For a single dwelling house, garage, advanced wastewater treatment system along with ancillary site works
For proposed two storey extension to front of dwelling to accommodate additional kitchen dining space on ground floor and an additional bedroom and bathroom at first floor, single storey extension to side to accommodate car port and elevational changes to window openings, and new sewage treatment system and percolation area
For development, the development will consist of the construction of a shed extension for domestic storage use, to the side of existing shed, and all ancillary site works
To alter and extend dwelling house and associated site works
On the grant of outline permission (Reference No. P22/620) to construct a dwelling house and garage, with effluent treatment system and associated site works, accessed by means of an existing shared entrance and driveway from public road
To construct a dwelling house and garage, with effluent treatment system, and associated site works, accessed by means of existing shared entrance and driveway from public road
To relocate the existing Ardnacrusha Tulla 38 kV Line
To construct a dwelling house and garage, with effluent treatment system, accessed by means of an existing entrance and driveway from public road, all with associated site works
For development which will consist of the construction of a slatted unit and associated site works
For the development which will consist of construction of dwelling house and effluent treatment system along with associated site works
To construct a single dwelling house, advanced wastewater treatment system and ancillary site works
To construct a dwelling house, new site entrance, wastewater treatment system and all associated site works
To amend pre-school opening hours previously permitted under P03-744 is being sought by Loughgraney Kids Corner Ltd
For a change of roof design on proposed extension to that previously approved under planning reference P25/60024 and also planning permission is sought to increase the capacity from the permitted 80 children to 90 children
To construct a single storey extension to increase from 70 children to 80 children at one time with associated works.
To demolish derelict cattle cubicle shelter, construct a slatted cattle shed and associated site works
For a single storey extension and alterations to an existing dwelling with associated site works
To construct a dwelling house and domestic garage, install a waste water treatment system with percolation area and associated site works
Of the development which consists of: a) Alterations to the internal road layout and b) Existing road entrance and c) A change of layout of camping pods and d) A change of camping pod type, all from that previously granted Planning Permission under Planning Reference No. P.16/114. It is proposed to retain the development for an indefinite period.
To demolish a derelict hay shed and barn structure, construct an agricultural shed incorporating slatted cattle area, calf rearing area, hay and straw storage area, attached external dungstead area and associated site works
To demolish and existing derelict dwelling and associated out-buildings and to construct a replacement dwelling house and garage, with effluent treatment system, new entrance from public road and all associated site works
To a) RETAIN modifications to dwelling house, b) RETAIN private garage, c) RETAIN pump house building and d) RETAIN site boundaries/site layout/site entrance as constructed along with all associated site works and services. Original planning reference no P01/638
To construct a dwelling house and garage, with effluent treatment system, new entrance from public road, and associated site works
Of (a) alterations and extensions to original dwelling house, (b) all ancillary structures which consist of pergola, sauna, garage, woodshed and canopy, woodstore, tool shed, replacement storage shed and pumphouse, (c) site boundaries and (d) all ancillary site works
For development at the existing Ballyquin Quarry. The development will consist of: (i) The extraction of sand from an area of approximately 16.3 hectares within an overall site area of 97.5 hectares; (ii) The infill and restoration of existing and future quarry voids (38 hectares) using inert soil and stone waste (imported inert greenfield and non-greenfield soils and stone, and river dredge spoil) which will be a soil recovery facility and require a waste management licence or soil and stone by-product (i.e. essentially virgin soil or equivalent to virgin soil and stone, and river dredge spoil) which will be notified to the Environmental Protection Agency (EPA) as an Article 27 by-product; (iii) The upgrade of existing quarry infrastructure including site office, weigh bridge, wheelwash, and welfare facilities; (iv) Refuelling area and associated drainage works, comprising 1 No. concrete hardstand area, hydrocarbon interceptor, wetland, inspection chamber and soakaway; (v) 1 No. soil inspection shed (c.875q. m) for the inspection of soil material; (vi) Erection of washplant; (vii) Settlement ponds; (viii) Landscape berms and fencing; (ix) All associated ancillary works. Site access is via the existing entrance off the R466. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of the proposed development. Should the inert soil, stone and inert dredge spoil materials be deemed to be a waste, then a Waste Management Licence will be required under Part 5 of the Waste Management Act 1996 (as amended) and an application for a Waste Management Licence will be made to the EPA following a grant of planning permission for the proposed development.
To erect a private dwelling house, install an effluent treatment system and percolation area, access road and all associated site works
For the construction of an extension and modifications to an existing dwelling house and all associated site works
To modify previously granted planning permission reference 2360501. Proposed new works consist of the construction of an extension and modifications including partial demolition works to an existing dwelling house and all associated site works
To construct a garage along with ancillary site works
To erect a private dwelling house, install an effluent treatment system and percolation area, access road and all associated site works. A Natura Impact Statement will be submitted with this application
To erect a dwelling house, install an effluent treatment system and percolation area, access road and all associated site works. A Natura Impact Statement will be submitted with this application
To complete partly erected dwellinghouse in accordance with plans previously approved under Planning Ref: 08/557, connect to existing septic tank and all associated site works
For (a) to demolish an existing garage and rear utility, (b) to construct a two storey side extension and (c) Elevation changes with all associated site works
To (a) Demolish garage (b) Construct side and rear extensions, carry out fenestration changes to dwelling house together with all associated site development works and services
For the development which will consist of the change of use and extension of existing shed for use as Alternative Healthcare Consultancy Room and associated facilities for the owners of the property to work from home
To modify extend and convert two vacant unused agricultural buildings to residential accommodation (for short term lettings), install a septic tank and percolation area to serve these units and all associated site works
For development which will consist of a new single storey dwelling house and a new waste water treatment system and a new vehicular and pedestrian entrance onto the public road and all associated site works
Of the development which consists of a domestic garage together with all ancillary works
To construct a dwelling house and garage, with effluent treatment system, and new entrance from public road. The development includes alterations to the site boundary of the dwelling granted under planning permission P04-1699 on the adjoining site to the East, all with associated site works
Permission consequent on the grant of outline permission (Reference No P23/554) to construct a dwelling house and garage, with effluent treatment system, and new entrance from public road. The development includes alterations to the site boundary of the dwelling granted under planning permission P04-1699 on the adjoining site to the East, all with associated site works
Of the extension, renovation and site works carried out to the existing dwelling and Permission to complete the building works which will include changes to the existing fenestration, install a wastewater treatment system & al other associated site and ancillary works
To revise the site boundary outline for previously granted planning permission application reference 06/495 and retention planning reference 22/598 to their existing dwelling house, and all associated site works
For the construction of a single storey extension to the rear and side of the existing dwelling, together with all associated ancillary and incidental site works
Of a) 1st floor conversion dormer windows, rear extensions, alterations and fenestration changes b) detached garage c) installation of new wastewater treatment system and location of soil polishing filter, d) boundaries as constructed together with all ancillary site development works and services
Of a) enlarged dwelling house from what was granted under P05/1935 b) 1st floor attic conversion c) chimney location, installation of roof windows and fenestration changes d) 2no. domestic sheds along with boundaries as constructed together with all ancillary site development works and services
To construct an Agricultural Shed and associated site works
Of amended site boundaries and updated location of Treatment System and Percolation Area as granted under P19/350
To construct agricultural slatted unit plus all ancillary site works
Is sought to construct a detached domestic garage, including all ancillary site works and services
To erect a dwelling house and garage for private domestic use, install an effluent treatment system and all associated site works