(1) CONVERSION OF ATTIC SPACE TO HABITABLE ACCOMMODATION AND MODIFICATIONS TO ELEVATIONS, AND (2) PERMISSION FOR (A) DEMOLITION OF EXISTING DWELLING DUE TO DEFECTIVE BLOCKS PLANNING REF. NO. 03/4082, (B) ERECTION OF A REPLACEMENT DWELLING AND INSTALLATION OF A WASTE WATER TREATMENT SYSTEM & PERCOLATION AREA, CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED WORKSDecision record indexed
DWELLING HOUSE AND PERMISSION FOR DEMOLITION OF THE EXISTING, DORMER BUNGALOW DWELLING HOUSE DAMAGED DUE TO DEFECTIVE (MICA) PRECAST CONCRETE BLOCKS AND CONSTRUCTION OF (1) A REPLACEMENT DETACHED, TWO STOREY DWELLING HOUSE WITH ALTERATIONS FROM THAT OF THE EXISTING DWELLING HOUSE AND (2) A DETACHED GARAGE WITH THE RELEVANT ASSOCIATED REPLACEMENT WORKS TO BE CONNECTED TO THE EXISTING SITE SERVICESDecision record indexed
AGRICULTURAL SHED CONSISTING OF DRY BEDDED HORSE STABLES, A SEPARATE AGRICULTURAL STORAGE SHED ASSOCIATED WITH THE MAIN SHED, AND ALL ASSOCIATED SITE DEVELOPMENT WORKS AND PERMISSION FOR OUTDOOR SAND ARENA LINKED TO THE EXISTING DEVELOPMENTDecision record indexed
REMOVAL OF AN EXISTING ROADSIDE HEDGEROW, PROVISION OF A NEW ROADSIDE BOUNDARY FENCE WITH A NEW ENLARGED AGRICULTURAL ENTRANCE GATE AND THE PROVISION OF A VEHICULAR HARDSTAND AREADecision record indexed
REMOVAL OF AN EXISTING ROADSIDE HEDGEROW, PROVISION OF A NEW ROADSIDE BOUNDARY FENCE WITH A NEW ENLARGED AGRICULTURAL ENTRANCE GATE AND THE PROVISION OF A VEHICULAR HARDSTAND AREAGrounds not yet categorised
EXISTING DORMER WINDOWS AT FRONT AND REAR, WINDOW TYPES AND DOMESTIC SHED AND PERMISSION FOR DEMOLITION OF EXISTING MICA AFFECTED HOUSE AND CONSTRUCTION OF NEW DWELLING HOUSE, CONNECTION TO EXISTING SEPTIC TANK ON SITE AND ALL ASSOCIATED SITE WORKSDecision record indexed
(1) 2 NO. DETACHED DOMESTIC USE SINGLE STOREY SHEDS ("SHED A" - 32.96M2 & "SHED B" - 35.58M2) BOTH LOCATED TO THE REAR (SOUTHWEST) OF AN EXISTING DWELLING AND PERMISSION FOR CHANGE OF USE OF 1 NO. EXISTING SHED “SHED A” (32.96M2) FROM DOMESTIC USE INTO A MEN'S BARBER'S PREMISES ALONG WITH CONNECTION TO EXISTING SERVICESDecision record indexed
CONSTRUCTION OF A NEW DWELLING HOUSE AND DOMESTIC GARAGE WITH EFFLUENT TREATMENT SYSTEM AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
(A) DEMOLITION OF EXISTING DWELLING AND SHED (PLANNING REF. NO. 05/4052 REFERS), (B) ERECTION OF A REPLACEMENT DWELLING WITH CHANGE OF HOUSE TYPE, (C) ERECTION OF A REPLACEMENT SHED, (D) CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED WORKSDecision record indexed
CONSTRUCTION OF A NEW DETACHED SINGLE STOREY DOUBLE GARAGE (70.6M2) TO NORTHWEST OF EXISTING HOUSE, ALONG WITH CONNECTION TO EXISTING SERVICES & ASSOCIATED WORKSDecision record indexed
ALTERATION OF SITE LEVELS ON AN EXISTING AGRICULTUTAL FIELD TO REMOVE MOUNDING AND INDULATING LEVELS AND CREATE TOPOGRAPHY SIMILAR TO ADJACENT FIELDS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATIONGrounds not yet categorised
MOBILE UNIT FOR AGRICULTURAL USE AS TACK ROOM, CHANGING ROOM, WET ROOM, OFFICE AND REST AREA, TOGETHER WITH ACCESS LANEWAY AND PERMISSION FOR (1) CONSTRUCTION OF AN AGRICULTURAL BUILDING COMPRISING A BARN AND STABLES (2) COMPLETION OF ALL ASSOCIATED SITE WORKS INCLUDING SCREENING MEASURESGrounds not yet categorised
CONSTRUCTION OF A ONE AND A HALF STOREY DWELLING WITH DETACHED DOUBLE GARAGE; WASTEWATER TREATMENT PLANT AND PERCOLATION AREA; ALONG WITH ASSOCIATED SITE WORKS AND CONNECTION TO EXISTING SERVICESDecision record indexed
RENOVATION AND EXTENSION OF EXISTING COTTAGE TO INCLUDE: (1) DEMOLITION OF PORCH TO FRONT (SOUTHERN) ELEVATION AND EXTENSION ON (WESTERN) GABLE ELEVATION AND CONSTRUCTION OF REPLACEMENT SINGLE STOREY EXTENSION ON THE GABLE ELEVATION, (2) CONSTRUCTION OF AN EXTENSION TO THE EASTERN SIDE AND (3) INSTALLATION OF A SEPTIC TANK / SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
(1) ERECTION OF A SUN ROOM TO THE NORTH ELEVATION (2) AMENDMENT OF FIRST FLOOR WINDOW ON NORTH ELEVATION TO ACCOMMODATE SUN ROOM, TO APPROVED PLANS AND ELEVATIONS GRANTED UNDER PLANNING REFERENCE 21/50693Decision record indexed
(1) DEMOLITION OF EXISTING DWELLING HOUSE GRANTED UNDER PLANNING REF: 99/1999 (2) CONSTRUCTION OF A REPLACEMENT DWELLING HOUSE WITH CONNECTION TO EXISTING SEPTIC TANK GRANTED UNDER PLANNING REF: 99/1999Decision record indexed
(1) DEMOLITION OF EXISTING DWELLING (PLANNING REG. REF. NO. 03/5666 REFERS) DUE TO DEFECTIVE MICA BLOCKWORK, (2) CONSTRUCTION OF A REPLACEMENT DWELLING WITH CONNECTION TO ALL EXISTING ON-SITE SERVICES AND (3) ALL RELATED SITE DEVELOPMENT AND ANCILLARY WORKSDecision record indexed
(1) DEMOLITION OF EXISTING OUTBUILDING (2) RENOVATION OF EXISTING UNINHABITABLE COTTAGE AND CONSTRUCTION OF A ONE AND A HALF STOREY EXTENSION TO THE EASTERN SIDE (3) INSTALLATION OF A SEPTIC TANK / SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
RETENTION AND COMPLETION OF TIMBER AND STEEL FRAMED SHELTERS, PORTABLE TOILETS, STONE BENCHES, PICNIC TABLE AND LAYBY CAR PARKING IN SUPPORT OF "WILD ALPACA WAY" TOURISM BUSINESSDecision record indexed
FIRST FLOOR AND ALTERATIONS TO ELEVATIONS AND PERMISSION FOR (1) DEMOLITION OF EXISTING DWELLING DUE TO DEFECTIVE MICA BLOCKWORK AND (2) ERECTION OF A REPLACEMENT DWELLING AND CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
ERECTION OF AN EXTENSION TO EXISTING AGRICULTURAL SHED TO INCLUDE FOR ADDITIONAL SLURRY STORAGE UNDER, AND ALL ASSOCIATED SITE WORKSDecision record indexed
(1) DEMOLITION OF THE EXISTING DWELLING HOUSE DUE TO DEFECTIVE CONCRETE BLOCKWORK GRANTED UNDER PLANNING PERMISSION REF: 02/4273 AND (2) ERECTION OF A REPLACEMENT DWELLING TO BE CONNECTED TO THE EXISTING PREVIOUSLY APPROVED EFFLUENT TREATMENT SYSTEM, TOGETHER WITH ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
(1) REFURBISHMENT OF EXISTING SERVICE BUILDING TO INCLUDE OFFICE, CANTEEN AND TOILET AREA (2) DEMOLITION OF EXISTING PUMP HOUSES (3) FOUR NUMBER BROILER HOUSES (4) UPGRADING OF EXISTING SEPTIC TANK AND PERCOLATION AREA INCLUDING DECOMMISSIONING OF EXISTING SEPTIC TANK AND ALL ASSOCIATED SITE WORKSDecision record indexed
(1) DEMOLITION OF THE EXISTING DWELLING HOUSE DUE TO DEFECTIVE CONCRETE BLOCKWORK GRANTED UNDER PLANNING PERMISSION REF: 04/11010, AND (2) ERECTION OF A REPLACEMENT DWELLING TO BE CONNECTED TO THE EXISTING PREVIOUSLY APPROVED EFFLUENT TREATMENT SYSTEM, TOGETHER WITH ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
CONSTRUCTION OF A NEW VEHICULAR ENTRANCE IN LIEU OF ENTRANCE GRANTED UNDER PLANNING REF: 18/51110 AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed