commercial Centre, Doughiska
Permission for development which will consist of the following: a) the change of use of existing premises from warehouse/light manufacturing to a sports recreational facility b) to increase the mezzanine floor area in Unit No.2 c) new internal access between Unit 1 & Unit 2 d) for the erection of signage to the front elevation and all associated site servicesDecision record indexed
Permission for development which consists of: (1) Permission sought to construct new two storey dwelling house with access through existing development and (2) All associated site works and services.Grounds not yet categorised
Permission for development which consists of the demolition of existing substandard single storey extension and porch area, also to include construction of new extension to side elevation, new porch to the front elevation and minor changes to existing dwelling along with all associated site works and connections to existing site servicesDecision record indexed
For the Installation of a 0.82MW solar photovoltaic system on the roofs of the Zimmer Biomet premises, along with the associated fixing and mounting systems. Installation of a battery energy storage system to comprise of 2 no. inverters and 2 no. 1.04 MWh batteries. Installation of a back-up generator. Installation of 2 no. transformers. All ancillary development including the provision of supporting concrete plinths, perimeter fencing, electrical cabling and on-site drainage.Decision record indexed
Carrowmoneash, Unit 12 Oranmore Business Park Oranmore, Co. Galway
For (1) change of use of part of unit 12 from warehousing/industrial to manufacturing of precision engineering products for the medical device industry, (2) retain change of use of part of unit 12 from warehousing/industrial to office use ancillary to the business, (3) retain loading bay extension to the west side of unit and (4) retain internal changes to part of unit previously granted under planning reg. ref. no. 23/60933Decision record indexed
Unit 12 Oranmore Business Park, Carrowmoneash Oranmore, Co. Galway
Of change of use of unit 12 from warehousing/industrial to manufacturing of precision engineering products for the medical device industry. Gross floor area of retained works: 365 sqmDecision record indexed