The development consists of the construction of a series of M&E Buildings to the yard of Building 2. There is a requirement for four buildings, to house a transformer, a substation, a RMU and a sprinkler tank room. We are also seeking PERMISSION for a sprinkler tank. We are proposing three ancillary plant compounds, housing the chiller plant, bin store and Air Conditioning Units. We propose minor changes to the elevations to include louvres and doors to access the proposed plant. There are minor amendments to the landscaping between buildings 2 and 3 to improve access to the site
The development will consist of the construction of a mezzanine floor to the North West side of the building which will house laboratories and plant (366m2) and a separate plant deck (156.5m2). The total additional mezzanine floor area is 522.5m2. The Ground floor will house the main office and pharmaceutical pods. We are also proposing minor changes to the elevations to include the developed and fixed louvre positions associated with the plant
For the addition of an air handling unit platform and containment enclosure together with the extension of an existing stair core to roof level to provide permanent access for maintenance including all associated site works and services
For the construction of a single storey extension to the South West side of Building 2, Block K, Airport Avenue, Shannon Free Zone, Shannon Free Zone, Shannon, Co Clare. The proposed extension of 250m2 will house a goods in and out, office, stores and plant rooms. The development will also consist of external roof access stairs, canopy and associated site works
To a) demolish existing detached garage, b) construct single storey extension to the existing dwelling house and c) make modifications to the internal layout of the existing dwelling house including all ancillary site services
For the construction of a Dwelling House, wastewater treatment system and new entrance including ancillary site works
For the construction of single storey services building, bulk storage vessel, services pipe rack and all associated site development works in the existing services yard
To remove an existing greenhouse superstructure and to construct a new greenhouse, restore and rebuild an existing outbuilding structure and to reroof in part, all located close to protected structure ref RPS no. 640.
To repair and reroof an existing outbuilding located close to protected structure (ref RPS no. 640)
For (a) to refurbish and reroof and for a change of use of an existing outbuilding from storage use to accommodation use ancillary to the existing house, and to construct a new extension and (b) To refurbish and reroof an existing barn to include a roof mounted PV solar array, and to construct a new glass house and ESB switch room/ services building, all located close to a protected structure ref RPS no. 640.
For the modifications to the existing service yard at Building 2, Block K, Airport Avenue, Shannon Free Zone, Shannon, County Clare. The proposed development consists of permission for the RETENTION of the bin store (change of plan as previously granted under planning reference P2145), the construction of a new roof to the existing bin store, construction of single storey services building, the relocation and replacement of 3 no. gas enclosures with 6 no. gas enclosures and all associated site development works
To construct a new dwelling house, private garage, site entrance, private wastewater treatment system and all associated site works and services
To construct a single storey extension to the front and side existing dwelling, including the provision of entrance gates to the existing front boundary wall and associated site works
To erect 658.36 m2 of photovoltaic panels on the roofs of the building, with all associated site works at Reagecon Diagnostics Limited, Bay F21A-23A, Shannon Free Zone, Shannon, Co. Clare V14 X073. A Glint and Glare assessment will be submitted with the planning permission application
For the construction of an extension to existing shed/studio to comprise of home gym including ancillary site works
For development, the development consists of the construction of a milking parlour, slatted cubicle unit and associated site works
Of as constructed double entrance gates on front boundary and all associated site works
For new domestic entrance and all associated site works
For the following items: RETENTION of a later edition extension to the rear of an existing original house, consisting of 1 additional bedroom at ground floor level and additional bedrooms at first floor or attic level when the new roof was being constructed (Circa 15 years ago), including velux roof lights to the side and a minor modification to the site boundary to ensure the septic tank and its associated percolation area fall within the house lands, and all associated site works on and under land
For the construction of 40 no. additional car parking spaces within existing industrial facility and associated site works
To construct dwelling house, shared entrance, waste water treatment system and percolation area, bored welll plus all ancillary site works
To construct dwellinghouse, garage, bored well, waste water treatment system, entrance and all associated site works
For the Installation of a Modular Home to be used as Ancillary Living Accommodation with connection to existing wastewater treatment system including ancillary site works
For alterations to the front and side elevations of existing industrial buildings and associated site works
Of a) garage conversion and roof alterations b) sheds and playhouse together with all ancillary site development works and services
At a site of 0.17ha at Shannon Airport, Shannon, Co Clare. The application for Planning permission consists of the demolition/removal of existing accommodation structure (c. 60 sq m), and construction of a one-storey structure located between the existing Search and Rescue (SAR) Hangars 3 and 4. The structure will be c. 374 sq m, c. 4.2 m in height, and will comprise SAR on-shift accommodation with ancillary facilities including bedrooms, kitchen, operations room, changing rooms, and storerooms. The development also comprises: plant and equipment (including generator and gas tank compounds); modifications to existing car parking provision (increase in quantum of 1 no. car parking space); bicycle parking; lighting; drainage (including provision of permeable paving and attenuation tank); fencing; hard and soft landscaping; and all associated site works above and below ground
For alterations to the existing West façade together with provision of a plant compound, ancillary buildings and alterations to the existing site layout at Bay 37A and 37B, Shannon Free Zone, Shannon, Co Clare. The proposed works will involve alterations to the existing West façade including the replacement of existing roller shutter doors with smaller personnel doors, the provision of a new roller shutter door and the removal of existing upper-level windows. Alterations to site layout will include the provision of a first floor plant compound, dust extract manifold, new standby compressor and compound, ESB substation, transformer compound, MV/LV switch room, bulk storage units and bulk gas storage, 32 no new car parking spaces, together with all site works and services
For an extension to an existing ESB Substation and all other associated site works.
For the following development 1) Construction of a new detached dwelling house and 2) Installation of new proprietary Effluent Treatment system
For development which will consist of the construction of a dwelling house, garage, a septic tank with percolation area and ancillary site works
Of a garage and storage shed, and all associated site works
For temporary use of a hard-standing area for the breaking-up of end-of-life aircraft for recycling purposes
For the construction of a dwelling house, garage, wastewater treatment system and new entrance including ancillary site works
For the change of house design to that granted under planning reference number P21/1150 including ancillary site works
For the following 1. Replacement of existing rear extension with new two storey extension to rear and side, 2. new entrance gate, piers and parking area, including adjustment to existing boundary wall 3. minor modifications to existing elevations 4. demolition of single storey flat roof garage to side of dwelling 5. replace existing effluent with new effluent treatment system and percolation area 6. and all necessary site works and services
For the demolition of existing cottage ruins and for the construction of a storey and a half dwelling. the development will also consist of a new wastewater treatment system, site entrance and all associated site works
To develop a grass playing pitch with goalposts and ball stop netting on an existing grass area currently used for team training within the club grounds, with all associated site works. The planning application will be accompanied by a Natura Impact Statement (NIS)
For a single dwelling house, garage, advanced wastewater treatment system along with ancillary site works
For the Construction of a Dwelling House, Garage, wastewater treatment system and new entrance including ancillary site works
Of vehicular entrance/side access and all associated site works to existing dwelling
Of the construction of a detached garage, with all associated site works
To construct an Agricultural shed and associated site works
For development at the existing Ballycannon Wastewater Treatment Plant. The development will consist of: construction of a foul pump station; construction of emergency holding tank complete with cleaning system; control kiosk; demolition of existing wastewater package treatment tank; site fencing; 660m foul rising main; and all ancillary site development works including hard and soft landscaping. A Natura Impact Statement (NIS) has been prepared and is submitted as part of the planning application
To construct an extension to side and rear of existing dwelling house comprising living room, bedroom, sunroom and associated renovation works
Of existing rear extension to existing dwelling house
To demolish existing lean-to shed, construct extension comprising bedroom, bathroom, utility and all associated site works
To (a) Construct and extension to existing warehouse facility which will consist of offices, warehousing / distribution space along with sanitary and welfare facilities, (b) Construct increased parking and turning areas (c) Install new wastewater treatment system and soil polishing filter together with all associated site development works and services
For the construction of an Advanced Aerial Mobility Research Lab with a new hard surfaced hangar apron and taxiway to existing taxiway. The works include connection to N19 for site access via currently approved Planning ref 23-96, the provision of 48No. carparking spaces which include accessible spaces, EV charging areas, set-down area, secure bicycle parking spaces, louvred plant/refuse store, photovoltaic array, reconfiguration of airside/landside boundaries, building signage and a single storey substation/switchroom with all ancillary landscaping and associated site works & services including rising main with installation of a new pumping station to facilitate connection to existing airport infrastructure. The planning application is accompanied by a Natura Impact Statement
Of a car-parking area, including entrance from public road with height restriction barrier, associated fencing, signage, security lighting, and the construction of 2 storage sheds, and 2 Kazuba dry toilets, and for PERMISSION to erect a wooden outdoor shelter, all with associated site works
For development at Rineanna South, Shannon Airport, Co Clare. The development consists of the construction of a single storey high-bay Air Cargo Hub and logistics/distribution facility (2705m2) with ancillary single storey office area (335 m2). The works include a new site access and the provision of 42 no carparking spaces which include accessible spaces, secure bicycle parking spaces, louvred plant/refuse store, photovoltaic array, building signage and a single storey substation. The construction of new hard surfaced ancillary delivery/service yard with vehicular and HGV parking all ancillary landscaping and associated site works and services including the decommission of adjacent septic tank and installation of a new pumping station to facilitate connection to existing airport infrastructure. The planning Application is accompanied by a Natura Impact Statement