Construct a cattle house with two no. slatted slurry tanks, construct a machinery storage shed and carry out all associated site worksDecision record indexed
Unit E, Townlands of Moneenalion Commons Upper, Brownsbarn and Collegeland, Baldonnell Business Park, Dublin 22
Amendment to previously permitted Ref. SD20A/0215 consisting of signage for Unit E including the provision of, 2 way finding signs located at entrances to Unit E; 2 totem signs located to the west and north of Unit E; 3 halo illuminated signs to the south-western, north-eastern and south-eastern elevations; all associated works.Decision record indexed
Retention and Permission: Full permission is sought for 2 new detached dwelling houses and detached garage to dwelling no. 2. Retention permission and material change of use is sought for existing workshop to be used as a domestic garage for dwelling no. 1. Full permission to include alterations to existing site entrance and all associated site development works. *Significant Further Information received on 13/12/2021 which includes temporary retention of 2no. shipping containers for duration of construction*Decision record indexed
Forest Park Manor, Drum or Warren Townland, Carrick Road Boyle
Retention Permission to retain as constructed dwelling house nos. 5, 6, 7, 9, 14, 16, 17, 18, 19, 21, 22. 23, 24, 25, 26 & 27 and retain as constructed common areas, road and footpath layout with associated services etc., which is at variance to the development permitted under Planning Register Ref No. PD/03/1470 and An Bord Pleanala Reference No. PL 20.207502 with completion of all outstanding site works atDecision record indexed
The erection of one single storey extension to the side elevation of an existing one and a half storey detached dwelling. The development will not involve the discharge of any additional wastewaterDecision record indexed
Commons and Greenbatter, North Drogheda Environs, Drogheda Co Louth
Permission for modification to part of a permitted residential development Ref. no. 08/274, extended in duration under Ref. no. 18/872. Permission sought to construct 85 no. 2 storey residential dwellings comprised of 29 no. 3 bed end/semi-detached houses, 8 no. 3 bed mid-terraced houses, 9 no. 3 bed gable entry houses, 3 no. 4 bed detached houses and 36 no. 4 bed semi-detached houses on a site measuring approximately 3.30 hectares. The proposed development will be accessed from Ballymakenny Road to the south of the site via 2 no. proposed access points. The proposed development also provides for public open spaces, (4,742m2), car and bicycle parking, bin stores, internal roads, and all associated site development works. The effects of the proposed development will be a modification to the extant permissions under ref.s 08/274 and 18/872 (and the provision of an additional 6 residential units).Decision record indexed
(A) CONSTRUCT A NEW DWELLING HOUSE (B) CONSTRUCT A GARAGE/STORE (C) CONSTRUCT A NEW WASTEWATER TREATMENT SYSTEM WITH ALL ASSOCIATED STIE SERVICESDecision record indexed
Permission for the alteration and extension to an existing dwelling house, new waste water treatment system and all associated site development worksGrounds not yet categorised
CONSTRUCT A WINTERING UNIT FOR CATTLE WITH ASSOCIATED UNDERGROUND SLURRY TANKS, CONCRETE WALLS, CONCRETE FARM YARD AND MACHINERY AND FODDER STORAGE SHEDS AND ALL ASSOCIATED SITE WORKS; AN NIS (NATURA IMPACT STATEMENT) HAS NOW BEEN SUBMITTED WITH THIS APPLICATIONDecision record indexed
CONSTRUCT A NEW DWELLING HOUSE AND GARAGE, COMPLETE WITH NEW ENTRANCE ROAD, ENTRANCE, DRIVEWAY, PARKING, WASTEWATER TREATMENT SYSTEM AND PERCOLATION AREA AND ALL ASSOCIATED SERVICES AND SITE WORKSDecision record indexed
CONSTRUCT A NEW DWELLING HOUSE AND GARAGE COMPLETE WITH NEW ENTRANCE ROAD, ENTRANCE, DRIVEWAY, PARKING WASTEWATER TREATMENT SYSTEM AND PERCOLATION AREA AND ALL ASSOCIATED SERVICES AND SITE WORKSDecision record indexed
A serviced campsite for short term letting comprising, a) toilet and shower facilities b)common area and maintenance shed c)4Nr tent spaces, 4Nr Campervan spaces and 4Nr mobile accommodation wagons set in a static position d)a waste water treatment plan serves the development and is outlined in the accompanying documentation e) a separate teaching and cooking/demonstration area to be utilised by extending the existing farm swelling house f) car/motorbike/bicycle parking with internal access tracks/pathways with associated low level lighting and all ancillary site works. All set within syntropic agroforestry farmland currently being used for allotment food production and grazing landGrounds not yet categorised
To indefinitely retain an existing porch to the front elevation and an existing kitchen extension to the side elevation of an existing dwelling and to indefinitely retain an existing detached shed on landsDecision record indexed
New Century House, Mayor Street Lower, IFSC, Dublin 1, D01 K8N7
Planning permission for development on a site of 0.34 ha at New Century House, Mayor Street Lower, IFSC, Dublin 1, D01 K8N7. The site is bound by Mayor Street Lower to the north, Citi Bank building fronting North Wall Quay to the south, and Clarion Quay apartment development to the east and Commons Street to the west. The proposed development comprises of the following: - Provision of 2 no. metal sign boards to the bank branch facade of the northern and eastern elevations; - Increase in width (c.475mm) and illumination of permitted totem sign; - Provision of double doors to replace single entrance door of the bank branch; - Installation of ATM on the northern elevation of the bank branch; - Provision of canopy sign with illuminated uplighting to the permitted office building.Decision record indexed
Permission is sought by Pames Developments Limited for modifications to a previously approved development, register reference 2290/19 for 29 apartments at 6, 6a & 7 Pim Street, Dublin 8.The proposed modifications comprise the following: 1. Reconfiguration of the main internal stairs, lift core and common access corridors together with the removal of the second stairs from the rear courtyard to the first floor and consequent reconfiguration of the apartment layouts. These modifications are necessary to achieve compliance with Part B Fire and Part M Access of the Second Schedule of the Building Regulations. Whilst there is no increase in the overall number of units, the modified scheme will provide a revised mix of 9 studio apartments (previously 10 studio apartments), 14 one- bedroom apartments (previously 13 one-bedroom apartments), and 6 two- bedroom apartments (no change). 2. Resultant alterations to the elevations arising from the modifications noted in item 1 above to include extending the building footprint to the site boundary at the back of the Pim Street public footpath over the full width of the site. 3. Provision of a railed enclosure of minimum 1.0m height to enclose the private amenity space provided for the two ground floor apartments on to Pim Street and provision of a 1.8m high privacy screen to the penthouse roof garden to apartment number 27. 4. Redesign of the cycle parking compound and bin store in the rear courtyard. 5. Permission to omit the requirement at Condition 7(c) of planning permission 2290/19 to provide shower and changing facilities in the cycle storage area.Decision record indexed
The construction of 6 no. 2 storey semi-detached, 4 bed dwellings (individual dwelling area c. 133.2 m2) and all associated works on fully serviced sites constructed under Planning Permission Reg Ref 00/4210, with vehicular and pedestrian access from existing internal estate road, all on subject site of circa 0.155 HaDecision record indexed
Outline permission for proposed dwelling, opening of a new vehicular entrance to site and waste water treatment system and drip filtration system together with all associated site development worksGrounds not yet categorised
Outline permission for a new dwelling, opening of a new vehicular entrance to site and waste water treatment system and drip filtration system together with all associated site development worksGrounds not yet categorised
Cloon and Commons, Station Road, Castleconnell Co. Limerick
Demolition of an existing derelict house and construction of 3no. 2 storey detached houses and site entrances, connections to public services and all ancillary site worksDecision record indexed
For part single part two storey extension to rear (west) & side (north) of existing detached single storey dwelling to include for all associated elevational & site development worksGrounds not yet categorised
To retain indefinitely a partially complete single storey structure and permission to complete and extend this structure to form a granny flat to a dwelling currently under construction which was previously granted under Pl. Ref: 20/214Decision record indexed
AMEND SITE DEVELOPMENT WORKS GRANTED PLANNING UNDER 18/1220 CONSISTING OF ALTERATIONS TO SERVICE ROAD, PARKING AND GREEN AREA FRONTING HOUSING UNITS 13 TO 30 COMPLETE WITH ALL ANCILLARY SITE WORKS ASSOCIATED WITH THE DEVELOPMENTDecision record indexed
Permission for modifications to previously approved 6-storey apartment development which includes a ground floor commercial unit (Planning. Reg. Ref. 2155/20) at this site: no.25-27 Bow Lane West, Dublin 8, D08 NW89. The modifications will consist of the following: i. General alterations to the floor plans to increase the no. of apartments from 24 no. units (9 no. studio units, 9 no. 1-bed units, and 6 no. 2-bed units) to 27 no. units consisting of 4 no. studio units, 16 no. 1-bed units, 4 no. 2-bed 4-people units and 3no. 2-bed 3-people units. This also includes amendments to the approved common areas (corridors, stairs, lifts), communal open spaces, ancillary areas, landscaping etc. as necessary to suit the proposed alterations. ii. Change of use of commercial unit on ground floor to a 2-bedroom dual aspect apartment. iii. Provision of a communal space on the ground floor. iv. Provision of an external escape stair and exit at the rear of the building. v. Provision of an external secure bicycle storage enclosure. vi. Alterations to the elevations to reflect layout changes, and to omit brick on the internal courtyard and replace with self-coloured render as elsewhere.Decision record indexed
For the demolition of the existing single storey cottage and the construction of a single storey replacement dwelling and a single storey detached garage together with all associated site development and site service works for this development adjacent to Riverside Park, Roseberry Commons, Newbridge, Co. Kildare. Access to the proposed dwelling will be via the existing cul de sac road off the Barrettstown Road leading through both the existing College Grove and Riverside Park Housing Estates and though the existing gateway on the applicant site boundary at the end of Riverside Park, Roseberry Commons, Newbridge. Planning Permission was previously granted for the same development under Kildare County Council planning reference 10/801 and the same permission was granted an extension of duration of planning permission under planning reference 15/898. Development is adjacent toDecision record indexed
For changes to approved plans under Planning Permission 19/943. Changes include; 1) Alteration to ground and first floor plan layout of houses 1-5 inclusive. 2) Alterations to gable elevations of houses 1-5 inclusive. 2) Alteration to boundary treatments on the north and east boundaries atDecision record indexed
A single storey house, detached domestic garage, proprietary effluent treatment system, soil polishing filter area, new entrance onto public road & all ancillary site worksDecision record indexed
The development consisting of the proposed construction of a 1.5 storey dwelling house, boundary fence, entrance gates, proprietary wastewater treatment system, percolation area and all ancillary site worksDecision record indexed
Planning permission for the development will consist of the demolition of the existing warehouse struture and construction of a new building consisting of 21 no. apartments comprising of 15 no. 1 bed apartments. 6 no. 2 bed apartments across ground to third floors all associated private open spaces areas in the form of balconies and winter gardens with access to the development from Graham's Row. All with associated landscaped courtyard at ground floor level, sedum roof (main roof), bicycle storage, commons / mechanical plant room, bin storage signage, associated drainage and site development works.Decision record indexed
Construction of detached 2 storey dwelling, detached domestic garage, new entrance, onsite wastewater treatment system, connection to necessary services together with all associated incidental ancillary worksDecision record indexed
TO CONSTRUCT A NEW DWELLING HOUSE WITH DETACHED GARAGE, CONNECTION TO A MECHANICAL TREATMENT UNIT AND GRAVITY POLISHING FILTER AND ALL ASSOCIATED SITE WORKSDecision record indexed
Shalom Commons Lane, Fairyhouse Road, Common Ratoath Co Meath A85 XC89
Retention of an extension to existing bungalow comprising (i) second storey with raised roof ridge with rear dormer type windows and skylights (ii) single storey rear extension and (iii) front porch element. Also the retention of a new waste water treatment system with percolation area and the widening of existing vehicular entranceDecision record indexed
Townlands of Moneenalion Commons Upper, Brownsbarn and Collegeland, Baldonnell Business Park, Dublin 22
Construction 2 logistics/warehouse units (Unit F and Unit G amounting to 15,168sq.m GIA in total) south west of Mountpark Baldonnell Phase 1 and west of the older original Business Park; Unit F will comprise a GIA 6,463sq.m (including 568sq.m of ancillary office space), 65 car parking spaces and 20 bicycle spaces; Unit G will comprise a GIA 8,705sq.m (including 608sq.m of ancillary office space) 87 car parking spaces and 28 bicycle spaces; flood mitigation measures as permitted under SD20A/0215 and SD20A/0319 will service the development and are under construction; access to the site will be from the existing Phase 1 development (referenced below) located on Clonlara Road; totem wayfinding signage; all ancillary landscaping, PV panels; internal roads, associated infrastructure and buildings and site development works to support the development at the townlands of Moneenalion Commons Upper, Brownsbarn and Collegeland, Baldonnell Business Park, Dublin 22; the site is primarily greenfield and located between Casement Aerodrome and the N7 national route; the proposal will form part of the second phase of development to that permitted under SD20A/0215, SD19A/0370 and Phase 1 under SD15A/0309 (ABP Ref. PL06S.246392), as amended by permissions SD17A/0362, SD18A/0266 SD19A/0048 and SD20A/0319; an Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority with the planning application.Decision record indexed
16 no. serviced sites for 16 no. two storey detached dwelling units and planning permission for the construction of the site layout and all ancillary infrastructural works including entrance, roads, footpaths, landscaping, connection to public services, and all ancillary site worksGrounds not yet categorised
Proposed development consisting of one dwellinghouse, domestic garage, wastewater treatment system and all associated site development works. *Significant Further Information received on 28/09/2021*Decision record indexed
Proposed development consisting of one dwellinghouse, domestic garage, waste water treatment system and all associated site development worksDecision record indexed