The demolition of the existing single storey lean-to kitchen side extension and the replacement thereof with a single storey gabled kitchen side extension 31.3sqm, 5.3sqm bootroom, a new dining room rear extension 43.6sqm with patio and all associated external works and landscapingDecision record indexed
Construct a single storey dwelling, single storey garage, septic tank & percolation area, new bored well, domestic entrance & all associated site worksDecision record indexed
Refurbishment of an existing cottage and former forge, demolition of adjoining outbuildings, construction of a new extension linked to the existing cottage, associated site works, construction of a new septic tank and percolation area and new entrance from the public road10 conditions indexed
Construction of a 24m multi-user monopole telecommunications support structure, carrying antenna and dishes enclosed within a 2.4 metre high palisade fence compound together with associated ground equipment cabinets and associated site works including new access track on lands at Kilqueeny, Avoca, Co. Wicklow. The installation with form part of eir Mobile telecommunications network5 conditions indexed
Rooster Park Community Field, Castlemacadam, Avoca
Installation of a walking track with public lighting around the perimeter of the community field encompassing the GAA and soccer pitches (approx. 620m). The track shall be elevated on the easterly side where Irish Rail have erected a boundary fence. This area shall be protected with a handrail/fence so it can be used as a viewing and amenity area for games and accessed one end by a ramped area and the other end by steps and associated site worksDecision record indexed
The importation of material to in-fill and re-contour the subject site. Once the importation is complete, the applicant will seed the land in line with Teagasc guidelines and return it to agricultural use. The Operational Phase will see the Site being used as agricultural pastureland. The applicant proposes, subject to planning, to import clean greenfield soil and stone to remediate approximately 2.43ha of the total site. The 2.43ha. is divided into 3 distinct phases - Phase 1 is 0.78ha, Phase 2 is 0.77ha and Phase 3 is 0.88ha. A fill plan has been drawn up for the importation of 18,200tonnes to fill Phase 1, 23,085tonnes to fill Phase 2, and 42,721tonnes to fill Phase 3, equating to a total of 84,006tonnes of soil and stone. Permission is being sought for a 5-year period and will be subject to a waste facility permitGrounds not yet categorised