For the construction of a new single storey dwelling house with site access via the Glen, Faithlegg, Co Waterford; together with new bored well, new waste water treatment system and percolation area, together with all ancillary and associated site works at theGrounds not yet categorised
For a) construction of a milking parlour, dairy and ancillary rooms, b) construction of a roofed waiing yard and drafting and handling facility and associated underground slatted soiled water tank and slatted slurry tank, c) erection of meal bins, water storage tank and external milk silo, d) construction of a straw bedding shed, e) construction of a calf shed and f) construction of an underground slurry tank and all other associated site works (this proposed development is within the curtilage of a protected structure) atDecision record indexed
For development of cubicle/slatted shed, concrete apron and associated site works necessary to facilitate the proposed developmentDecision record indexed
Development from townland of Marshmeadows, New Ross, Co. Wexford to townland of Raheen, Rosbercon, Co. Kilkenny. The project passes under the River Barrow across the county boundaries of Wexford and Kilkenny. The development consists of (1) Medium Voltage (MV) electricity system improvement by the installation of a new 20kV electricity underground cable (UGC) by means horizontal directional drilling (HDD) under the River Barrow to connect the Lake Region circuit at Marshmeadows, County Wexford to the Beechgrove circuit at Raheen, Rosbercon, County Kilkenny. From end to end the UGC measures approximately 580m. The majority of the circuit, approximately 365m will be installed by HDD under the River Barrow. The remainder of the circuit, approximately 215m will be a UGC installed by traditional trenching and ducting means. Approximately 355m of this UGC will be installed within County Wexford and the remaining 225m will be installed within County Kilkenny. (2) A second "spare" duct will be installed within the HDD to enable a second circuit to be installed at a future date to further enhance and future proof the network. (3) Permission is sought for all associated works including temporary works required. Planning permission is sought for a ten (10)year period. A Natura Impact Statement (NIS) has been prepared and will be submitted to the planning authority with the applicationDecision record indexed
The indefinite retention of 2 no. South facing velux windows to front of existing dwelling, and the indefinite retention of single storey garageDecision record indexed
For proposed new part two storey and part single storey dwelling house with detached garage, including new on site proprietary wastewater treatment system and new vehicular entrance with all associated groundworks and landscaping. To include alterations to existing road width and junction adjacent to site atDecision record indexed
The construction of a new storey and a half dwelling house, new double garage area, new bored well, new waste water treatment system and percolation area, together with all ancillary and associated site worksDecision record indexed