(1) FIRST FLOOR ATTIC CONVERSION CONSISTING OF A 2 NO. BEDROOMS TOGETHER WITH 3 NO. DORMERS ON THE SOUTH WEST ELEVATION (2) DOMESTIC GARAGEDecision record indexed
(A) VEHICULAR ACCESS TO THE SOUTH OF EXISTING DWELLING (B) RETAINING WALL STRUCTURE AND RAIN WATER HARVEST TANK TO NORTH OF EXISTING DWELLINGDecision record indexed
CONSTRUCTION OF A VEHICLE ACCESS BRIDGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS. A NATURA IMPACT STATEMENT (NIS) FORMS PART OF THIS APPLICATION.Decision record indexed
(1) DEMOLITION OF THE EXISTING DWELLING HOUSE DUE TO DEFECTIVE CONCRETE BLOCKWORK GRANTED UNDER PLANNING PERMISSION REF. NO. 96/717 AND (2) ERECTION OF A REPLACEMENT DWELLING TO BE CONNECTED TO THE EXISTING PREVIOUSLY APPROVED EFFLUENT TREATMENT SYSTEM, TOGETHER WITH ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
FIRST FLOOR CONVERSION AND FRONT PORCH AND PERMISSION FOR DEMOLITION OF EXISTING DEFECTIVE CONCRETE BLOCK AFFECTED HOUSE AND CONSTRUCTION OF DWELLING HOUSE, CONNECTION TO EXISTING PUBLIC SERVICES ON SITE AND ALL ASSOCIATED SITE WORKSDecision record indexed
(1)DEMOLITION OF EXISTING VACANT HOTEL AND (2) ERECTION OF (A) PRIVATE RESIDENTIAL DWELLING (B) 4 NO. SHORT TERM RENTAL PROPERTIES (C) A CAFÉ (D) ASSOCIATED EXTERNAL PLANT ROOMS, EXTERNAL STORE, GREENHOUSE, STAFF AND CUSTOMER PARKING (3) DECOMMISSIONING OF EXISTING WASTE WATER TREATMENT SYSTEM AND INSTALLATION AND CONNECTION TO NEW WASTE WATER TREATMENT SYSTEM AND (4) ALL ASSOCIATED SITE WORKS ON THE SITE OF THE FORMER POLLAN BEACH HOTEL. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATIONDecision record indexed
REFURBISHMENT OF EXISTING HOUSE TO INCLUDE (1) DEMOLITION OF EXISTING EXTENSION AND CONSTRUCTION OF A SINGLE STOREY EXTENSION, (2) REPLACEMENT OF THE EXISTING SEPTIC TANK WITH A NEW PROPOSED ON-SITE WASTEWATER TREATMENT SYSTEM AND FILTER BED AND (3) PART-DEMOLITION OF EXISTING SHED WITH GENERAL ALTERATIONS AND ALL ANCILLARY DEVELOPMENT AND ASSOCIATED SITE WORKSDecision record indexed
(1) DEMOLITION OF EXISTING DWELLING AND DETACHED SHED (2) DECOMMISSIONING OF EXISTING SEPTIC TANK AND (3) ERECTION OF A REPLACEMENT 2-STOREY DWELLING WITH WASTEWATER TREATMENT SYSTEM & PERCOLATION AREA, DETACHED GARAGE, CONNECTION TO PUBLIC SERVICES AND ALL ASSOCIATED WORKSDecision record indexed
(1) DEMOLITION OF EXISTING DWELLING AND DETACHED SHED (2) DECOMMISSIONING OF EXISTING SEPTIC TANK AND (3) ERECTION OF A REPLACEMENT 1½-STOREY DWELLING WITH WASTEWATER TREATMENT SYSTEM & PERCOLATION AREA, DETACHED GARAGE, CONNECTION TO PUBLIC SERVICES AND ALL ASSOCIATED WORKS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION.Decision record indexed
(1) DEMOLITION OF (A) 4 NO. EXISTING PARTIALLY COMPLETED DWELLINGS AND (B) FOUNDATIONS AND SUBFLOOR FOR 7 NO. UNCOMPLETED DWELLINGS PREVIOUSLY GRANTED UNDER PLANNING REF. NO. 07/70890 AND (2) ERECTION OF 33 NO. DWELLINGS WITH WASTE WATER TREATMENT SYSTEM, CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED SITE WORKSDecision record indexed
CONSTRUCTION OF A NEW DWELLING HOUSE, TOGETHER WITH CONNECTION TO EXISTING PUBLIC SERVICES AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
(1) DEMOLITION OF EXISTING SINGLE STOREY DILAPIDATED COTTAGE AND ASSOCIATED SMALL REAR GARDEN SHED (2) CONSTRUCTION OF A REPLACEMENT COTTAGE STYLE DWELLING INCORPORATING 2 NO. FIRST FLOOR ATTIC BEDROOMS AND W.C FACILITIESDecision record indexed
ERECTION OF AN EXTENSION TO THE REAR OF THE EXISTING CEREMONY BUILDING AND THE CHANGE OF USE OF 2 NO. STORES TO CIVIL CEREMONY SPACE, CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED WORKSDecision record indexed
CONSTRUCTION OF A SINGLE STOREY DWELLING, INSTALLATION OF A DOMESTIC TREATMENT PLANT, USE OF EXISTING ENTRANCE TO FAMILY HOME AND ALL NECESSARY SITE WORKSDecision record indexed
(1) DEMOLITION OF EXISTING DETACHED TWO STOREY DWELLING HOUSE, DAMAGED DUE TO DEFECTIVE (MICA) PRECAST CONCRETE BLOCKS AND (2) CONSTRUCTION OF (A) A NEW REPLACEMENT DETACHED TWO STOREY DWELLING AND (B) A NEW DETACHED DOMESTIC GARAGE, WITH ALL EXISTING ASSOCIATED SITE SERVICES TO BE RETAINED AND RE-USED FOR THE PROPOSED REPLACEMENT DWELLINGDecision record indexed
(1) CHANGE OF USE FROM RETAIL UNIT TO A DOMESTIC DWELLING, (2) NEW ROOF AND ALTERATIONS TO ELEVATIONS AND (3) CONNECTION TO ALL EXISTING SERVICES AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
(1) ELEVATIONAL ALTERATIONS, (2) INCREASED ROOF PITCH AND (3) FIRST FLOOR WITH CONNECTION TO ALL EXISTING SERVICES AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
DEMOLITION OF EXISTING DWELLING DUE TO DEFECTIVE MICA BLOCKWORK AND THE ERECTION OF A REPLACEMENT DWELLING WITH CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
(1) DEMOLITION OF THE EXISTING DWELLING HOUSE DUE TO DEFECTIVE CONCRETE BLOCKWORK GRANTED UNDER PLANNING PERMISSION REF: 99/2697, (2) ERECTION OF A REPLACEMENT DWELLING WITH NEW EXTENSION TO THE SIDE OF THE REBUILT HOUSE, RECONNECTION TO THE EXISTING PUBLIC SERVICES AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
CONSTRUCTION OF A NEW SINGLE STOREY DETACHED DWELLING, PROPOSED NEW WASTEWATER TREATMENT PLANT AND PERCOLATION AREA, TOGETHER WITH ASSOCIATED SITEWORKS AND CONNECTION TO EXISTING SERVICES. A NATURA IMPACT ASSESSMEMT (NIS) ACCOMPANIES THIS APPLICATIONGrounds not yet categorised
(1) DEMOLITION OF AN EXISTING DETACHED MICA-AFFECTED 1 1/2 STOREY DWELLING AND (2) CONSTRUCTION OF A NEW DETACHED 2 STOREY REPLACEMENT DWELLING ALONG WITH CONNECTION TO EXISTING SERVICESDecision record indexed
ERECTION OF A DWELLING WITH WASTE WATER TREATMENT SYSTEM AND PERCOLATION AREA, CONNECTION TO EXISTING PUBLIC SERVICES AND ALL ASSOCIATED WORKS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATIONGrounds not yet categorised
INCREASING THE ROOF PITCH OF EXISTING DWELLING AND CONVERSION OF EXISTING GARAGE TO A LIVING ROOM AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
CONSTRUCTION OF A NEW DETACHED 1 1/2 STOREY DWELLING, NEW DETACHED GARAGE, A NEW VEHICULAR ENTRANCE ALONG WITH CONNECTION TO EXISTING SERVICESDecision record indexed
ERECTION OF A DWELLING WITH WASTEWATER TREATMENT SYSTEM AND PERCOLATION AREA, CONNECTION TO EXISTING PUBLIC SERVICES AND ALL ASSOCIATED WORKS. A NATURA IMPACT STATEMENT ACCOMPANIES THIS APPLICATIONGrounds not yet categorised
(1) DEMOLITION OF EXISTING MICA DEFECTED DWELLING HOUSE AND (2) CONSTRUCTION OF A NEW REPLACEMENT DWELLING WITH CONNECTION TO ALL EXISTING SERVICES ALONG WITH ALL ASSOCIATED SITE WORKS ON SITEDecision record indexed
(A) PARTIAL DEMOLITION OF AN EXISTING OUTBUILDING AND INSTALLATION OF A NEW CONTAINERISED BIOMASS PLANT ROOM AND FUEL STORE (B) INSTALLATION OF PV ARRAY WITH SUPPORT FRAMING TOGETHER WITH AN ACCESS ROAD TO FACILITATE MAINTENANCE CONNECTED TO AN EXISTING GATE ON THE WESTERN BOUNDARY AND ASSOCIATED SITE WORKSDecision record indexed
DEMOLITION OF 1½ STOREY DETACHED DWELLING WITH DEFECTIVE CONCRETE BLOCKWORK AND CONSTRUCTION OF A NEW REPLACEMENT 2 STOREY DETACHED DWELLING AND SINGLE STOREY DETACHED GARAGE WITH CONNECTION OF WASTEWATER INTO EXISTING ON-SITE PUBLIC SEWER TOGETHER WITH ASSOCIATED SITEWORKSDecision record indexed
(1) DEMOLITION OF THE EXISTING, DETACHED, DORMER BUNGALOW DWELLING HOUSE DAMAGED DUE TO DEFECTIVE (MICA) PRECAST CONCRETE BLOCKS, (2) RECONSTRUCTION OF A REPLACEMENT DETACHED 1.5 STOREY DWELLING HOUSE WITH ALTERATIONS FROM THAT OF THE EXISTING DWELLING HOUSE, (3) CONSTRUCTION OF A NEW, DETACHED DOMESTIC GARAGE. THE RELEVANT ASSOCIATED REPLACEMENT WORKS WILL BE CONNECTED TO THE EXISTING SITE SERVICESDecision record indexed
(1) DEMOLITION AND REMOVAL OF EXISTING SINGLE-STOREY EXTENSION AND BOILER HOUSE TO REAR (SOUTH) OF HOUSE, (2) PROVISION OF A TWO-STOREY EXTENSION TO WEST SIDE OF EXISTING HOUSE, (3) DECOMMISSIONING OF EXISTING SEPTIC TANK AND PROVISION OF NEW EFFLUENT TREATMENT SYSTEM/PERCOLATION AREA, AND (4) ALL ASSOCIATED SITE WORKS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATIONDecision record indexed
(1) DEMOLITION OF EXISTING UNFINISHED DWELLING (2) ERECTION OF A DWELLING AND DETACHED GARAGE WITH WASTEWATER TREATMENT SYSTEM AND PERCOLATION AREA, CONNECTION TO EXISTING PUBLIC SERVICES AND ALL ASSOCIATED WORKSDecision record indexed
PORCH & SHED EXTENSION BUILT ONTO EXISTING DWELLING HOUSE TOGETHER WITH REPLACEMENT HIGHER PITCHED ROOF AND ALL ASSOCIATED WORKSDecision record indexed
ERECTION OF AN EXTENSION TO EXISTING COTTAGE INCLUDING REVISED LAYOUT ON THE GROUND FLOOR, RAISING THE ROOF LEVEL OF EXISTING ROOF TO FACILITATE THREE BEDROOMS AND A SHOWER ROOM TO THE FIRST FLOOR, ALL CONNECTED TO THE EXISTING SEPTIC TANK, TOGETHER WITH A NEW CONNECTION TO MAINS WATER SUPPLY AND ALL ASSOCIATED SITEWORKSDecision record indexed