THE ERECTION OF SOLAR POWERED LIGHTING STANDARDS ON THE COMMUNITY WALKWAY, WHICH IS LOCATED ADJACENT TO THE PERIMETRE OF KILLURIN GAA PITCHDecision record indexed
CONSTRUCTION OF PROPOSED SINGLE STOREY EXTENSION TO THE WEST ELEVATION OF AN EXISTING HOUSE, AND PERMISSION TO REMOVE EXISTING BOUNDARY HEDGE AND BUILD NEW BOUNDARY WALL TO THE WEST AND NORTH SITE BOUNDARY, AND ALL ANCILLARY SITE WORKSDecision record indexed
DEMOLITION OF AN EXISTING GARAGE AND STORAGE SHED AND THE CONSTRUCTION OF A NEW GARAGE AND STORAGE SHED WITH ALL ASSOCIATED SITE WORKSDecision record indexed
(RED III) the installation of a heat pump and a 2000l LPG tank as part of school decarbonisation project under a Renewable Energy Directive III (RED III) DevelopmentDecision record indexed
The construction of a solar PV development with an installed capacity of up to 2.6 MWdc (MEC=0) to provide electrical power to the existing distillery comprising approximately 4,100 no. photovoltaic panels on ground mounted frames within a site area of 3.90 hectares and associated ancillary development including 1 no. transformer station, 5 no. CCTV security cameras mounted on 8 metre high poles, perimeter security fencing (2.4 metres high), internal access tracks, extension to existing maintenance access track on the site to the solar PV development, installation of underground cable to connect the transformer station and the distillery and site works required to facilitate the development including the provision of a secondary vehicle access and gate on the northern boundary of the site. The proposed development is for modifications to an establishment to which the major accidents directive applies and is for the purposes of an activity requiring an integrated pollution prevention and control licenceDecision record indexed
Construction of a two-storey extension to the rear of the existing dwelling, additional rooflights, window and door opes, all internal modifications and associated site worksDecision record indexed
CENTRAL BUSINESS PARK SPOLLANSTOWN CLONMINCH ROAD, TULLAMORE, CO. OFFALY.
THE CONSTRUCTION OF A PROPOSED THREE-STOREY OFFICE BUILDING INCLUDING A PROPOSED ENTRANCE, CARPARKING, LANDSCAPING AND ALL ASSOCIATED SITE WORKSDecision record indexed
ST. CIARAN'S NATIONAL SCHOOL, BOHER BALLYCUMBER, CO OFFALY
THE CONSTRUCTION OF PROPOSED SET DOWN AREA AND STAFF PARKING INCLUDING WIDENING OF EXISTING SITE ENTRANCE, HARD SURFACE PLAY AREA AND PROPOSED OFFICE EXTENSION WITHIN EXISTING COURTYARD AND ALL ASSOCIATED SITE WORKS AND SERVICESDecision record indexed
MILKING PARLOUR, DAIRY, FARM OFFICE AND CATTLE HANDLING AREA AS CONSTURCTED AND PERMISSION TO CONSTRUCT A SLATTED CUBICLE SHED WITH UNDERGROUND SLATTED SLURRY STORAGE, NEW SILAGE SLAB AND ASSOCIATED SITE WORKSDecision record indexed
CONVERSION OF ATTIC TO LIVING ACCOMMODATION, FITTING OF ROOF WINDOWS AND GABLE WINDOW AT DORMER FLOOR LEVEL AND ALTERATIONS TO FAÇADEDecision record indexed
THE EXISTING EXTENSION TO THE FRONT, SIDE AND REAR OF EXISTING HOUSE AND RETENTION OF THE GARAGE OUTBUILDING WITH PLANNING PERMISSION FOR A NEW BAY WINDOW TO THE SIDE OF EXISTING HOUSEDecision record indexed
DEMOLITION OF EXISTING DWELLING HOUSE AND BUILD NEW DWELLING HOUSE, INSTALL SEPTIC TANK WITH PERCOLATION AREA AND ALL ANCILLARY SITE WORKS. THIS DEVELOPMENT IS WITHIN THE CURTILAGE OF A PROTECTED STRUCTURE LISTED UNDER THE RECORD OF PROTECTED STRUCTURES IN THE OFFALY COUNTY COUNCIL DEVELOPMENT PLAN (REF. NO. 11-004)Decision record indexed
A PROPOSED NEW DWELLING, DRIVEWAY, NEW BOREWELL, PACKAGED WASTEWATER TREATMENT SYSTEM WITH POLISHING FILTER, STORMWATER SOAKAWAYS AND ALL ASSOCIATED SITE WORKS AND LANDSCAPINGDecision record indexed
CONSTRUCTION OF ALTERATIONS/ IMPROVEMENT WORKS TO EXISTING HOUSE AND CONSTRUCTION OF NEW HIP ROOF (TO REPLACE FLAT ROOF). THE DEVELOPMENT ALSO CONSISTS OF RETENTION OF EXISTING SOLAR PANELS TO SOUTH ELEVATIONDecision record indexed
CONSTRUCTION OF A NEW FARM BUILDING FOR THE HOUSING OF LIVESTOCK INCLUDING A SLATTED AREA OVER AN UNDERGROUND EFFLUENT STORAGE TANK AND RETENTION PERMISSION OF FARM BUILDING AS CONSTRUCTED FOR THE HOUSING OF LIVESTOCK; ALL COMPLETED WITH ASSOCIATED SITEWORKS AND FOR THE PURPOSES OF AGRICULTUREDecision record indexed
THE MEWS, TO THE REAR OF VIOLET COTTAGE, CLONMINCH ROAD TULLAMORE
OF STRUCTURE AS BUILT TO DATE AND PERMISSION FOR COMPLETION INCLUDING CONVERSION OF SAME TO A STOREY AND A HALF DWELLING HOUSE, AMENDMENTS TO ELEVATIONS, PROVISION OF PRIVATE OPEN SPACE, CONNECTION TO SERVICES AND ALL ASSOCIATED SITE WORKSGrounds not yet categorised
THE MEWS TO THE REAR OF VOILET COTTAGECLONMINCH ROAD, TULLAMORE, CO. OFFALY
STRUCTURE AS BUILT TO DATE, AND PERMISSION FOR COMPLETION INCLUDING CONVERSION OF SAME TO A FOUR-BEDROOM DWELLING HOUSE, AMENDMENTS TO ELEVATIONS, CONNECTION TO SERVICES AND ALL ASSOCIATED SITE WORKSGrounds not yet categorised
A COMPOUND CONTAINING 2 NO. ENERGY STORAGE CONTAINERS WITH A CAPACITY OF UP TO 10MW AND ASSOCIATED TRANSFORMERS, INVERTERS, A SWITCHROOM BUILDING OF APPROXIMATELY 88M2 (CONTAINING SWITCH AND CONTROL ROOMS), INTERNAL CABLING, ELECTRICAL AND COMMUNICATIONS CABLES OF APPROXIMATELY 45M BETWEEN THE CONTROL BUILDING AND THE ADJACENT ESB 38KV CLONMINCH SUBSTATION AND ALL ANCILLARY DEVELOPMENTDecision record indexed
CONSTRUCTION OF A NEW DWELLING HOUSE, GARAGE, SITE ENTRANCE, WASTE WATER TREATMENT SYSTEM WITH POLISHING FILTER, BORED WELL AND ALL ASSOCIATED SITE WORKS AND SERVICESDecision record indexed
48 ST. COLOMBAS PLACE, CLONMINCH, TULLAMORE CO. OFFALY
SUB DIVIDE EXISTING SITE AND TO EXTEND EXISTING TERRACE BLOCK BY CONSTRUCTING ONE NUMBER ATTACHED, 4 BEDROOM TWO STOREY DWELLING, PERMISSION IS ALSO SOUGHT TO RELOCATE EXISTING ENTRANCE AND TO CREATE A NEW ENTRANCE TO PUBLIC ROAD, TO ALTER EXISTING SITE BOUNDARYS, TO CONNECT TO PUBLIC SEWERS AND WATERMAIN AND OTHER PUBLIC SERVICES AND ALL ASSOCIATED SITE WORKSGrounds not yet categorised
ESB TELECOM'S COMPOUND AT ESB'S CLONMINCH 38KV SUBSTATION, CLONMINCH LANE TOWNLAND OF CLONMINCH, TULLAMORE CO. OFFALY
THE REPLACEMENT OF THE EXISTING 16M HIGH WOOD POLE WITH A PROPOSED 24 METRE HIGH LATTICE TELECOMMUNICATIONS STRUCTURE WITH ANTENNAE, DISHES AND ASSOCIATED EQUIPMENT AND GROUNDWORKS. ACCESS VIA EXISTING SUBSTATION ENTRANCEDecision record indexed
A NEW EXTENSION TO FRONT ELEVATION AND ALTERATIONS TO EXISTING DWELLING HOUSE INCLUDING RAISING EXISTING ROOF LEVEL TO INCORPORATE A NEW FIRST FLOOR LIVING SPACEDecision record indexed
50NO. TWO-STOREY DWELLINGS COMPRISING 2NO. 4-BEDROOM SEMI-DETACHED HOUSES, 16NO. 3-BEDROOM SEMI-DETACHED HOUSES AND 8NO. BLOCKS OF TERRACED HOUSES CONTAINING 4NO. 4-BEDROOM HOUSES, 15NO. 3-BEDROOM HOUSES AND 13NO. 2-BEDROOM HOUSES. THE DEVELOPMENT ALSO CONSISTS OF THE PROVISION OF 2NO. CAR PARKING SPACES PER DWELLING, VISITOR PARKING, LANDSCAPING WORKS, PUBLIC LIGHTING, SURFACE WATER DRAINAGE AND ATTENUATION WORKS, FOUL SEWERAGE NETWORK AND FOUL PUMPING STATION AND ALL ANCILLARY SITE DEVELOPMENT WORKS IN ORDER TO CATER FOR THE DEVELOPMENTGrounds not yet categorised
CONSTRUCTION OF A NEW FOUR BEDROOM DWELLING HOUSE, NEW EFFLUENT TREATMENT SYSTEM, NEW GARAGE, NEW VEHICULAR ENTRANCE AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
CONSTRUCTION OF A FOUR BEDROOM DWELLING WITH GARAGE. THE APPLICATION WILL ALSO INCLUDE A NEW TREATMENT UNIT WITH PERCOLATION AREA, NEW ENTRANCE AND ALL ASSOCIATED SITE-WORKS AND DRAINAGEDecision record indexed
To retrofit, extend and alter existing dwelling, new front gate, connect into all onsite existing services and all associated site works.Decision record indexed
ON THE GRANT OF OUTLINE PERMISSION REF. NO. PL2/20/326 FOR THE DEVELOPMENT OF TWO NO. TWO STOREY HOUSES, ALL ANCILLARY SERVICES AND WORKSDecision record indexed
Retention of dwelling house with revised site layout, house previously granted under 17/258 and EX/22012 incorporating altered position of house on site and permission to complete dwelling house, and all associated site works.Decision record indexed
A PROPOSED NEW SINGLE STOREY DWELLING, GARAGE, DRIVEWAY, NEW CONNECTION TO LOCAL AUTHORITIES' PUBLIC WATER MAIN, NEW VEHICULAR ENTRANCE, WASTEWATER TREATMENT SYSTEM WITH PERCOLATION AREA, STORMWATER SOAKAWAYS AND ALL ASSOCIATED SITE WORKS & LANDSCAPINGDecision record indexed