To construct a new dormer style dwelling house with detached domestic garage, form new vehicular site entrance onto public roadway, installation of approved proprietary wastewater treatment system & percolation area, together with all associated site development works
For demolition of existing front porch and rear return, Construction of a new single storey rear& side extension, alterations to existing elevations and façade, Construction of a new domestic garage/storage shed, Installation of a new wastewater treatment system and percolation area, extension to property curtilage & all associated site works
For retention permission for (1) Retention of detached domestic garage (2) Retention of single storey extension to side of existing dwelling and (3) alterations to site layout and all ancillary works
For development consisting of the installation of an 18 metre monopole carrying antennas, dishes, associated equipment, together with ground-based equipment cabinets, access track, fencing and all associated site develpment works for wireless data and broadband services
To erect fully serviced two storey dwelling with detached domestic garage, entrance, sewerage treatment facilities & all ancillary works
To erect fully serviced two storey dwelling with detached domestic garage, entrance, sewerage treatment facilities & all ancillary works
For (1) the construction of an agricultural slatted shed to incorporate slatted area, external feed passage and underground slurry storage tank, (2) Completion of all associated structures and ancillary site works
To demolish boiler house & derelict building and erect a two storey extension to the side and a single storey extension to the rear of existing two storey dwelling, elevational changes to existing dwelling, retain two storey extension to rear of dwelling, treatment plant, percolation area, relocate vehicular entrance and all associated site works
Dwelling house, garage / outbuilding, effluent treatment system, percolation area and all ancillary works and services
To (1) construct detached dwelling (2) construct detached domestic garage (3) incorporate new wastewater treatment system and percolation area
To renovate, extend and remodel existing derelict cottage and erect detached domestic garage with carport. Works to include forming new site entrance, install sewerage treatment facilities, and all ancillary site works. Significant further information and revised plans have been received
To change plans of previously approved proposal to renovate, extend and remodel an existing cottage (PL. Reg: 19/326 relates). Proposals now include erection of a storey and a half style extension to side of existing cottage, associated alterations to elevations and all ancillary siteworks
For development consisting of dwelling house, garage/outbuilding, effluent treatment system, percolation area and all ancillary works and services
To partially demolish and extend existing manufacturing unit, alterations to elevations, site layout and boundaries, new vehicular access point, additional carparking and all ancillary works
For the erection of a part two storey/part single storey dwelling, detached domestic garage, new site entrance, wastewater treatment system, percolation area and all ancillary site works- SIGNIFICANT FURTHER INFORMATION HAS BEEN RECEIVED
For (1) construction of a single storey extension to end elevation of existing single storey type dwelling to incorporate additional living accommodation, (2) Completion of all ancillary and associated site works
To 1. Construct extension to existing dwelling. 2. Carry out alterations and remodelling of existing dwelling. 3. Carry out associated site works to enable completion of project
For the construction of a storey and a half extension to the front of the existing bungalow dwelling, and internal alterations to the existing dwelling layout and all ancillary site works. SIGNIFICANT FURTHER INFORMATION HAS BEEN RECEIVED
Retain alterations to house plans and complete works to substantially completed dwelling (previous reg 07/856 relates)
To erect a storey and half style domestic garage and a machinery shed
To 1: Retain a single storey pantry extension to side of existing dwelling and 2: To retain and complete the partially constructed new entrance and access route to the previously approved machinery shed to rear of property (Pl Reg. 22/309 – not yet commenced relates), including the amended access route layout
Construct new single storey dwelling house, form new vehicular site entrance and installation of approved proprietary wastewater treatment system and percolation area together with all associated site development works
For construction of a dormer type dwelling, domestic garage, formation of new site entrance onto public road, installation of proprietary wastewater treatment unit and percolation area and completion of all ancillary site works
To erect fully serviced fishing log cabin and toilet facilities with all associated site works. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with this application
For (1) RETENTION Permission for as constructed alterations to unfinished dwelling house to include additional basement level comprising of domestic garage (previous approval granted under 04/2257); and (2) Planning PERMISSION to complete unfinished dwelling house and associated site development works including site entrance works, and installation of approved proprietary wastewater treatment system & percolation area
To erect a fully serviced part two storey, part storey and a half dwelling, entrance, boundary walls and piers, waste water treatment facilities, detached domestic garage and all ancillary works
To retain domestic garage & container and associated works
To construct extension to existing domestic garage
A single 1.5 storey dwelling & a septic tank,waste water treatment unit & percolation area
To carry out alterations and extension to existing two storey dwelling. Proposal to include erection of single storey extension(s) to side, rear and first floor of the existing dwelling and retain site clearance works and reposition of site entrance. Works to include raising of ridge height and associated alterations to elevations and all ancillary site works
For development consisting of: A 10 year permission for the construction of an energy storage system comprising (i) a single storey control building and associated compound area with palisade fencing to an overall height of up to 2.95m; (ii) containerised energy storage modules placed on concrete plinth foundations; (iii) electrical transformer and inverter modules; (iv) heating, ventilation and air conditioning units; (v) site access tracks; (vi) underground electrical and telecommunications cabling; (vii) CCTV security monitoring system; (viii) all ancillary electrical and communications equipment; and (ix) all associated site development, drainage and reinstatement works. This planning application is also accompanied by an Appropriate Assessment Screening Report
For the erection of a part two story/part single storey farm dwelling with attached carport, site entrance, wastewater treatment system, percolation area and all ancillary site works
For: i) Works to facilitate infill and re-contouring of the subject lands to facilitate use for agricultural purposes. ii) will require a waste facility permit and / or article 27 approval from EPA. iii) All associated works and services. The application is accompnanied by a Natura Impact Statement (NIS)
To erect domestic garage/store & all associated works, significant further information and revised plans have been submitted
For the restoration of an existing quarry to agricultural land. The quarry will be infilled with inert soil and stone, recontoured with top soil and reseed. It is estimated that approximately 110,000 tonne of inert soil and stone will be imported from local green field sites over a five-year period. To include the installation of a temporary wheel wash and all ancillary site works
For 1) the construction of a dormer style extension to the rear of the existing dwelling, partially incorporating a car port, 2) RETENTION of the existing domestic storage shed, and 3) all ancillary site development works
To demolish existing attached single storey garage to the side of existing bungalow and replace with a dependent relative accommodation, also construct an extension to the opposite side and rear, alterations and elevational changes to existing dwelling, domestic garage, permission to upgrade sewerage treatment system and percolation drains and all associated site works
For upgrades to the existing Crossdoney Water Treatment Plant. The development will consist of the following works within the existing water treatment plant site: construction of a new water clarification process tank, construction of a below ground pumping chamber, modifications to below-ground pipework and associated ancillary site works. A Natura Impact Statement will be submitted to the Planning Authority with the application
To make alterations to the approved floor plan & elevations (previously approved under planning ref. no. 22-297) together with all associated site works
To (1) construct a new single storey extension to side of existing dwelling house, (2) construct new front porch, and (3) upgrade existing on-site wastewater treatment system
To erect new dwelling house, domestic garage, entrance, boundary walls, piers with sewerage treatment system & percolation area (prev. planning ref. no. 19/20)
For a 20-year permission for quarrying and extraction of rock that will include drilling, blasting, crushing and screening along with alterations to boundaries & all associated site works. Works will also include for the provision of new settlement ponds and installation of associated site drainage infrastructure and surface water pump to proposed new settlement ponds along with provision of discharge outlet via a Klargester Interceptor. Ancillary site works to include for landscape works, planting restoration of the quarry perimeter and reprofiling of overburden as required to facilitate development of the quarry and restoration of the associated site area. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared and accompanies this application, significant further information has been received
Construct a four bay shed which will consist of slatted area with slurry holding tank underneath, cubicles and all associated site works
For the erection of fully serviced two storey dwelling with detached domestic garage, entrance, sewerage treatment facilities & all ancillary works. The proposed dwelling will be in lieu of two storey dwelling & garage & all ancillary works approved under Pl. Ref. 21/570
To construct a four bay slatted shed with slurry holding tank underneath and all associated site works
Change of use of dry store shed on the existing farm to brewery with accompanying internal fit out to accommodate same, with new sewage treatment system and all associated ancillary site works
To erect single storey extensions to front and side of existing dwelling, associated alterations to floor plans and elevations, connection to existing services, site development works to reduce ground levels, new sewerage treatment facilities & all ancillary works
Erect fully serviced two storey dwelling with detached domestic garage, entrance, sewerage treatment facilities and all ancillary works
To complete extraction of material granted within existing quarry envelope as per previously approved planning (Ref No. 051801) for a 10 year lifespan of the quarry & all associated site works. Significant further information and revised plans have been submitted which includes the submission of an Environmental Impact Assessment Report (EIAR)
To extend existing quarrying facility on a site of c 10.25 hectares (existing quarry permitted under Cavan County Council Reg. Ref. 051801, 1162 and Quarry Registration No. QY7). The development will consist of the inclusion of an additional extraction of 1.04 hectares to the southeast boundary. The quarry extension is sought to a maximum depth of c. 40 metres od and will be extracted at a rate of c. 50,000 tonnes per annum. The proposed development includes all ancillary site development, areas of stockpiling, landscaping and boundary treatment works above and below ground, including the progressive restoration of the site. An Environmental Impact Assessment Report (EIAR) will be submitted to the planning authority with the application. Significant further information and revised plans have been submitted