To construct a new dwelling house, site entrance, wastewater treatment system and all associated site works
For to construct a single storey extension to the side of the existing dwelling house, with all associated site works
To Extend the Appropriate Period of Planning Permission P15-517 to construct a proposed extension to connect garage to existing dwelling enveloping existing conservatory plus all ancillary site works
To alter and extend an existing house with a dormer-style extension, to replace an existing on-site wastewater treatment system, alterations to an existing site entrance and associated site works
To RETAIN and complete a sports storage shed
To Extend the Appropriate Period of Planning Permission for P15/766 to construct a dwelling house, detached garage, waste water treatment system and soil polishing filter with associated site works
To construct a dwelling house and garage, with effluent treatment system, new entrance from public road, and all associated site works
To construct an extension and alterations to an existing dwelling house, including minor site works and all associated works
To carry out works within the confines of Tim Smythe Park, Lifford, Ennis. The works involve the following: I. to upgrade and extend the existing changing room building. This will consist of shower areas, changing rooms, toilets, services area and caretaker's office, replace existing roof with new. ii. To provide new extension and link section connecting to upgraded changing rooms. The new extension will consist of changing rooms shower areas, toilets and accessible changing room. iii. To re-locate part of the existing basketball court surface and fencing to accommodate the proposed extension. iv. To connect the upgraded changing rooms and proposed extension unit to existing site services. v. All associated site works pertaining to the upgraded changing area and proposed extension. The site / development is located within the Ennis Architectural Conservation Area and the proposed work would materially affect the character of the area concerned. In accordance with the Habitats Directive, Appropriate Assessment Screening has been carried out on the project. An Environment Impact Assessment (EIA) screening determination has been made and concludes that there is no real likelihood of significant effects on the environment arising from the proposed development
To construct a dwelling house, garage, waste-water treatment system and soil polishing filter together with all ancillary site development works and services
To demolish an existing ruin and build a new dwelling house with garage, install a waste treatment system upgrade the existing entrance to the public road and all associated site and ancillary works
To construct an off street parking area and dropped kerb including all site services and ancillary site works
Is sought for the construction of a dwellinghouse, domestic garage, and for all ancillary services and site works. PERMISSION is also sought for the sub-division of an existing site
For the proposed development of 31 no. Residential Dwellings consisting of (i) 24 no. x 3 bed Two storey Semi-detached units, (ii) 4 no. x 4 bed Two storey with attic conversion Semi-detached units, (iii) 1 no. x 3 bed Two storey Terrace unit (iv) 2 no. x 2 bed Two storey Terraced units, (v) Electrical Kiosk and (vi) all ancillary siteworks including ground works, drainage, utilities, street lighting, landscaping
To RETAIN additional internal floor area and alterations to elevations to existing dwelling
Of a) extension to rear of dwelling house and b) canopy to front of dwelling house, along with all associated site works and services
- a permission of 10 years in duration is sought. The application site has a total of c. 60 hectares with a nett area for development of c. 45 hectares, and is bound to the south by R352 (Tulla Road), to the east and the north by agriculture land, to the west by the M18. The development will consist of: the demolition of an existing single storey with pitched roof farm dwelling house together with 8 No. farm outbuildings on the overall site. The construction of 6 No. two storey data centre buildings with three storey plant/office levels and associated ancillary development that will have a combined gross floor area of 118,740 sqm. These data halls are maximum 19m high and will consist of the data halls and air handling units and offices and ancillary plant and support. Each of the six data centre buildings will include data halls, associated electrical and mechanical plant rooms, loading bays, maintenance and storage spaces, office administration areas, pump rooms, water storage tanks, and plant, as well as backup (standby) generators (11 No. per building) for emergency use only situated along one elevation of each building. The standby diesel generators will have associated 8 m high flues. Each generator will also include local diesel storage tanks with a single refuelling area to serve the proposed emergency generators. A gas powered energy centre and Above Ground Installation (AGI)4,674 sqm in size. The energy centre will primarily comprise 18 no. lean-burn natural gas engines, 2 No. pump rooms, and fuel storage compound. Each generator will have its own flue of 25m height. The energy centre and buildings within the compound will be 12 m high, single storey with mezzanine level. The buildings will house ancillary office, welfare facilities and associated parking. A two storey Vertical Farm Building. The vertical farm will be c. 2,430 sqm and 12m high. It will comprise c. service area of 1,444 sqm, handling area of 844 sqm and ancillary areas. Please see newspaper notice for full development description
To construct a single-storey extension to the rear and side of the dwelling house
For development consisting of construction of a two-storey extension to the rear of the house, new studio/garage to the rear of garden, new parking space accessed from the lane and all associated site works
For development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
Of private residential extensions to premises consisting of living room, kitchen and domestic store
Of a detached garage and a single storey utility extension to the side of the property
For development which will consist of a two-storey rear extension, new shed and studio building, refurbishment of the existing dwelling and associated site works
The construction of a single storey extension and associated site works.
For development which will consist of the construction of a dwelling house, ancillary site works and connection to public services
To construct a new dwelling house and detached garage including all ancillary services and works
To construct a Private Dwelling House, Garage and Site Entrance along with all associated site works
For development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
For development which will consist of (1) The demolition of an existing substandard dwelling house including annexes. (2) The construction of 4 no. two storey dwelling houses, ancillary site works and connection to public services
To construct a single storey extension to the rear of house, carry out external modifications and connect to the public sewer
To construct a 30m high, free standing lattice type communications structure to accommodate antennae and communication dishes to be shared with third part operators ESB's Ennis 110kV substation
For development at Harmony Row, Lifford, Ennis, County Clare. The site is located in an Architectural Conservation Area. The development consists of thermal and energy upgrade works to 1970s building comprising the installation of insulation and external render to the facades and PV cells and heat pumps on the roof
To demolish the existing flat roof extension at the rear of the existing dwelling house, construct a new two storey extension to the rear, construct an enclosed porch to the front, widen the entrance gates/piers and raise the front boundary wall to 1.70m high to match that of the adjoining site boundary including all ancillary site services and works
To construct a two storey dwelling house with all necessary ancillary services
To (a) change partial use of ground floor of existing building to take away (b) erect signage together with all associated site development works and services
For the construction of a first-floor extension to the south elevation of existing dwelling and all associated site works
To construct a single storey extension to the side of the existing dwelling house along with ancillary site works
For 1. Demolition of existing buildings 2. Construction of a two storey/part three-storey extension to existing buildings comprising classroom accommodation & new PE hall 3. Proposed hurling wall & 4. Proposed new vehicular entrance, cycle & car parking, landscaping, boundary treatment, drainage, plant & related works 5. Minor alterations to existing buildings. This application includes a Natura Impact Assessment (NIS)
(i) Retention of log cabin as constructed for use as permanent residence and all ancillary site works including connection to existing septic tank, and, (ii) permission for the change of use of existing substandard dwelling house for use as domestic shed/storage
Of the two storey extension to the rear of the dwelling, the new window to the gable of the original dwelling & all other associated site and ancillary works
To construct extension and carry out alterations to dwelling house with existing connections to public sewer and water.
To develop vehicular entrance from public road and carry out ancillary site works
For development to construct a new parish office adjacent to Fahy Hall, all connections to water supply, public sewer and all ancillary site services and works required to facilitate the proposed development
For development consisting of the provision of 33 no. houses and storage & hobby pavilion, together with ancillary siteworks
For alterations to previously approved Planning ref no. 21/746. The alteration will consist in the increase of dwelling units from 33 units to 39 units including the following alterations to building types; Change of 7 no. detached houses (unit no’s 1, 2, 3, 4,5,6, 7) to 10 no. semi-detached Bungalows and 1no. detached Bungalow; Change of Storage and hobby pavilion to 2 no. semi-detached Bungalows; Alterations to the Landscaping and vehicle parking and all associated site development works
For development which will consist of the construction of a dwelling house, garage, waste water treatment system, percolation area and all associated site works
To change use of existing building from commercial to residential use (b) construct rear extension and carry out renovations and alterations to existing building together with all ancillary site development works and services
To construct a domestic garage, in the form of a single storey side extension of this dwelling house
For development which will consist of; A new dwelling house, new garage, new site entrance and wastewater treatment system, including all ancillary site works above and below ground.
Of a porch to the front of dwelling and RETENTION of the removal of the front boundary wall to allow for off street parking