To form new vehicular site entrance and construct single storey dwelling house with foul drainage connected to Wastewater Treatment System and Percolation beds with new water supply borewell with all associated site worksGrounds not yet categorised
Retention of a detached structure with the curtilage of the existing dwelling house providing habitable accommodation for purposes incidental to the enjoyment of the existing dwelling house and associated works atGrounds not yet categorised
Of Planning File 17/761 for the construction of a new two storey split level family dwelling, together, with permission for site development works for 4 no serviced sites including connection to public services, new entrance onto public road, boundary treatment, landscaping and all associated worksDecision record indexed
For construction of extension to front of existing dwelling and the upgrade of existing septic tank to wastewater treatment system, construction of new percolation area and all associated site worksDecision record indexed
Extension of Duration of previous planning permission granted under 17/761 for the construction of a new two-storey split level family dwelling, together with permission for site development works for 4 no. serviced sites including connection to public services, new entrance onto public road, boundary treatment, landscaping and all associated site worksGrounds not yet categorised
Of the construction of a new part 2 part 3 storey split level family dwelling, boundary treatment, landscaping and all associated site works subsequent to previous planning ref: 17/761Decision record indexed
To construct a Glamping Area consisting of 5 no. Serviced Glamping Pods, proprietary wastewater treatment plant, new entrance from existing private lane, borewell water supply, Works will entail adjustment to the roadside boundaries at the junction of the private lane and L4082 Road to facilitate the required sight lines and all other associated site development works to facilitate developmentGrounds not yet categorised
To construct a Glamping Area consisting of 5 no. Serviced Glamping Pods, proprietary wastewater treatment plant, new entrance from existing lane, borewell water supply and all other associated site development works to facilitate developmentGrounds not yet categorised
For a split level dwelling house over three floors, new vehicular entrance and parking area, connection to services and all associated site works atGrounds not yet categorised
Demolition of partially constructed two storey dwelling previously granted under planning reference 02/48 (An Bord Pleanala Ref. 24.129503), for the construction of a new two storey dwelling with attached single storey garage and a new treatment system with associated percolation area, all with associated site development worksDecision record indexed
The construction of a dormer type single-family dwelling, demolition of an existing derelict structure on site, alteration to the front boundary wall, new site entrance and all ancillary site worksDecision record indexed
For (a) to demolish existing old slatted sheds (b) construction of a new straw bedded cubicle and feeding shed with underground slatted slurry storage tanks (c) construction of cubicles with underground slatted slurry storage tanks into existing straw bedded shed (d) construction of cubicles and feeding area into existing straw bedded shed (e) construction of unroofed underground slatted slurry storage tank onto existing collecting yard and all associated site works atDecision record indexed
For the construction of a new single storey dwelling house and garage, new vehicular entrance,together with new proposed secondary treatment system and soil polishing filter with percolation area, together with all ancillary and associated site worksDecision record indexed
Form new vehicular site entrance and construct new single storey Dwelling House, connect foul drainage to wastewater treatment system and percolation beds, with new water supply borewell with all associated site worksGrounds not yet categorised
For the following works to existing dwelling house, the de-commissioning of the existing septic tank and percolation area, together with the construction, installation and re location of a new proposed secondary treatment system and soil polishing filter with percolation area to serve the existing dwelling house, together with all ancillary and associated site worksDecision record indexed
The construction of a two storey family house and adjacent garage, to replace an existing bungalow that is to be demolished. The proposed work will include the decommissioning of an existing septic tank and replacement with a new wastewater treatment system, landscaped gardens and sundry other minor worksDecision record indexed
For sub division of an existing rear garden to create two separate private amenity spaces, 'private amenity space A' will be attached to Cottage No. 1, The Village (A Protected Structure) and 'Private Amenity Space B' will be provided for The Pilot House, an existing residential unit within the curtilage of Cottage 1. Permission is also sought to construct a single storey extension of 23 square metres, to the Pilot House to bring the total floor area to 45 square metres along with associated development works to facilitate the development ofDecision record indexed
The indefinite retention of the sub-division of the existing site, together with indefinite retention of elevational alterations to the rear of The Pilot House (PROTECTED STRUCTURE)Grounds not yet categorised