Retention permission for existing first floor rear extension to existing two storey semi-detached house, retention of ground floor door as constructed (for access to rear garden) and all associated site works.
Retention for existing front single storey porch to dwelling.
Demolition of existing single storey garage and construction of a one bedroom and study/storage room, two storey dwelling to side of existing dwelling; two new modified vehicular entrances with block pillars and timber gates proposed to front garden to provide parking space for existing dwelling and new proposed dwelling; provision of new boundary walls to front and rear of existing site and all ancillary site works.
Conversion of existing attic space comprising of modification of existing roof structure; new access stairs; flat dormer roof to rear.
Single storey granny flat extension to side of existing house
Construction of a single storey extension to side of existing dwelling with internal modification and associated site works.
Alterations to existing roof profile to include the removal of existing 'Dutch' hip roof; extension of existing gable wall and construction of a dormer window to the rear allowing for the conversion of the attic space to study.
Proposed loft conversion including dormer structure with window to rear roof profile and velux roof windows to front roof profile.
Single storey extension as SEN Unit to north-east of school building with 2 No. SEN Classrooms (70sqm each); 2 No. Quiet Spaces (13sqm each); 1 No. Multi-Activity Room (20 sqm); 1No. Central Activity Space (100sqm) and Daily living skills (15sqm); 1 No. office(20sqm); toilets and shower area(18.52 sqm); 3 No. staff toilets (8.15 sqm); 1 No. changing place (12.52sqm); 2 No. storage spaces (14 sqm); 1 No. cleaner store (3sqm); 1 No. sluice(3sqm) and ancillary services; external new secure soft play area (120sqm) and sensory garden (90sqm); 6 No parking spaces and all associated site works and services including new vehicular & pedestrian gates to Greenfort Lawns at St. Bernadette's Senior National School, Greenfort Avenue, Quarryvale, Dublin 22, D22 PW58
Sub division of existing site for the construction of a semi-detached 2 storey house, connection to public foul sewer, amendment of existing boundary walls and new vehicular entrance arrangement for existing and proposed house and all associated site works.
The development requiring retention permission consists of the construction of a utility shed in the rear garden
Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs and flat roof dormer to the rear.
Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs, 2 no. roof windows to the front and flat roof dormer to the rear.
The proposed development will consist of: 1. Automatic car wash with water recycling system & payment terminal and 2. Associated revisions to existing knee-high timber fence, landscaped area and all associated site development works including drainage infrastructure, landscaping and line marking.
A new unmanned service station development consisting of construction of new petrol filling station forecourt with 4 dispensers, 2 underground fuel storage tanks with canopy structure (covering c. 235sq.m and 6.2m in height) with associated signage; Widen existing site entrance to the north-east of the site and creation of new egress location onto the Fonthill Road along the northern boundary to allow one-way internal road network incorporating new pedestrian crossing over existing footpath at site egress location; Automatic brush car wash and adjoining jet car wash with water recycling system; Single storey services building structure comprising of a car wash plant room and comms room area (gross floor area 16.3sq.m.); 4 electric charging bays, each comprising of a parking space and electric vehicle charging unit and associated signage; 3-room ESB substation to cater for EV charging infrastructure (gross floor area 38.3sq.m.); Air/Water services area with 2 car parking spaces; 2 internally illuminated double-sided totem signs, 1 at site entrance (4m high x 1.91m wide) with advertising area 15.3sq.m and 1 adjacent the new site egress location (5.8m high x 1.91m wide) with advertising area 22.16sq.m; All other associated underground and overground infrastructure, drainage, lighting, CCTV unmanned systems, landscaping and site development works.
Construction of ground floor family flat extension to the side of existing two storey end of terrace dwelling.
Retention of roof canopy to front of house and retention for attic conversion with dormer projecting window to rear roof for playroom / storage use and all associated site works.
Permission for a dormer attic conversion to include an open plan store with access staircase, and all associated site works
The development will consist of change of use of the existing vacant ground floor retail unit 1B to a new medical centre, comprising 3 No. consultation rooms, reception and waiting area, canteen and WC facilities and to include alterations of existing double doors on North Elevation to 2 No. single doors.
Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs and flat roof dormer to the rear.
Widen dished area of public footpath.
Installation of 860 Solar PV Panels over the roof of existing retail building and all associated site works and services.
Front porch and new side gate.
(i) Construction of a sheltered canopy (c.55sq.m) in the existing car park for the purpose of providing 2 dedicated 'Click and Collect' spaces for the existing Tesco store and (ii) ancillary signage and all associated site development works.
Two storey detached dwelling house complete with front and rear gardens; new vehicular entrance and driveway from Glenfield Drive and all associates site works.
Change of use of existing retail unit to use as a hot food takeaway shop with home delivery service.
Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs and flat roof dormer to the rear
Conversion of attic space comprising of modifications of existing roof structure, new access stairs and flat roof dormer to the rear.
Alterations to the attic storage space to include two dormer roofs to the rear, Velux roof lights to the front, internal modifications and all associated site works
Conversion of existing attic space to non-habitable storage/office area with new revised roof profile (from half hipped roof to gable end roof) to both sides of roof, New Dormer Type Window to Rear, 2 rooflights to front elevation, with internal modification and associated site works
Retention permission for the continuation of the temporary staff car park for a period of 5 years consisting of 204 spaces (previously authorised under Planning Application Reg. Ref. No. SD15A/0159) and a shop mobility structure (c. 34sq.m). Permission is also sought for a period of 5 years for a new barrier at the entrance to the temporary car park: and all ancillary site services, drainage and site development works.
To Convert the existing attic space to home office/study with the construction of a dormer window in the rear elevation roof plane and addition of two roof lights in the front elevation roof plane.
Planning permission is sought for single storey kitchen extension to the rear of the house, also first floor extension to increase bedroom size and all associated site works.
Porch and living room extension to front of house and all associated site and drainage works.
Retention of coffee shop use & internal seating area within shop unit at ground (79sq.m); provision of additional internal seating area of 51sq.m; new shop opening onto shopping mall and seating area of 15sq.m within the mall directly in front of shop unit; all associated site services & development works.
The development will condsist of an attic conversion extending existing ridge level to accomadate proposed bedroom and associated works
The development will consist of the proposed construction of a single-storey extension with flat roof to side + rear of existing dwelling including internal alterations and provision for wheelchair accessibility to 2 additional bedrooms and accessible bathroom at ground floor. All other associated ancillary site works included in the application.
Attic conversion for storage, including front and rear dormers. Single storey side and rear sloped roof extension to create a covered passageway. Single-storey flat roof rear extension.
Mixed leisure, entertainment and retail extension to the existing Liffey Valley Centre organised around a large public plaza and pedestrian friendly east-west street with parapet levels varying between c.15m and c.18m above street level; the scheme provides for: (a) a two storey commercial extension (c.46,783sq.m gross) with plant areas at roof level to the existing Centre providing for mixed leisure and entertainment units (c. 9,247sq.m gross), food/beverage units (c.4,052sq.m gross), retail units (c. 21,051sq.m gross) and all ancillary space and circulation areas (c.12,433sq.m gross); the main retail area will be anchored by two stores (comprising a total of c.10,090sq.m gross) located on either side of the public plaza; (b) a central public plaza fronting onto the east-west street covered with a large glass canopy in the form of a curved gridshell structure, this structure will be the tallest part of the proposal at a height of c. 20m above street level, the food/beverage units are located around the plaza at both ground and first floor levels; (c) car parking over two levels (c.900 spaces including 45 universal access spaces and c.200 long stay cycle spaces with an area of c.27,917sq.m gross) located north-east of the extension area c. 290 short stay cycle spaces, 27 short stay car parking spaces and car/taxi set down areas on the east-west street; c.100 long stay cycles spaces provided within the existing car park to the adjacent to the Westend development (Vue Cinema and restaurants); approximately 2,085sq.m of existing gross floor space is to be removed/demolished over ground and first floor to facilitate the extension; the proposal includes all associated service yards, plant and equipment, photovoltaic panels, electricity substations, all utility connections and works, street lighting, signage, landscaping and boundary treatments; the proposal includes the construction of new toucan crossing points for cyclists on Ascail an Life (Ring Road around the Centre) at the western end of the east-west street to provide safe connection to the existing cycle network. An Environmental Impact Assessment Report (EIAR) is submitted.
The development will consist of the installation of 2 no. retail/food/beverage kiosks in the existing mall of Liffey Valley Shopping Centre. Each kiosk is c.15 sq.m (5m x 3m) and c.4m in height with signage of c.12.8 sq.m (2 no. signs of 5m x 0.8m and 2 no. signs of 3m x 0.8m) and an associated seating area of c. 53.8sq.m.
New stainless steel and glass bus shelter, 5.2m x 1.85m x 2.8m high with 2 internally illuminated advertising panels each of 2.0sq.m area on the public footpath.
The proposed development will consist of the subdivision of existing Unit 40B (c.161sq.m) into a retail unit (c. 83sqm), a storage room (c.29 sq.m), a circulation corridor (c. 37 sq.m) and a non-accessible area (c.7 sq.m), and all associated site services and development works.
Extension, refurbishment, and alterations to adjoined warehousing Units 1, 2 & 3 Cloverhill Industrial Estate, Clondalkin, Dublin 22 as follows: 1. The existing warehousing Unit 1 (existing total area 11,725m2, comprised of 8,526m2 warehouse area and 3,199m2 of two storey ancillary offices) is proposed to be subdivided into two units as follows: A. Unit 1A, 2,582m2 in total including redesigned ancillary offices on 2 floors with an overall area of 522m2 (note: existing two storey office will be reduced by the demolition of 259m2 first floor offices and change of use of part of ground floor office, 281m2, to warehousing space), with a resulting warehouse area of 2,060m2. B. Unit 1B, 8,116m2 in total including redesigned ancillary offices on 2 floors with an overall area of 568m2 (note: existing two storey office will be reduced by demolition of 768m2 first floor offices and change of use of part of ground floor office, 801m2, to warehousing space) with a resulting warehouse area of 7,548m2. Both of the above units to receive front/southern elevation upgrades and access improvements of HGV's entering the site through two improved existing entrance/exit locations, addition of 1 no. goods door to Unit 1A, addition of 4 no. dock leveller doors & 1 no. goods door to Unit 1B, removal of a disused sprinkler pumphouse/plant room & (167m2) and sprinkler tank (24m2, 7m high) to the rear of Unit 1B, associated elevational changes, drainage works including surface water swales, landscaping, rearranged car parking, provision of cycle parking and associated site development works. 2. Existing Unit 2 building area remains unaltered. 3. Existing Unit 3 with a total area of 4,995m2, proposed alterations will include existing warehouse office area (90sqm total over 3 locations) to be reduced to 42sqm by the demolition of 24m2 of first floor office and the change of use of 24sqm of part of ground floor office area to the warehousing area, and separately demolition of 147sqm of adjoined warehouse corridor resulting in 4,782m2 of warehouse area with the addition of a proposed new two storey adjoined ancillary office area extension of 358m2, with associated elevation works, ancillary cycle parking and adjusted car parking, addition of 2no. dock leveller doors & 1 no. goods door to the side/eastern elevation plus associated drainage works including surface water swales, landscaping and associated site development works.
Retention Permission for several items further to the construction of the development as granted planning under South Dublin County Council Reg. Ref. SD24A/0015 for an extension, refurbishment, and alterations to adjoined warehousing Units 1, 2 & 3 Cloverhill Industrial Estate, Clondalkin, Dublin 22. The items for which Retention Permission is sought are as follows: 1.Alterations at Unit 1, resulting in a total area of 10,153m2 (10,120m2 of warehouse area, and 33m2 of Staff Facilities Area) as follows: A.Omission of previously proposed subdivision of Unit 1 in two units (Unit 1A and Unit 1B), with no area change. B.Change of use of 276m2 of Ancillary Office Area and 236m2 of Staff Facilities Area to Warehouse Area (at Ground Floor) and removal of 545m2 of Ancillary Office and Staff Facilities Area (at First Floor) due to the omission of previously proposed 2 storey Ancillary Office for Unit 1A and Unit 1B and redesign of existing Plant Room area at North-western corner of Unit 1 to accommodate warehouse toilet block and IT room. 2.Alterations at Unit 3: change of use of 3m2 of Staff Facilities Area to Ancillary Office Area and 39m2 of Ancillary Office Area to Warehouse Area (at Ground Floor) and 3m2 of Ancillary Office Area to Staff Facilities Area (at First Floor), resulting in 5,182m2 (4,824m2 of warehouse area, 221m2 of Ancillary Office Area and 137m2 of Staff Facilities Area) due to the structural design arrangements at the Ancillary Office and demolition of 2No. existing warehouse offices. 3.Previously proposed existing internal roller door to be built up, now retained to provide a connection between Unit 1 and Unit 3. 4. Elevational changes, with no floor area changes, due to the above mentioned modifications, including: A.Addition of 3No. fire escape concrete steps and refugee area at Unit 1. B.Omission of 2No. personal doors at Unit 1. C.Relocation of 1No. level entry door at Unit 1 and, D.Omission of 1 dock leveller door due to the retention of existing level door and personnel door at Unit 3. 5.Associated site works including: A.Existing ancillary area at front elevation of Unit 1 is retained unaltered. B.Previously proposed HGV access at front elevation of Unit 1 now omitted due to the omission of the subdivision on Unit 1, HGV access is now at South-eastern corner of the site. C.Addition of fence and swinging gate for fire escape circulation at South-western corner of Unit 1 and omission of fire tender swinging gate at the rear of the site, between Unit 1 and Unit 3. D.Site works adjustments due to elevational changes. All other elements remain as per granted planning application Reg. Ref. SD24A/0015.
Permission to amend part of previously approved reg ref (5145/22) previously described as single storey detached temporary accommodation unit to southeast of site of 200.39m2 to relocate Training & Education Services at Blackthorn Unit, Cherry Orchard Hospital Campus, Ballyfermot Road, Ballyfermot, Dublin 10. Permission is now sought to provide for a permanent structure of similar layout and associated works in perpetuity.
Planning permission for the following development: 1) New single-storey detached temporary accommodation unit to southeast of site of 200.39m2, to relocate Training & Education Services. 2) Single storey extension (32.78m2) to northeast of Blackthorn unit includes alterations of elevations to suit revised layout for Daycare Service. 3) New single-storey external detached M&E plant room to southwest of site (59.98m2). 4) Fit solar panels to roof areas and associated works on all 3 buildings. 5) Alterations of parking/landscaped area to provide ambulance set down area and all associated site development works, services and landscaping.
Construction of a two storey, detached house with single storey elements to front and rear elevations also all associated site works on site at side of existing house.
New flat roof dormer to the rear of the existing house roof. The top of the flat roof dormer to be 400mm above the existing house ridge line. A new Velux to the front of the existing house roof and all ancillary works.
Office accommodation extension to the rear of the existing office building (455sq,m at ground floor, 33.2sq.m at first floor); covered bicycle parking area to the front of the existing building 25.2sq.m; all necessary associated ancillary ground and drainage works.
Change of use of 464sq.m of warehouse mezzanine storage, approved under planning reference SD18A/0031, to office use, as well as associated and ancillary internal works, elevational changes and external ground works to facilitate this new use.