To demolish existing two no. cubicle houses and roofed silo, to construct a cattle house with two no. slatted slurry tanks and carry out all associated site worksDecision record indexed
Demolish an existing dwellinghouse and to construct a new dwelling house, connect proposed new dwelling house to an existing septic tank and percolation area and all associated worksDecision record indexed
Demolition of existing agricultural building and for the construction of dwelling house in-lieu of same, for the installation of waste water treatment system and for all associated site worksDecision record indexed
Construction of dwelling house, installation of waste water treatment system, construction of vehicular entrance and access road for said dwelling and for all associated site worksDecision record indexed
No. 1. Cubicle House consisting of 2 underground tanks, No. 2. A Farm Machinery Shed, No. 3. A New store entrance wall and all associated site worksDecision record indexed
Construction of 4 no. dwellings on individual sites with individual domestic garage, treatment unit, percolation area, private well, individual site entrance and associated site development worksDecision record indexed
Permission for alterations and extension to existing dwelling house, upgrade of waste water treatment system and all associated site development worksDecision record indexed
Planning Permission for the demolition of existing farm buildings and associated yards/walls and permission is also sought for the construction of a dwellinghouse and all associated site worksDecision record indexed
Permission is sought for A) Demolition of existing extensions to the rear of existing dwelling B) Construction of a new extension to rear of existing dwelling C) Raise existing roof profile of existing dwelling with external alterations D) Replace existing septic tank with a treatment unit and Percolation AreaDecision record indexed
Construction of new entrance to dwelling house along with closure of existing entrance and all associated site development worksDecision record indexed
(i) retention of extensions to dwelling house, (ii) retention of detached domestic garage/store and associated site works, and (iii) permission for replacement of existing wastewater systemDecision record indexed
Permission for retention and permission for completion of partially constructed dwelling and all associated site works (Previously permitted under Pl Reg No 10/247). Temporary Permission for retention is also sought for an existing dwelling on site until the completion of the main dwelling house and for permission for use of same as ancillary accommodation thereafter (Previously permitted under Pl Reg. No. 13/62)Decision record indexed
Permission to demolish existing agricultural storage shed, permission to construct a cattle house with slatted slurry tank, construct a concrete cow path/cattle race, construct an earth walled bund to existing over-ground slurry storage tank and carry out associated site worksDecision record indexed
Permission for the construction of a dwelling house serviced by a septic tank and percolation area and all associated site works. Also temporary retention of current dwelling (a yurt) for a period of two years.Grounds not yet categorised
Permission to replace existing dormer windows to south elevation with new box dormer, add new rooflight to west elevation and minor alterations to existing fenestrationDecision record indexed
The development on a site area of c.2.7 hectares within the existing area authorised for extraction and concrete manufacturing under permission ref. no's W/323/91 and W/01/5878 will comprise: i) Retention and continuance of importation of aggregates for the manufacture of concrete products; ii)Retention and removal of the existing concrete truck washout facility and water recycling tanks in the north-eastern area of the site; iii) Retention and continuance of operational landscaping and ancillary site works; iv) Variation of condition 12 of permission ref. no. W/323/91 to allow for the use of imported aggregates in the existing concrete plant; v)Provision of a new concrete truck washout facility and water recycling tanks at a lower level on the site; vi) Provision of noise reduction fencing (up to 5 metres in height) along the south-western boundary; vii) Provision of additional screening berm (up to 4 metres in height) on the eastern side of the access road; vii) Provision for out of hours operation of the concrete plant on a maximum of 20 occasions each year; ix) Phased restoration and final restoration of the site; For a period of 11 years (including 1 year for final restoration).Grounds not yet categorised
Renovate and extend existing dwelling house, installation of septic tank and percolation area and carry out associated site worksDecision record indexed