Of the existing unauthorised extensions to the side and front of the existing dwelling house with all necessary ancillary services
(a) to RETAIN existing dwelling house which was built in mirror image to that granted under planning permission no P8-1785; and (b) PLANNING PERMISSION to construct extension to the side and rear of the existing dwelling house along with associated site works
To construct a new dwelling house and garage complete with a new entrance, sewage treatment system and ancillary works
For development which will consist of a 10 year planning permission for the construction and operation of battery arrays (240 number units, each 1.87m2 by c. 2.32m tall), a control building with gross floor area 140m2 by 6.40m tall, 3 number 12MVA transformers (c. 3.5m tall), 1 number 2.5MVA transformer (c. 2.5m tall) and inverters (24 number units, each 1.85m2 by c. 2.22m tall. The development will include for ancillary infrastructure including security fencing, lighting, CCTV, internal access roads and drainage. The development will have a 35 year operational lifetime. The overall development site is ca. 1.42 hectares (ha)
To extend existing dwelling house and to install foul sewer system & percolation area
To construct a new semi-detached dwelling house to the side of the existing dwelling house, to include revision of the existing site boundaries along with all associated site works and services
Of the change of use of a ground floor commercial unit into ground floor apartment including all associated layout and elevational changes
For the change of use of a ground floor commercial unit and first floor apartment building into three apartments including all associated layout and elevational changes
To remove the existing front boundary wall and entrance, reconstruct a new roadside boundary wall and entrance, reduce levels and incorporate retaining wall structure, provide additional parking, public lighting and drainage, along with all associated ancillary works
For the following development to two no dwelling houses. 1) to RETAIN the attic conversions to residential accommodation to both residential units. 2 to RETAIN the changes to current site boundaries and to RETAIN the increased ground levels which differ from those previously authorised under Planning Permission P07-31028
To construct a new dwelling house, garage, entrance/exit, boundary walls, connection to public water & sewage system and all other ancillary site works
To construct dwellinghouse, garage with loft, advanced treatment system and ancillary site works including development of existing entrance to the site
Of bungalow as built, Montessori as built and shed
To RETAIN the construction of a small garden shed and planning PERMISSION to carry out alterations to existing dwelling house, including raising the height of their dwelling along with all associated works
For the demolition of a pyrite-damaged two-storey extension to the rear of the existing dwelling and the construction of a wider two-storey extension, the removal of part of the front porch, the installation of a wheelchair-accessible ramp, internal alterations, and all associated siteworks
To construct a first floor extension to an existing house along with all associated works
To carry out alterations to existing dwelling house, the works will consist of the construction of zinc clad box dormers, to the front and rear elevations of the property, to increase the first floor living space
To change use of property from holiday home to permanent residence
For alterations to the front façade of 2 no. residential properties, which comprise of: a) the proposal to reposition entrance doorway, b) enlargement of the ground floor window, c) the addition of raised plaster mouldings to the first floor window surrounds at 2 Cappa Village, d) the installation of a new shopfront spanning both properties, encompassing existing entrance doorway at 1 Cappa Village, entrance doorway and window at 2 Cappa Village, and including all ancillary site works
Of minor modifications to the design of the dwelling houses granted under P19-432, retention permission for alterations to finished floor levels, boundaries between houses and planning permission to alter the main entrance granted under planning permission P19-432 along with all associated works
Of the following works: a) retention of the light engineering workshop in the old seaweed factory building. b) retention of the new side cladding and access doors to old sea-weed factory building. c) retention of the existing palisade fencing and entrance gates. d) retention of the existing storage area. e) retention of the existing carparking. Please note that these works will be carried out within the curtilage of an existing protected structure
Ref No. P16-209 for development which will consist of the construction of 8 No. 2 Storey 3 Bed Semi-detached, 6 No. single storey 2 Bed Units, connection to existing public sewers and services, including all ancillary site works, construct new entrance with development to be accessed from Pella Road Public Road at Leadmore West, Kilrush, Co. Clare
For development which will consist of a dwelling house with proprietary wastewater treatment system and polishing filter together with ancillary site works
For development at this site: 2 Cappa Cove, Kilrush, Co Clare, V15 P380. The development will consist of the following: Removal of single-storey lean-to to rear of dwelling, provision of extension to rear of dwelling to accommodate stairwell and WC, new window to RHS (southern) elevation of dwelling, enlarged window to front of dwelling, new window to RHS of front door, along with associated site works
To demolish an existing pyrite-damaged house and planning permission to construct a new redesigned dwelling and garage along with all associated works
For the RETENTION of change of use of the existing linked private garage to residential bedroom with en-suite with all necessary ancillary services.
To build a new house, install a waste water treatment system, create a new entrance onto the public road and all associated and ancillary site works
To change the use of the property from holiday home to permanent residence
To change the use of the property from holiday home to permanent residence
To change of use of property from holiday home to permanent residence
To erect dwelling house, foul sewer treatment plant, percolation area and new site entrance
For the construction of an extension to an existing dwelling, relocation of the sewerage treatment unit, revision of site boundaries and the construction of a garage and planning PERMISSION to install the percolation area granted under P00/1309 and construction of the northern and part of the eastern site boundaries in sod and stone along with all associated works
To demolish existing barn, construct new dweling, including all ancillary site works, connection to existing public sewer and services, utilising existing site entrance with modifications
To construct a new dwelling house, provide a new access on to an existing access road and connect to the public sewer and storm water services along with all associated works
To construct a new dwelling house, provide a new access on to an existing access road and connect to the public sewer and storm water services along with all associated works
Proposes to carry out the following development: 1. Public realm enhancement works to include upgrades to and creation of new continuous footpaths, provision of a pedestrian friendly raised table with new courtesy crossings, road realignment, formalising of on street car parking and provision of age friendly parking, relocation of existing and provision of new street lighting and street furniture. 2. Creation of new pedestrian footpath to the playground and beach and a new civic space adjacent to the existing playground, including alterations to the existing stone wall to facilitate the new access and viewing points. 3. All associated services, site development and landscaping works. In accordance with the Habitats Directive, Appropriate Assessment Screening has been carried out on the project. An Environmental Impact Assessment (EIA) screening determination has been made and concludes that there is no real likelihood of significant effects on the environment arising from the proposed development. The subject works are partially located within the Cappa Architectural Conservation Area and would materially effect the character of the area concerned.
To change of use of property from holiday home to permanent residence
For development which will consist of (1) the demolition of existing extensions to front, LHS, RHS and rear of original cottage, (2) the retrofit of original cottage, (3) the provision of a new extension to LHS of original cottage, (4) the provision of a garage, carport and externally covered areas to front and rear, (5) driveway entrance at position of existing agricultural entrance, and (6) all related site works
To build a new Dwelling House, Garage, install a wastewater treatment system & all other associated site and ancillary works
To construct 10 no. housing units consisting of 6 no. 3 bedroom semi-detached units and 4 no. 2 bedroom semi-detached units together with all associated ancillary site works and services
For the development of a windfarm in the townlands of Cahermurphy, Knocknahila More South, Carrownagry South, Caheraghacullin and Drummin, together with the development of an underground grid connection cable to the National Grid in the townlands of Cahermurphy, Drummin, Doolough, Glenmore, and Booltiagh. The development will consist of 1. Construction of up to 10 no. wind turbines with a maximum overall blade tip height of up to 170 metres and associated hard strand areas. 2. 1 no. permanent meteorological mast with a maximum height of up to 100 metres. 3. 1 no. 38kV permanent electrical substation which will be constructed at one of two possible locations on site: either Option A in Carrownagry South townland or Option B in Cahermurphy townland. The electrical substation will have 1 no. control building with welfare facilities, all associated electrical plant and equipment, security fencing, all associated underground cabling, waste water holding tank and all ancillary works. 4. All associated under-ground electrical and communications cabling connecting the turbines to the proposed on-site substation. 5. All works associated with the connection of the proposed wind farm to the national electricity grid via an underground cable to the existing Booltiagh 110kV substation. 6. Upgrade of existing tracks, roads and provision of new site access roads and hardstand areas. 7. Junction access road works. 8. 2 no. borrow pits. 9. 1 no. temporary construction compound. 10. Site Drainage. 11. Forestry Felling to facilitate construction and operation of the proposed development; and 12. All associated and ancillary site development works. The application is seeking a ten year planning permission and 30 year operational life from the date of commissioning of the wind farm. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of the proposed developemnt
To construct an agricultural entrance to lands with all necessary ancillary works
Of a) the site entrance as constructed b) the increase in the roof height of the dwelling house c) the sunroom as constructed d) the first floor area and additional rooflights along with associated site works
For the construction of a new dwelling house with a carport, complete with a new entrance, sewage treatment system and ancillary works
To construct 18 no. social housing units together with all associated ancillary site works and services
To construct dwelling house, garage, DWWT System, percolation area, entrance and all associated site works
Is sought for the continued operation of the existing Booltiagh Wind Farm as permitted by An Bord Pleanala Ref: 03.120616 (Clare County Council Pl. Ref: 00/567) for a further period of 10 years from the date of the expiry of the current planning permission (30th September 2025) per Condition no. 2 of the consent issued and for the decommissioning of the wind farm at the end of that further period. The proposed development development does not comprise any modifications to the existing operational wind farm. The proposed development comprises: a) 12 no. existing GE Energy 1.5 Megawatt (MW) wind turbines with a maximum overall blade tip height of 90 metres (m) including hardstands; b) Existing site access tracks and car parking spaces; c) all existing associated underground electrical and communications cabling connecting the turbines to onsite substation (onsite substation consented under ABP 03.120616, amended and made permanent under Pl. Ref: 11/34, and amended under ABP 03.245273; d) Existing gated site entrance from Creegh - Kilmaley local road; e) Existing site drainage; f) All existing ancillary infrastructure, associated site fencing and signage; and g) Implementation of a decommissioning plan. All elements of the wind farm are pre-existing and it is not proposed to make any alterations to the current site layout, wind turbines or associated infrastructure as part of this application. an Environmental Impact Assessment Report (EIAR) accompanies the planning application
For development of a livestock slatted unit with associated ancillary siteworks
For development which will consist of a dwelling house and garage with proprietary wastewater treatment system and polishing filter together with ancillary site works
To construct a dwelling house and garage with effluent treatment system, assessed by means of an existing shared entrance and driveway from the public road, all with associated site works