Replace existing unauthorised log cabin with Family Farm house, garage and waste water effluent treatment unit to current EPA standards, bored well and pump house and all associated site works.Decision record indexed
Short term retention of unauthorised log cabin to allow for family farmhouse, garage and waste water effluent treatment unit to current EPA standards, bored well and pump house and all associated site works. To be completed. Granted under PP 21/346Grounds not yet categorised
Construction of dwelling (183sqm), installation of sewage treatment facility and percolation area and all ancillary works and landscapingDecision record indexed
(i) first floor extension to existing single storey weighbridge office (ii) above ground fire water storage tank to serve this building and development permitted under PPR 19/54 (iii) omission of office building permitted under PPR 19/54 and all associated site works3 conditions indexed
Single storey extension to building no. 1 (728 m2) and 2 no. battery storage kiosks and 2 no. invertors to northern façade of building no. 1, removal of ground mounted solar panels and construction of detached single storey building (120m2) to the south of building no. 1. single storey extension to building no. 2 of (152 m2) and all associated site development worksDecision record indexed
Sunroom and utility extension, retention of garage as constructed from that previously granted under Planning Reg No 95/2573 and retention of fuel / machinery storeDecision record indexed
For works to existing dwelling house including the following: 1) Construction of a two storey extension to the front of existing dwelling house. 2) Demolition of existing porch and construction of a new porch to the front of existing dwelling house 3) demolition of existing extensions to the rear of existing dwelling house. 4) construction of a new single storey extension to the rear of existing dwelling house along with all associated site worksDecision record indexed
An amendment to Block 1 permitted under PPR 19/54 consisting of a single storey extension (281sqm) and all associated site worksDecision record indexed
Demolition of existing cottage and reconstruction of the replacement cottage on the same footprint as existing cottage with traditional finishes as per existing cottage, new waste water treatment system to EPA standards and associated worksDecision record indexed
(i) lean to extension (283sqm.) to existing building permitted under PRR 98/9110 and (ii) portacabin building for use as site office in connection with the applicants agricultural contracting businessDecision record indexed
Construction of a bungalow with garage, new entrance and driveway and a new effluent treatment system to current EPA standards and all ancillary site worksDecision record indexed
Detached storage shed no. 1 (388.50m2), detached tool / battery shed no. 2 (38.9m2), 2 no. sprinkler tanks and pump house (13.95m2) located north of building no. 1. Retention sought for detached storage shed no. 3 (224.60m2) located north of building no. 2 and all associated worksDecision record indexed
1. The conversion /extension of the existing bungalow to a dormer /one and a half storey dwelling by increasing the roof height. 2. Alterations to all elevations. 3. Removal of existing septic tank and installation of new treatment unit and soil polishing filter to current standards and all ancillary site worksDecision record indexed
Demolition of existing chimney on existing dwelling, construction of new rear extension which can be seen from the front of the dwelling, removal of existing septic tank, new wastewater treatment unit & soil polishing filter and associate worksDecision record indexed
Erect a 2m2 ground floor extension to the main entrance and a 48m2 first floor dormer extension to the existing 130m2 dwelling with alterations and revisions to the elevations along with all associated site development worksDecision record indexed
Proposal to replace existing unauthorised log cabin with farm house, garage & waste water effluent treatment unit to current EPA standards, bored well and pump house and all associated site works
Dwelling house with domestic garage, new septic tank and percolation area to current EPA standards, connection to public water mains and new site entrance along with all ancillary site worksGrounds not yet categorised
For the construction of a bungalow with garage, new entrance off existing laneway and a new treatment system and percolation area to current EPA standards and all ancillary site worksDecision record indexed