2-bed, 2-storey, detached dwelling to the north side of the existing house, with new vehicular access and on-site car-parking
Change of use (removal of condition 2 of PRN 04/1887) from restricted use as a dwelling to use by all classes of persons
Single storey detached garage and alterations to convert part of existing garage to studio with ancillary works
Home office / private studio and associated works
Removal of planning condition no. 2 of planning reg. ref. no. 96/5066 (from restricted use as a dwelling to use by all classes of persons) and retention of domestic garage as constructed on site
Glazed conservatory type link corridor (31sqm) to the rear of the existing dwelling house
Change of use of the playschool room for use as a family residential room and for any ancillary minor contingent works
Construction of a single storey extension to side and rear of the existing house, changes to all elevations and connecting to existing mains services and all ancillary site works
(1) Repositioning of proposed Waste Water Treatment polishing filter unit as granted under PRR 24/60466 and (2) Repositioning of existing field gate
Section 254 - Roadside Directional Signs - Location 7 Map WH3
Change of use from 50m2 double garage into a one bedroom granny flat and associated siteworks
A dwelling, garage, bored well, wastewater treatment system to current EPA standards and all associated ancillary site works and services
New single storey house and garage and installation of a new sewage treatment system unit and soil polishing filter to EPA 2021 standards, new entrance and associated siteworks
Construction of a new 230 square metre farm building and hard standing, for agricultural use as a sheep shed, together with all necessary ancillary works, drainage and fencing
A new sewage treatment system to EPA standards and all associated ancillary site works and connection to services
Extend the appropriate period of 16/334 - (1) the conversion of the existing studio granny flat, (2) the raising & re-roofing of the existing studio roof to include a dormer window to the front, (3) internal alterations & (4) associated site works
A) Retention permission for calf rearing shed, b) Planning permission for the construction of an agricultural shed comprising of cubicles and feeding area with underground slatted slurry storage tanks, c) Planning permission for a new machinery road and all associated siteworks
The construction of an 18 metre monopole support structure (overall height of 19.5 metres) carrying telecommunications antennas, dishes and associated equipment, together with new ground level equipment cabinets, landscaping and all associated site works
Construction of a new dwelling, wastewater treatment unit and polishing filter, connection to public water supply, new entrance onto laneway which leads to public road and associate works
New dwelling house, new entrance with sight lines, connection to existing sewage and public water supply, all associated works
Section 254 - Roadside Directional Signs - Location 16 Map WH7. Opposite Hospice
Demolition of single-storey extension to side and erection of single/two-storey extension to rear with new sewage treatment system, and ancillary site works
The development consists of full retention permission and planning permission for the following (1) retention for 6 cabins and permission to change window size to beech lodge cabin (2) retention for reception cabin (3) retention for a meeting shelter (4) retention for change of use from agricultural building to a staff house and permission to alter window sizes to the rear and side elevations (4) retention for bike shed and permission for a bike shelter to side of bike shed (5) retention permission for overnight parking facilities for maximum 8 no motorhomes (6) retention for a storage shed and permission for underground water storage tank (7) retention for laundry room, laundry storage, prep room, office, external separating wall and permission to extend building to include gym and office space and the provision of solar panels to roof plane (8) retention for 3 containers, container A to be used as art and craft room, container B and C to be used as storage (9) building no 5 retention for change of use from storage/private games room to living space and also retention for a window to the side elevation and permission for extension to the rear to be used as a café area and extension to front elevation (10) permission for extensions to existing guest house to the side elevation and rear elevation and associated works (11) retention for revised boundaries (12) permission to upgrade existing effluent treatment system and associated works
RED III Category 3 Development - Construction of a solar PV energy development with an operational life of 40 years on three land parcels totalling approximately 203.5 hectares comprising the installation of approximately 806,630 sq. m. of photovoltaic panels on ground mounted frames and associated ancillary development including: 23 no. transformers stations, 2 no. Ring Main Unit buildings, string-inverters attached to panel frames, CCTV security cameras mounted on 4 metre high poles, deer-proof perimeter security fencing (2 metres high) raised 150mm to allow for the movement of small mammals, 3 no. site entrances utilising existing entrances including upgrade to entrance on L1111 to facilitate construction and operational phase access, internal access tracks between the solar arrays and the site entrances, 2 no. clear span bridges over existing watercourses, 1 no. primary temporary construction compound and 2 no. satellite temporary construction compounds, all associated ancillary development works including landscaping; and the installation of a total of ca. 6.1 kilometres of 33Kv double circuit underground cable, of which ca. 2.4 kilometres will be beneath public (L1111, L1113, L5113, L51132 and L5112) and private roads in an excavated trench including underground ducting and joint bays and all associated site development and reinstatement works to connect the proposed Ring Main Units on two of the land parcels of the solar PV energy development and extending to the site of a proposed 110kv substation to be the subject of a separate planning permission under the Planning and Development (Strategic Infrastructure) Act 2006.
Existing road boundary, hedgerow and raised ditch, also for omission of previously permitted setback & roadside parking, all in line with local concerns & current parking policy for the immediate area
For demolition of single-storey extension to side and erection of two-storey extension to rear with new sewage treatment system, relocation of recessed vehicular access and ancillary site works
The provision of a single storey extension consisting of 2no. Mainstream Classrooms, a 1no. Classroom Special Education Unit, 2no. SET Rooms, Boiler House, and a Link Corridor to connect the existing 3no. separate buildings (proposed floor area = 500.0sqm) to existing School Building (existing floor area = 616.0sqm), together with a secure external soft play area, minor internal alterations and elevational amendments, and all ancillary site development works
Garage/home office as constructed on site and all associated site works
Garden Structure to the end of the dwelling
Construct 12 fully serviced detached dwelling houses with associated site works, access roads & services and connection to public services and provision of set down parking for Primary School and school bus turning area
Construction of a new dwelling, wastewater treatment unit and polishing filter, new well, block up existing entrance onto public road, new entrance onto public road and associate works
Extension of 32m2 to the side of the dwelling
New roadside entrance to access farm along with all associated ancillary works
Overground electronic communications infrastructure and associated physical infrastructure
9 fully serviced detached dormer dwelling houses with associated site works, access roads and services and connection to public services and provision of school car parking, school bus set down and turning areas
Change of house type (part single storey, part two storey) to that previously granted approval under planning ref. 17/466, together with wastewater treatment system and all associated site works
Construction of a new dwelling, garage, septic tank and percolation area, new well, new entrance onto existing lane which leads to public road, upgrading existing entrance onto public road and associate works
Construction of a new farm entrance and fence onto the R761, access road and associated works
Upgrade of existing septic tank system to a new 8 person wastewater treatment unit and 60sqm soil polishing filter in accordance with the EPA 2021 standards together with all associated site development works
New two storey dwelling house and domestic garage and all associated site works including, new on site bored well, new on site waste water treatment system and percolation area, new on site Soakaway for surface water run-off, for forming a new vehicular access from public road to site
Dwelling as constructed (without restrictive conditions, similar to condition no. 2 as granted under 92/7867), which includes minor revisions to the internal layout, including minor revisions to window dormer and Velux window locations and revisions to site boundaries together with all associated site works
Demolition of existing garage (74sqm) construction of a 2 storey house (214sqm) single dwelling with solar panels and all associated site works
Amendments to PA.Reg.Ref.17/163 and ABP.Ref.301391 and as amended by PA.Reg.Ref.21/956 to permitted Blocks B and C to result in an increase in height from 18.29m to 24.97m
Re-arrangement of existing entrance drive way to allow for two separate driveways, for existing house and previously granted dwelling
Removal of existing thatch roof cover and proposed replacement of same with grey metal standing seam roof cladding, proposed velux windows and associated works
Amendments to PA. Reg. Ref. 17/163 and ABP. Ref. 301391 and as amended by PA. Reg. Ref. 21/956 and PA. Reg. Ref. 22/887. The following amendments are proposed to the permitted film studios development: 1. the relocation of permitted Blocks F and F2. 2. an increase in height of permitted Block F from 16.8 m to 24.4m. 3. minor Modifications to permitted access corridors/ skywalks in Block F, F1 and F2 as a result of relocation. 4. proposed changes in Elevation to permitted Block F, F1 and F2. 5. a decrease in height of permitted Block B1 from 17.25m to 13.7m. 6. proposed changes in Elevation to Permitted Blocks B, B1 and B2
New 2 storey extension to existing dwelling,raising of existing roof to cater for first floor extension, a single storey side and rear extension with a balcony above,new storage shed to front of existing dwelling, upgrade of existing effluent disposal system to current Epa standards and all associated site works
Section 254 - Roadside Directional Signs - Location 15 Map WH7
Upgrade of the existing septic tank system to a new 8 person wastewater treatment unit and 60sqm soil polishing filter in accordance with the EPA 2021 standards together with all associated site development works
(1) upgrade and relocate existing farm entrance to provide sight lines & (2) agricultural shed