The development will consist of: I. 384 residential units with a cumulative gross floor area of 33,190.15 sq.m comprising: a) 122. houses, consisting of 28 two-bed units, 83 three-bed units and 11 four-bed units, ranging in height from 2-3 storeys. b) 84 duplex units, consisting of 48 one-bedroom units and 36 three-bedroom units, ranging in height from 2-3 storeys. c) 178 apartments consisting of 43 one bedroom units and 135 two-bedroom units, ranging in height from 5-7 storeys. II. tenant amenity floorspace with a gross floor area of 139 sq.m. III. 1.49 ha of public open space including a public plaza and 0.15 ha of communal amenity space; IV. the provision of a childcare facility with a gross floor area of 239 sq.m and associated play area; V. the provision of 361 car parking spaces, including 10 disabled parking spaces and 16 reserved for visitor parking and 3 reserved for creche staff. VI. the provision of 734 bicycle parking spaces, including 472 residents bicycle parking spaces and 262 visitor cycle spaces. VII. vehicular access is proposed via 3 access points including the existing Kingswood roundabout on Citywest Avenue to the north, The Walk to the west and from the park and ride access road at the eastern end of the site. Dedicated pedestrian/cyclist links are proposed throughout the site. VIII. ESB substation, 3 x ESB kiosks, rooftop solar photovoltaics, landscaping and all ancillary site and development works.
For development comprising of an Attic conversion including a dormer roof and window to rear of house for the purpose of storage. The addition of a window to first floor to the rear elevation. Addition of two windows on the side elevation, one at first floor level and the other at attic level. Internal alterations to first floor layout to allow for the addition of staircase serving attic level, relocation of bathroom and addition of an ensuite. Storeroom relocated from the first floor to the attic level.
Development at a site of 1.65ha comprising of the erection of secure anti-climb wire-mesh fencing around the perimeter of the existing building at a height of 2.1m, with associated landscaping works to screen the fencing. The provision of electronic vehicular access gates off the internal access road for access to rear service compound and car parking, vehicular barriers, and internal access footpaths, in addition to all associated site development works.
Erection of secure fencing and gates to the perimeter of the site, including all associated site development works, landscaping and planting.
Two storey office extension with a flat roof for Ground Investigations Ireland Ltd.
Permission is sought for a single storey Office Extension with a flat roof for Ground Investigations Ireland Ltd.
Demolition of the existing single-storey c. 2,605sq.m. Junior School building; demolition of the existing single-storey c. 211sq.m. Junior School ancillary structures; construction of a new part three/part two-storey c. 4,998sq.m - Junior School building, located to the west of the existing Senior School building. The new school will accommodate 27 classrooms, a 3-class base Special Education Needs facility and all ancillary accommodation (the Senior School does not form part of planning application); 2 single-storey temporary accommodation units, c. 400sq.m, located to the south of the site, to facilitate the construction of the new school building; renewable energy design measures, PV Panels and/or heat pumps located at roof level; new school signage comprising wall-mounted lettering on the front elevation of the new building; external hard play area and 2 Multi-Use Games Areas; all located to the south of the site; redevelopment of the existing staff car parking and set-down facilities within the school site comprising: provision of 40 Junior school staff car parking spaces and 6 car set-down spaces, resurfacing of 22 existing Senior school car parking spaces, 106 bicycle parking spaces, new access road, new footpaths, landscaping and all ancillary site works; boundary treatment comprising of repair works to the existing low-level blockwork wall and new metal railings to an overall height of 2.4m along Fortunestown Road; replacement of the existing palisade fencing with new 2.4m high railings along Kiltalown Park Rd to the south; replacement of the existing pedestrian and vehicular entrance gates; works in the public road outside the school site: including 5 set-down spaces along Fortunestown Road, and services connection required to facilitate the development.
Retention to retain single storey independent unit in rear garden, and all associated site works.
Upgrading and improvement of an existing, established and historic entrance to improve access and egress and overall vehicle user safety to Baldonnell Garden Centre and residential house on site, demolition of existing florist building on site, new gated entrance and all associated site works.
Permission sought for the retention of existing store and glasshouse at rear
Construction of cattle shed, dung stead, underground effluent storage tank, concrete yard, cattle crush, farm access road and all other associated site development works.
6 two storey, 3 bedroom semi-detached houses and all associated site works on a 0.19 hectare site bound by Silken Park to the north, an existing office development to the south, undeveloped residential zoned lands to the east and Kingswood Road to the west.
The development of a Regional Network Gateway (RNG) facility (supporting infrastructure for the MS data centres) comprising the following: • Construction of a single storey main building (RNG Building - c.1,124.3 sq.m) with air handling units (AHUs). • External plant/equipment yards including 3 no. diesel generators; sprinkler tank and pump house; electrical plant rooms, PV panels. • MV substation & Stormwater attenuation pond. • 12 no. car parking spaces (2 of which are EV parking spaces and with 1 accessible parking space). Bike parking shelter and bin store. • New road access provided from adjoining permitted estate road (granted under SDCC Ref. SD24A/0107W) and including bridge over existing watercourse. • Internal road and footpath layout, perimeter fencing, security gates and retaining wall. • Landscaped and planted areas including riparian corridor and swale. • Temporary Construction compound and parking area (including temporary bridging of existing watercourse/field drain). • All associated site development works, site lighting, boundary treatments, services/utilities provision (including underground works), and all other ancillary works. Total gross floor area of the development c.1,384.2 sq.m
Installation of a 0.51mx1.42mx1.806m (LxWxH) above ground enclosure, to house a new natural gas district regulating installation including a 3m high lamp post style relief vent stack with all ancillary services and associated site works on the footpath.
The installation of 1.6m x 0.87m x 0.5m (hxlxw) pressure reduction installation and 3.25m (h) vent stack with all ancillary services & associated site works.
Amendments to the development permitted under Reg. Ref. SD18A/0301 comprising of alterations to the permitted two storey data centre building including internal reconfiguration, alterations to finished floor levels, alterations to the building footprint to provide for the relocation of an internal staircore to the south of the building, and the replacement of the enclosed first floor level with an open screened roof mounted plant space (resulting in a reduction of 4,091sq.m in the gross floor area (GFA) of the data centre building); Associated alterations to the facade of the data centre building, including alterations to fenestration, cladding, step-out in the southern facade to accommodate a staircore, and a reduction in the eastern building parapet height of c. 2 metres; Provision of a canopy over the loading docks on the east facade; Alterations to the permitted generator compound, generators, and flues, including a reduction in the number of generators (5 now proposed), and provision of MV rooms within the generator compound; Provision of an ESB substation compound in the north-eastern portion of the site, comprising a single storey substation building (with a GFA of c. 125sq.m), within a 2.6 metre high security fence, 2 transformers, client control building (with a GFA of c. 47sq.m), and associated access arrangements; The ESB substation compound will be accessed from Kingswood Drive; Omission of the permitted sprinkler tank, pump room and 10kV Substation, reconfiguration of the permitted car parking, and revisions to permitted boundary treatments; Associated alterations to landscaping, access and internal road arrangements, services, lighting, and layout, and all associated and ancillary works.
Minor alterations to the existing Pastoral Centre to include the formation of a new entrance door and enlarged window on the elevation to Fortunestown Road. The provision of a community café service within the existing main room of the building and all associated works including new skylights to north & south faces of the roof & minor site works.
Planning permission for the construction of 2 no semi-detached 2 storey dwellings, including all associated site works, landscaping and SUDs drainage details, increasing a section of the side boundary wall to 1.8m in height, new vehicular access exiting onto Cloonmore Drive, Dublin 24, for each dwelling, all at the site to the side of 1 Cloonmore Drive, Dublin 24.
The construction of a two storey extension (c.70m.sq.) to the side of the existing two storey dwelling along with the widening of the existing vehicular access including dishing of kerb, alterations to the existing boundary treatments and all other ancillary site development works at 1 Cloonmore Drive. Retention permission is also sought for the existing single storey shed (c.35m.sq.) to the rear of the existing dwelling.
For the construction of a single two storey three bedroom detached dwelling to the side of the existing two storey dwelling along with new vehicular access and dishing of existing kerb on the western boundary and all other ancillary site development works.
Additional 2no. fuel pumps and 2 no. islands. Retention permission is also sought for works completed. The completed works consist of the installation of 4 number underground fuel tanks (each fuel tank has a capacity of 75,000 litres and store HVO and BIO fuels), including a network of pipes and inspection manholes. These new tanks are located below ground in the Southeast corner of the site.
Relocation of 3 fuel pumps and the reconfiguration of permitted fuel islands from 1 long fuel island and 1 small fuel island to now provide for 3 small fuel islands, demolition/removal of single storey building along southern boundary and 1 new truck wash to south-western boundary of site; Planning permission is sought to remove 1 existing truck wash along the western boundary, demolition/removal of existing storage building to the western boundary and alterations to internal road layout to include directional arrows.
The proposed development seeks to provide a temporary construction access road including entrance from Baldonnel Road to provide for the construction of a Regional Network Gateway (RNG) facility permitted under South Dublin County Council Reg. Ref. SD25A/0035W. The works will also involve the temporary provision of a security hut, security gate, vehicle set down area, associated fencing, lighting, civils, drainage, and landscaping works. The temporary works will be removed and lands reinstated to their former use when the construction of the RNG facility is complete.
Construct agricultural shed incorporating loose and storage areas; wall manure area; hardcore area and access roadway; upgrading existing entrance and all associated site works.
Retention/change of use for existing development and shed/outbuilding; the development was originally built for residential purposes but is currently being used as a childcare facility.
Provision of 527.2 sqm of photovoltaic solar panels on the roof of the existing building.
Single storey extension of 57sqm to side and rear of existing dwelling with flat roof.
Part single storey, part two storey dormer extension of 170.43sq.m. to rear of an existing 49.57sq.m. house; a domestic garage, a wastewater treatment system and all ancillary works.
Retention for the existing single storey pre-school and afterschool childcare buildings with associated site works.
The works consist of the construction of an adjoining single-storey special education needs (SEN) unit (540sqm.) to the west of the existing school building and will include two SEN classrooms with safe base and storage facilities, a central activities space, office, multi-sensory room, cleaner's stores, storage rooms, toilets, shower areas, and associated ancillary spaces plus an additional 6no. car parking spaces to the north of the proposed extension. Other works include the relocation of the existing attenuation tank; the relocation of the junior play area and orchard, and the inclusion of a new sensory garden (100sqm.) and a secure soft play area (100sqm.) to the west, with all associated site works.
Installation of 2 x 3 meter high extract flues from proposed laboratories; construction of a covered boat storage compound within a secured parking area formed with a new 3 metre high security fence with access gates to the rear (north-west) side of the site, internal alteration within the existing building and all associated site works.
Proposed attic roof space conversion to attic bedroom with dormer window to front part of roof and 2 rooflights to rear part of roof with all associated internal and external alterations to dwelling house.
Single storey front extension and all associated site works.
Permission for alterations to existing building (unit 1) to the southwest elevation, namely, 2no. additional dock levellers and re-location of 1 existing roller door and all associated site works
Construction of 4 warehouse/industrial units in 3 buildings of c.13,611sq.m total gross floor area (including ancillary offices and operational facilities) and up to 15m in height, with rear service yards; 155 car parking spaces; 72 cycle parking spaces; water services infrastructure and sustainable urban drainage system features, including relocation and resizing of a pump station permitted under SD15A/0391; internal road network accessed via 2 site entrances established in the previous planning applications on the Eastern and Southern sides of the site, via the roundabout at Citywest Avenue and the R136 outer ring road; amendments to the proposed tree pits along the green-link permitted under SD15A/0391; public lighting, landscaping, planting and boundary treatments throughout the development; all other necessary site and infrastructural works to facilitate the development.
Detached 2 bedroom dwelling at the vacant garden plot site including dishing of existing footpath and kerb finishes allowing for vehicular access across the site boundary to enable the provision of 1 off street parking space and all associated site works.
Construction of a detached, three bedroom dwelling at the vacant garden plot to include dishing of existing footpath and kerb finishes allowing for vehicular access across the site boundary to enable the provision of 1 off-street parking space and all associated site works.
A residential development of 77 dwellings comprised of 63 two storey houses and 14 apartments & duplex units accommodated in one 3 storey building. The proposed houses are comprised of 8 two bed houses & 55 three bed houses; the proposed apartments & duplex units are comprised of 7 one bed apartments at ground floor & 7 three bed duplex units overhead. The proposed development also provides for all associated site development & infrastructural works, car & bicycle parking, open spaces, hard & soft landscaping, boundary treatments and bin & bicycle storage; access to the development will be via a new vehicular entrance at the south-west corner of the site off the Old Naas Road. Permission is also sought to demolish the existing building on site approximately 455sq.m. all on a site area of 2.28Ha, at Gordon Park, Old Naas Road, Kingswood, Dublin 22 bounded to the west by the Old Nass Road, to the south by the Silken Park development and is located in the townland of Brownsbarn.
Installation of site services including the construction of a new gravity foul sewer, foul pumping station and rising main discharging to the public sewer, connection to the public watermain, boundary landscaping and planting treatments including removal of central hedgerow, provision of 'green link' path. Installation of a sub-surface collector drain and infilling of central dry drainage channel. Vehicular and pedestrian/cyclist access points, internal road commencement (details as marked on submitted plans) and all ancillary development works as necessary to facilitate future development at this site.
Permission for partial change of use from Warehouse to Office use at ground floor level with floor area of 297 sq.m; extension for office use at first floor level with floor area of 256 sq.m; addition of staircase from warehouse to first floor level; to include all associated site works to facilitate the development. Amendment to previously approved planning permission (Ref. No. SD22A/0465) to remove the 133 sq.m Mezzanine level in the description of the development and submitted plans and particulars at Unit 2B, South West Business Park, Cheeverstown, Citywest, Dublin 24.
Partial Change of use from warehouse to office use with floor area of 551sq.m; Addition of mezzanine level with a floor area of 133sq.m; Addition of staircase from warehouse to mezzanine level to include all associated site works to facilitate the development.
10-year planning permission for Phase 2 development (Unit 4); the construction of 1 industrial/warehousing unit of approximately 14,730sq.m gross floor area (including ancillary offices and operational facilities) and up to approximately 17m in height, with rear service yard; 155 car parking spaces; 72 cycle parking spaces; water services infrastructure and sustainable urban drainage system features; 2 entrances and internal road network, which will connect to Citywest Avenue and the R136 Outer Ring Road via the internal estate road network proposed under Reg. Ref. SD21A/0150; pedestrian/cycle entrance to the south-east at Citywest Avenue; public lighting; landscaping, planting and boundary treatments throughout the development; external sprinkler tank and pumphouse; and all other necessary site and infrastructural works to facilitate the development on a site generally bound to the east by the R136 Outer Ring Road, to the south by Citywest Avenue and to the west and north by undeveloped lands subject to a Phase 1 industrial/warehousing development planning application (Reg. Ref. SD21A/0150) and having been granted planning permission for infrastructural and enabling works under Reg. Refs. SD15A/0391 (extended by SD15A/0391/EP) and SD16A/0400, and with the Phase 1 industrial/warehousing development planning application (Reg. Ref. SD21A/01.50) currently being assessed by South Dublin County Council.
Construction of a three storey building, accommodating 13 residential units and a ground floor cafe (55sq.m); The proposed dwellings are comprised of 6 one bedroom ground floor apartments, with 7 three bedroom duplex units overhead; All associated site development & infrastructural works, car & bicycle parking, open spaces, hard & soft landscaping, boundary treatments, bin & bicycle storage etc; Access to the development will by via the permitted vehicular entrance to the south-west serving the Gordon Park residential development on site bounded to the west by the Old Naas Road, to the south and east by a permitted residential development (Ref. SD21A/0327) known as Gordon Park and is located in the townland of Brownsbarn.
Retention permission for 3 No of storage units / valeting bays, with car parking car storage area with all associated site works
Development at this site on lands that include the Aylmer Road (L6003); Baldonnel Road (L2001); and lands that include a small section to the north, but are primarily to the south, of the Aylmer Road, including part of the Griffin allotments, within the townland of Kilmactawlay and Milltown, Newcastle, Co. Dublin consisting of the widening, to its south, of the existing Aylmer Road (L6003) from its junction with the Baldonnel Road (L2001) for a distance of c. 520m to the west. The widened road will tie in with the existing road to the west of a proposed new roundabout. The new roundabout will be created by utilising lands to the north and south of Aylmer Road to facilitate access to a new internal estate road (270m in length) to its south-east with a new roundabout at its end that will provide future access to the lands to its north and south. The widening of the Aylmer Road to a 7.5m wide carriageway will be almost entirely to its south and will include a proposed new shared cycle path and pedestrian footpath along its southern side, with the existing hedgerow to be retained for large lengths, and a new hedgerow to be planted where the existing one is to be removed. The proposed new shared cycle and footpath will tie in with a proposed new footpath and cycle path that will be located either side of the new internal estate road. These works will include the provision of 2 new dry attenuation basins on the south side of the widened road. The development will include all ancillary infrastructural works, street lighting, site development and ground works, including fencing, signage, and landscaping.
Relocation of the existing Clondalkin RFC grounds at Gordon Park to new lands at Kingswood Farm, Moneenalion Commons Lower Clondalkin and comprising of 4 new rugby playing pitches, including a high quality main competition pitch (with modern directional floodlighting comprising 18m high floodlighting columns either side) and a high quality Junior pitch both laid approximately level, and two back pitches as well as various grassed rugby training areas all laid on existing land cross fall levels; change of use of existing agricultural shed to accommodate new two storey changing facility and storage areas; a new two storey Clubhouse Pavilion with supporting facilities including dressing rooms, physio rooms, coffee dock, committee rooms, members bar and lounge, plantroom and toilets; all associated site development sustainability and infrastructure work including connection to existing public foul sewer, SUDs, sedum roof and PV roof panels; new landscaping throughout the site comprising trees, hedges and wild flower areas; new cycle track and pedestrian access and stairs off the R136, bicycle shelter, children's playground area, electrical car charging stations, vehicle parking and new vehicle entrance off the Old Country Roadway.
Two storey two bedroom semi-detached house; Demolition of side rear extension to existing house.
Ten-year planning permission is sought for the expansion of existing Google Ireland Limited operations at Grange Castle Business Park South, Dublin, including the development of a 72,400m² data storage facility which will incorporate data halls with associated support areas, a high voltage compound, offices and staff facilities, a loading area, mechanical and electrical yards, internal and external utilities, security fence and gates, landscaping including acoustic screening, 2 no. stormwater attenuation ponds, additional internal vehicle and pedestrian infrastructure, together with ancillary buildings and site infrastructure. The development also includes the creation of a new active travel thoroughfare connecting Grange Castle Business Park South and Profile Park Road.
Planning permission is being sought by Peamount Healthcare CLG for part change of use from ancillary staff accommodation to laundry, and material alterations to include; (i) new door - front elevation (ii) new double doors - side elevation (iii) new double doors - rear elevation (iv) internal alterations and all associated site works at the Avenue Building, Peamount Hospital Campus, Newcastle, Country Dublin
Extend the existing two storey building on site that provides after-school education to students in the area, where the new building will facilitate second and third level students; a new shared entrance serving both buildings; proposed extension is a two storey building, matching the scale and massing of the existing building; the building has been designed to achieve a Net Zero Whole Life Carbon standard and this in part is achieved by an external brick skin, a cross laminated timber structural system, harnessing of natural light and extensive use of photovoltaic solar panels; the building programme will provide a lecture theatre, a science laboratory, classrooms, a reading room, offices, a central atrium, and a kitchen facility; the flat roof will carry solar photovoltaic solar panels and a biodiversity outdoor classroom, and all associated site works; relocate the muga within the complex to the east of the existing building and provide additional outdoor sports equipment; all proposed boundary fencing will match the existing boundary treatment in size and material.