RETENTION OF AN EXISTING TELECOMMUNICATIONS SUPPORT STRUCTURE PREVIOUSLY GRANTED UNDER P05/2749 TOGETHER WITH ASSOCIATED GROUND EQUIPMENT CABINETS AND SECURITY FENCEDecision record indexed
CONSTRUCT NEW DWELLING, CONSTRUCT SHEDS ON EXISTING DWELLING FOOTPRINT (RUINS), CONSTRUCT NEW CAR GARAGE, WITH EFFLUENT TREATMENT SYSTEM, AND ALL ASSOCIATED SITE WORKS AND RETENTION PLANNING PERMISSION OF SITE WORKSGrounds not yet categorised
CONSTRUCT A NEW DWELLING, CONSTRUCT SHEDS ON EXISTING DWELLING FOOTPRINT (RUINS), CONSTRUCT NEW CAR GARAGE, WITH EFFLUENT TREATMENT SYSTEM, AND ALL ASSOCIATED SITE WORKS AND RETENTION OF SITE WORKSDecision record indexed
The proposed development will consist of the installation of a 36 metre lattice telecommunications support structure with a headframe carrying antennas, dishes, remote radio units (RRU’s), associated equipment, together with ground based equipment cabinets, palisade fencing, cable ladder, cable trays, gantry poles, site lamp, concrete foundations, concrete plinths, GPS, access track and all associated site development works to provide for high-speed wireless data and broadband services.Decision record indexed
FILLING OF LANDS WITH INERT WASTE MATERIAL CONSISTING OF SOIL & STONE FOR THE PURPOSE OF QUARRY RESTORATION AND ALL ASSOCIATED ANCILLARY WORKS.Decision record indexed
Construction of a single storey extension to the front of an existing dwelling house, minor elevational changes to the existing house, decommissioning of existing foul water system and installation of a new onsite wastewater treatment system and all ancillary worksDecision record indexed
RETAIN DWELLING HOUSE AND GARAGE AS CONSTRUCTED, ALL AS PER DRAWING DOCUMENTS SUBMITTED TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICESDecision record indexed
A single storey, stand alone building to provide a Sensory Regulaton Cubbie Unit for 'on demand' use by persons with autism or other sensory needs to mitigate the effects of sensory overload, along with ancillary accommodation of a storage area, WC and an office space.Decision record indexed
CONSTRUCT DWELLING HOUSE, GARAGE AND PROPRIETARY EFFLUENT TREATMENT UNIT WITH ASSOCIATED PERCOLATION BED INCLUDING ALL ANCILLARY SITE WORKSDecision record indexed
CONSTRUCTION OF A NEW DWELLING HOUSE, ON-SITE WASTEWATER TREATMENT SYSTEM, AND CONNECTION TO EXISTING SERVICES TOGETHER WITH ALL ANCILLARY SITE DEVELOPMENT WORKS. A NATURA IMPACT STATEMENT (NIS) HAS BEEN SUBMITTEDDecision record indexed
THE EXTRACTION AND PROCESSING OF ROAD CONSTRUCTION MATERIALS FOR THE PROPOSED N5 WESTPORT TO TURLOUGH ROAD AND TO REPLACE THE MATERIALS WITH INERT FILL FROM THE AFOREMENTIONED PROJECT (SURPLUS INERT SOIL AND SUBSOIL) ON A 4.95 HECTARE SITE.Decision record indexed
CONSTRUCTION OF AN EXTENSION TO EXISTING DWELLING HOUSE, UPGRADING OF EXISTING SEPTIC TANK AND PERCOLATION AREA AND ALL ANCILLARY WORKSDecision record indexed
NEW AGRICULTURAL SHED INCORPORATING SHEEP HOUSING AND GENERAL PURPOSE STORAGE, E.G. HAY, STRAW, AND MACHINERY ALONG WITH ALL ANCILLARY SITE WORKSDecision record indexed
Planning Permission to carry out partial demolition of an existing dwelling and to construct a new extension, along with a proprietary effluent treatment system, domestic garage, and all associated ancillary site development worksDecision record indexed
The development will consist of a change of design from that previously granted under planning permission Ref. No. 22/825, consisting of the construction of an extension to the existing community centre, together with all associated site works.Decision record indexed
EXTENSION AND ALTERATIONS TO EXISTING PRIMARY SCHOOL, WORKS TO SET DOWN AREA ON MAIN ROAD/N84 BOUNDARY TO ACCOMMODATE ACCESS FOR EMERGENCY SERVICES, WORKS TO SOUTHERN BOUNDARY INCLUDING REMOVAL OF EXISTING HEDGE AND TREE LINED BOUNDARY AND REPLACEMENT WITH NEW FENCE AND PROVISION OF NEW PEDESTRIAN ACCESS, INCREASE SIZE OF YARD PLAY AREA AND CONSTRUCT WALKWAY AROUND THE PERIMETER OF THE SITE AND ALL ANCILLARY SITE WORKS AND SERVICESDecision record indexed
Construction of a detached dwelling house, domestic garage, proprietary treatment system and all associated site works at the above addressDecision record indexed
Carry out renovations to existing dwelling house and convert attic space into habitable area and associated works to existing dwelling houseDecision record indexed
DEMOLITION OF EXISTING DWELLING, CONSTRUCTION OF A NEW BUNGALOW AND THE INSTALLATION OF A SEWAGE TREATMENT UNIT & PERCOLATION SYSTEM, TOGETHER WITH ANCILLARY SITE DEVELOPMENT WORKSDecision record indexed
CONSTRUCTION OF AN EXTENSION TO AND RENOVATION OF AN EXISTING HOUSE, INSTALLATION OF A SEWAGE TREATMENT UNIT & PERCOLATION SYSTEM, TOGETHER WITH ANCILLARY SITE DEVELOPMENT WORKSDecision record indexed
RETAIN EXISTING HOUSE AS CONSTRUCTED, CONSTRUCT AN EXTENSION, INCLUDING INSTALLATION OF A NEW SEPTIC TANK/WASTE WATER TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS AND SERVICESDecision record indexed
Renovate existing cottage and construct new extension along with upgrade of wastewater treatment system along with all necessary site works and ancillariesDecision record indexed
RETAIN EXTENSION TO SOUTHERN ELEVATION OF EXISTING DWELLING HOUSE AND INCLUDING CONVERSION OF FORMER AGRICULTURAL BUILDING TO HABITABLE SPACE. FULL PERMISSION IS SOUGHT FOR UPGRADE OF EXISTING SEPTIC TANK IN LINE WITH EPA CODE OF PRACTICE 2021 AND TO CARRY OUT ANCILLARY SITE WORKSDecision record indexed
The development will consist of improvement and upgrade works to Club facilities and grounds as follows: 1. Provision of three new EV charging points 2. Construction of a Sensory Garden 3. Upgrading of main entrance and provision of footpath, cycle path, covered bike store and additional car parking. 4. Construction of upgrade works to new training pitch including provision of floodlighting, ball-stop nets, boundary fencing, dugouts, new maintenance vehicle access and associated works.Decision record indexed
Modifications to existing elevations previously granted permission under P98/2658, the modifications include the installation of new window and door openings to elevations together with ancillary development worksDecision record indexed
The proposed development will consist of a 3 metres high extension on top of the existing 30 metres lattice telecommunications support structure previously granted permission (Pl. Ref. 062099) to give an overall height of 33 metres, together with associated equipment antennas, dishes, GPS antennas, supporting fixtures and all associated site development works for use by the Emergency Services (Garda, Ambulance, Fire Brigade).Decision record indexed
Construct dwelling house and domestic garage with connection to effluent treatment system together with associated site servicesGrounds not yet categorised
CONSTRUCT DWELLING HOUSE, DOMESTIC GARAGE, INSTALLATION OF A NEW SEPTIC TANK/WASTEWATER TREATMENT SYSTEM AND ALL ASSOCIATED SITEWORKS AND SERVICESDecision record indexed
Extend the existing car storage and dismantling yard to incorporate additional car storage and a new metal storage area for scrap metal recovered from the car dismantling process and other sources along with associated site worksDecision record indexed
CONSTRUCTION OF A PART SINGLE STOREY/PART TWO STOREY DWELLING HOUSE AND SINGLE STOREY DOMESTIC GARAGE, SITE ENTRANCE AND ACCESS ROAD, SEPTIC TANK WITH PROPRIETARY EFFLUENT TREATMENT UNIT AND PERCOLATION AREA, AND ALL ASSOCIATED AND ANCILLARY SITE DEVELOPMENT WORKS AND SERVICESDecision record indexed
Alterations and extension to existing derelict dwelling house, a new domestic garage and the replacement of the existing septic tank and percolation area with a new septic tank treatment system along with ancillary site worksDecision record indexed