For the construction of an extension to the Bunratty Manor Hotel consisting of 4 no suites, carparking an all ancillary site works
To RETAIN the use of part of existing retail shop for off-licence use and to RETAIN new exterior signage and all ancillary site works
To Extend the Appropriate Period for Planning Permission P16/555 for the construction of a tyre repair and replacement garage facility including ancillary site works
For a development comprising 48 no. residential units, (14 no. detached houses, 28 no. semi detached houses, 6no.terrace houses), ancillary surface car parking, vehicular, pedestrian access to the proposed development via a new junction off Bunratty West Holiday Village connecting to the L3126, connection to existing public water supply; foul water drainage services including the provision of surface water attenuation and all associated site development and landscape works on lands. The planning application is accompanied by a Natura Impact Statement.
Of amended site boundaries and updated location of Treatment System and Percolation Area as granted under P19/350
To A) Retain existing Granny Flat, garage & sheds. B) Construct extension and carry out alterations and fenestration changes to existing granny flat together with all associated site development works and services
To construct a single dwelling house, garage, advanced wastewater treatment system and ancillary site works
To construct a dwelling house, entrance, installation of a proprietary treatment system and polishing filter and all associated site works
For development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
For alterations to the elevations, site boundaries and site layout plan granted full planning permission under planning reference number P21/905
For development which will consist of (1) demolition existing sub standard dwelling house (2) the construction of a new dwelling house, garage, a proprietary waste water treatment system and ancillary site works
To erect a dwelling house, install an effluent treatment system and percolation area, access road and all associated site works. A Natura Impact Statement will be submitted with this application
To construct a storey and half dwelling house, installation of a wastewater treatment system and percolation area, new site entrance and associated site works
To erect a private dwelling house, install an effluent treatment system and percolation area, access road and all associated site works. A Natura Impact Statement will be submitted with this application
To construct 4 dwelling houses together with all associated site works and services
For a single storey flat roof, behind parapet, extension to the rear and side together with alterations including, replacing sun room pitched roof with flat roof, behind parapet, to match new, rooflight on new flat roof and wall enclosing flat roofed external double car port with gate to the side together with associated site works
Is sought for the proposed works: 1) removal from site and decommissioning of existing 3 No. overground fuel tanks and existing underground fuel tanks; 2) removal from site of existing washing machines facility and removal of unauthorised disused manual car wash; 3) removal of existing forecourt canopy and 4 No. fuel pumps; 4) proposed change of use from storage area to customer toilets, on the ground floor of the existing building, to include minor changes to elevations; 5) construction of new 3 No. dispenser pump islands, dispensing fuel on each side, with new canopy over; 6) installation of new underground fuel tanks, and all associated fuel pipework, off-fill points and vents and installation of new truck/HGV fuelling pump; 7) alterations to existing parking areas to provide new car parking layout, with provision of EV charging spaces and bicycle stands; 8) construction of new ESB sub-station; 9) concrete slab surfacing, asphalt surfacing and associated drainage with the provision of new Class A Petrol interceptor; 10) alterations to existing site entrances, to provide 2 No. vehicular site entrances to and from the site from public road, including alteration/extension of existing front boundary wall; 11) construction of all associated site features including public lighting and all associated ancillary site works. Planning permission for RETENTION is also sought for the existing works as constructed: 12) existing totem sign; 13) existing signage on front and side (east) elevation of amenity building; 14) existing block boundary walls along eastern and western site boundaries; 15) existing single-storey storage rooms to rear of amenity building, as constructed; 16) change of use from tea room use to residential use to provide 1 No. apartment at first floor level, inclusive of access stairs, as constructed; 17) change of use from storage areas to retail area at ground floor level of existing amenity building, as constructed; 18) existing outdoor seating areas, as constructed; 19) elevational changes to existing elevations, as constructed
To erect a private dwelling house, install an effluent treatment system and percolation area, access road and all associated site works
For development, the development consists of the construction of a milking parlour and associated site works
Of the following (a) the existing standalone garage, (b) retain the extension to the rear (south) of the house along with the conversion of the integrated garage to accommodation, (c) the existing dormer structure to the house main roof along with the conversion of the attic over the integrated garage, (d) the porch structure on the western side of the house, (e) elevation treatment and fenestration changes and (f) position of septic tank and bored well
The development will consist of: (i) The construction of 7 no. wind turbines with the following parameters: a. Total tip height range of 179.5m – 180m, b. Rotor diameter range of 149m – 155m, c. Hub height range of 102.5m to 105m, (ii) Construction of associated foundations, hardstand and assembly areas; (iii) All associated wind farm underground electrical and communications cabling connecting the turbines and mast to the proposed electrical substation; (iv) Construction of 1 no. permanent 38kV electrical substation including a single-story control building with welfare facilities, all associated electrical plant and equipment, security fencing, entrance on to new access road, all associated internal underground cabling, drainage infrastructure, wastewater holding tank, retention separator tank, and all ancillary works, in the townland of Killeagy (Goonan), Co. Clare; (v) A Battery Energy Storage System within the 38kV electrical substation compound; (vi) 1 no. permanent meteorological mast of c. 36.5m in height, associated foundation and hard-standing area in the townland of Shannaknock; (vii) The permanent upgrade of 1 no. existing site entrance off the L7080 (‘The Gap Road’) for the provision of construction and operational access; (viii) Provision of 3 no. new permanent site entrances off the L7080 for the provision of construction and operational access; (ix) Provision of 3 no. new temporary site entrances off the L7080 for the provision of construction access; (x) Upgrade of existing tracks/ roads, including the L7080, and the provision of new site access roads, 4 no. watercourse crossings, junctions and hardstand areas; (xi) 1 no. temporary construction compound with temporary offices and staff facilities in the townland of Killeagy (Goonan); (xii) 1 no. temporary storage area in the townland of Killeagy (Goonan); (xiii) 1 no. borrow pit in the townland of Killeagy (Goonan); (xiv) Peat and Spoil Management; (xv) Tree Felling to accommodate the construction and operation of the proposed development; (xvi) Operational stage site and amenity signage; and (xvii) All ancillary apparatus and site development works above and below ground, including soft and hard landscaping and drainage infrastructure. A 10-year planning permission and 35-year operational life of the wind farm from the date of commissioning of the entire wind farm is sought. A Design Flexibility opinion issued by Clare County Council on 22nd April 2024 accomanies this application. The de
For the construction of a slatted agricultural building with an underground slurry storage tank for housing livestock on the existing farm complex together with all associated ancillary and incidental works
Of garage/store to rear of existing dwelling including ancillary site works
To construct a dwelling house, garage, entrance, wastewater treatment system, and associated site works
To construct a dwelling house, garage, entrance, installation of a wastewater treatment system and associated site works
For the construction of a vehicular entrance, dwelling house, garage, septic tank and percolation area together with all associated site works
For a change of house type and garage type under previously permitting governing permission Planning Reference Number 21/1344 together with all associated site works
To construct a new dwelling house and garage complete with a new entrance, sewage treatment system and ancillary works
Of the development which consists of: a) Alterations to the internal road layout and b) Existing road entrance and c) A change of layout of camping pods and d) A change of camping pod type, all from that previously granted Planning Permission under Planning Reference No. P.16/114. It is proposed to retain the development for an indefinite period.
For the change of house design to comprise of extension to rear to incorporate bathroom, ensuite and redesign of utility and also including minor front elevation changes from that granted under planning permission reference Number 18/374
For demolition of existing dwelling house, construction of a new dwelling house and garage along with all associated works
To construct a new dwelling house and private garage, new entrance and install a new wastewater treatment system along with all associated site works
To construct a new dwelling house, private garage, site entrance, on-site wastewater treatment system and all associated site works and services
For the construction and operation of a concrete batching plant which will produce up to 50,000 m3 of ready-mix concrete annually over an area of circa 1.6 hectares within the southern portion of Bunratty Quarry, in the townland of Bunratty West, Co. Clare. The proposed concrete batching plant will include concrete plant (x 1), 100 tonne storage silos (x 4), 50,000L water tank1 (x 1), 80 tonne storage bins (x10), control cabin, admixture building, conveyor system, washout lagoons, attenuation tank, an access ramp and associated drainage infrastructure including a settlement tank. The proposed development will involve the utilisation of both virgin aggregates and recycled aggregates. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application
For development, the development consists of the construction of a calving / agricultural storage unit and associated site works
To construct a dwelling house, garage, entrance, wastewater treatment system and associated site works
For the Construction of a Dwelling House, wastewater treatment system and new entrance including ancillary site works
To construct a dwelling house, garage, entrance, wastewater treatment system and associated site works
Is sought to construct a 2 storey dwelling house, detached domestic garage, vehicular entrance, effluent treatment system and bored well including all associated site works and services.
To construct a dwelling House, domestic garage, vehicular entrance, effluent treatment system, including all associated site works and services
To construct an extension to rear and side of existing cottage and associated works to include renovation of cottage, installation of a wastewater treatment system and site works
To construct a new dwelling house to include a waste water treatment system, new entrance to dwelling site to include reconfiguration of the existing site entrance, driveway and associated site works
Of a portal frame type shed and all associated development works
To construct a new dwelling house, private garage, site entrance, domestic wastewater treatment system and all associated site works and services
For development which will consist of the construction of a dwelling house, garage, a septic tank with percolation area and ancillary site works
To construct an agricultural slatted shed including all associated siteworks and services
To Extend the Appropriate Period of Planning Permission for P16-575 to construct a dwelling house, entrance, wastewater treatment system and all ancillary site works
To construct a dwelling house and garage, with effluent treatment system, new entrance from public road and all associated site works
To Extend the Appropriate Period of Planning Permission for P15/636 & P20/875 Renovate and extend existing structure on site (an old dwelling house not in active residential use) for residential purposes including the installation of a new waste water treatment system and all ancillary site works (2) Decommission an existing septic tank system (serving an existing occupied dwelling house on site) and replace it with a new wastewater treatment system and all ancillary site works
To erect a dwellinghouse, garage, entrance and install an effluent treatment system and soil polishing filter and all associated site works