Demolition of all existing structures on site (c. 1,326 sq m), including: Two storey building formally used as public house, ancillary off-licence and associated structures (c. 972 sq m); Two storey building comprising an existing barber shop and betting office (c. 260 sq m); Single storey cottage building and associated structures (c. 94 sq m); and Eastern boundary wall and gated entrance from Mount Carmel Park. The development with a total gross floor area of c. 11,638 sq m, will consist of 100 residential units arranged in 2 blocks (Blocks 01 and 02) ranging between 3 and 5 storeys in height, over lower ground floor and basement levels, comprising: 96 apartments (consisting of 2 studio units; 45 one bedroom units; 10 two bedroom (3 person) units; 34 two bedroom (4 person) units; and 5 three bedroom units), together with private (balconies and private terraces) and communal amenity open space provision at podium and roof levels; and 4 duplex apartments (consisting of 2 one bedroom units and 2 two bedroom units (4 person) located within Block 01, together with private balconies and terraces. Also included is non-residential uses (c. 355 sq m), including: 1 café (c. 58 sq m) and 1 office (c. 30 sq m) located at ground floor level of Block 01; 1 medical unit (c. 59 sq m) and 1 betting office (c. 66 sq m) located at ground floor level of Block 02; 1 barber shop (c. 28 sq m) located at ground floor level between Blocks 01 and 02; and 1 crèche (c. 114 sq m) located at lower ground floor level of Block 01 and associated outdoor play area to the rear. Vehicular access to the site will be from the existing access off Firhouse Road. The proposal includes minor alterations to the existing access, including the provision of new and enhanced pedestrian infrastructure. The development will also consist of the provision of public open space and related play areas; hard and soft landscaping including internal roads, cycle and pedestrian routes, pathways and boundary treatments, street furniture, basement car parking (80 spaces in total, including accessible spaces); motorcycle parking; electric vehicle charging points; bicycle parking (long and short stay spaces including stands); ESB substations, piped infrastructural services and connections to existing public services, (including relocation of existing surface water sewer and water main from within the application site onto the public roads area along Firhouse Road and Mount Carmel Park); ducting; plant; waste management provision; SuDS measures; stormwater management and attenuation; sustainability measures; signage; changes in levels; public lighting; and all ancillary site development and excavation works above and below ground. The application contains a statement setting out how the proposal will be consistent with the objectives of the South Dublin County Council Development Plan 2016-2022 and the South Dublin County Development Plan 2022-2028. The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in section 37(2)(b) of the Planning and Development Act 2000, as amended, notwithstanding that the proposed development materially contravenes the South Dublin County Council Development Plan 2016-2022 and the South Dublin County Development Plan 2022-2028 other than in relation to the zoning of the land.
Ground & first floor extension at rear to replace single storey structure plus attic conversion into non-habitable space along with porch extension to front.
Provision of non-habitable space in attic with dormer structure to rear roof elevation, together with completion of single storey extension (floor area: 29 square metres) to the rear of dwelling-house.
Change of use of existing single storey library to retail use with part off-licence at the former public library; demolition of the existing projecting entrance porch and alterations to the front elevation to provide shopfront glazing and signage.
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs, 2no. roof windows to the front and flat roof dormer to the rear.
Retention permission for increase in area of existing porch (increase of circa 2.5sqm), alterations to part of existing flat roof to mono-pitched roof with upgraded flat roof to side/rear of existing dwelling and all associated site works at 28a Main Road Tallaght Dublin 24 D24XF4W.
Conversion of existing attic space comprising of modification of existing roof structure, new access stairs and flat roof dormer to the rear
Demolition of modern single storey structure attached to the west of the existing building (Protected Structure); construction of a two storey 131sq.m extension to the west; two storey 1121.7sq.m bedroom wing extension with a link corridor to the south; one storey 32sq.m extension to the north of the existing building (Protected Structure); minor internal alterations to the ground and first floor of the existing building (Protected Structure) and all associated site works.
Planning permission is sought to amend Condition No. 5 of Reg. Ref. WA/389 which states that the building be used as a geriatric nursing home as set out in the application to now state that the building be used as a nursing home for the provision of residential accommodation and care to people in need of care. There are no works proposed as part of this application.
First floor extension over existing ground floor extension to rear of house, consisting of two bedrooms and a bathroom and all associated site works.
Attic conversion for storage. Single storey front and rear extension. Widening of front vehicular access. Two Velux windows to the front roof area. Demolition of existing shed.
Single storey extension (18.0sq.m) to side of dwelling; enlarge existing front porch (2.4sq.m) to front; associated site works.
First floor extension (4sq.m) to rear of dwelling.
Attic conversion with dormer roof to rear plus changing of existing roof profile from hipped to new mini Dutch roof and 2 'Velux' rooflights to front roof slope and removal of existing chimney stack plus construct a single storey rear extension and all associated site works.
The development seeking retention consists of the construction of a garden structure circa 37sqm for home office and gym use with utility area.
Attic conversion with dormer roof to rear plus changing existing roof profile from hipped to new mini Dutch roof plus removal of chimney stack and 2 Velux rooflights to front roof slope and all associated site works.
Part change of use from offices and warehouse to ancillary trade counter and showroom, offices and warehouse; reduction in area of first floor; new signage to front; relocating fire exit door to side; ancillary works.
The alterations to the existing roof profile to convert it from a hipped roof profile to gable wall with apex roof, removal of the external chimney stack, conversion of the existing attic space into a home office/study with a dormer window to the rear, 2 roof lights to the front elevation roof plane and a new window in the new gable wall at second floor level.
Single-storey, flat-roof front extension with two rooflights and a new side door at ground level.
Construction of a new single storey rear extension (22sq.m) with pitched roof and all associated site works.
For the construction of single storey extension to the front of existing dwelling which will include new bay window, new pitched roof, and front elevation alterations/change of materials. Retention permission is also sought for the change of use of attic space to storage space including rear rooflights and all associated ancillary site works
The proposed development includes the conversion of the existing attic. Alteration of the existing roof profile from hipped to full apex, Insertion of a gable window. Removal of the existing chimney. Construction of a dormer window to the rear roof plane and insertion of two roof windows to the front, plus all associated site works.
Two storey side extension (ridge height 6.71 metres) which consists of a ground floor kitchen and dining area, first floor consists of two bedrooms with one ensuite; new first floor window to the front of the existing house and new ground floor window to the rear of the existing house and associated site works.
Amendments to previously permitted Planning permission SD23B/0040. Amendments consist of alterations to roof profile from hip to hip/flat roof and associated site works all at 82 Woodlawn Park Drive, Dublin 24
Reinstatement of Fire-damaged 2-storey 3 bed detached dwelling (S00A/0221). Permission is also required for removal of disused chimney stack to side dwelling, internal alterations and associated siteworks
Attic conversion, raising of gable end to change roof profile with dormer projecting window to rear for playroom use, removing chimney from attic location and roof and all associated site works.
The development will consist of Demolition of existing garage to side and adjoining single storey outbuildings (Total 70sqm). Construction of a two-storey extension to side (Total 63sqm) to include ancillary works to existing roof. Provision of 02No. Bay-windows to front at ground and first floor (Total 2.8sqm). Open porch to front, Single Storey extension to rear (Total 70sqm) and all associated internal modifications. 2No. Single Storey outbuildings (Pool Room & Mechanical Plant) to rear garden (Total 112sqm). Widening of existing vehicular entrance, and all associated site works for the above
Retention permission for: Retention of roof over main Dwelling from previously approved proposed height of 8.0M to as built height 8.25M (reference of Grant of Permission SD22B/0261) to include continuation of this ridge line over as -yet to be constructed roof over previously approved 2 storey extension at 22A Main Street Tallaght Dublin 24
Attic conversion. Raising of gable end to change roof profile with dormer window to rear for playroom use. Removing chimney at attic location and roof. Associated site works.
Renovate and extend part of the existing single and two storey enterprise centre (existing gross floor area: 2,379 sq.m.) to create a food and beverage enterprise centre to be called Priory Market including (i) a single storey extension (114 sq.m) on the west (side) elevation; a two storey extension (290 sq.m) on the east (side) elevation, 2 new mezzanine areas (51 sq.m and 19 sq.m); a new disability accessible toilet at first floor level; plant area at roof level (overall proposed gross floor area: 2,853 sq.m); (ii) the open plan market area will comprise 12 vendor stalls with unreserved seating and tables, extended and reconfigured toilets, a shared kitchen area (123 sq.m), a dishwasher room, etc., and a bar area ancillary to the existing Priory Brewery (that will be extended internally by 50 sq.m); (iii) a new entrance door at the northern elevation with existing entrance replaced by a window; (iv) optional solar panels on the roof; (v) revisions to the existing surface level car park to provide for 37 car parking spaces, 3 mobility impaired spaces, and 10 electric vehicle charging point spaces, and 66 bicycle spaces; (vi) revisions to the existing vehicular entrance at Main Road to provide for a new pathway; (vii) 8 Priory Market signs as follows; 1 double sided sign (1400 x 2000 mm) within the existing freestanding Bryan S Ryan sign; 2 signs (1000 x 5600 mm each) at the site entrance wing walls, 3 freestanding flag type signs (1700 x 700 mm each) with an overall height of 3.9 metres; 1 no. freestanding sign (1400 x 7000 mm) on a support frame with an overall height of 4.4 metres; and hand painted sign (1600 x c. 38000 mm) below eaves level across the rear elevation; and (viii) landscaping and ancillary site development works.
A solar panel canopy to outdoor seating area at the west side/front of Priory Market
To remove existing front porch and replace with new front porch tiled roof; remove existing front window, block up part front structure with new double glazed window and associated site works.
Retention permission for a single storey extension to rear of existing house (Protected Structure).
Proposed first floor extension over existing single storey extension to side of 75 Woodlawn Park Avenue, Firhouse, Dublin 24
Front entrance porch.
Demolition of extension to side and for two storey two bedroom house with new vehicular entrance and modifications to existing vehicular access.
Demolition of extension to side and construction of two storey three bedroom house to side.
The construction of a single storey extention to the front of existing 2-storey mid terrace and all associated site works.
Single storey front & side porch extension with tiled roof over, demolition of existing concrete roof over the existing side bedroom and replaced with new tiled roof with roof lights, conversion of attic space into study with a dormer roof window extension to the side of existing hipped roof. Dishing of public footpath verge & kerb. New permeable driveway paving. Retention of 4.3m wide driveway entrance and retention of single storey 34sq.m recreation room in rear garden and all associated site works.
Construction of single storey front extension to increase living and hallway space and associated works.
A new two storey extension to the side and single storey extensions to the rear and front of the existing dwelling
Demolish existing carport and shed, erect new 2 - storey 3 bedroom detached dwelling at front side and rear, erect new realigned 2 - meter high wall on the northern side to run alongside the existing public footpath and an extended 2.675 meter high wall on the Ballycullen Rd elevation, new front vehicular entrance for new dwelling and the repositioning of the existing vehicular entrance for the existing dwelling
Seabren Developments Limited intend to apply to South Dublin County Council for planning permission at the Speaker Connolly Tavern. The site is bounded by Firhouse Road to the northwest, Ballycullen Avenue to the northeast, Firhouse Shopping Centre and car park to the south and neighbourhood shops to the east of the site. Vehicular access to the site will be from the existing vehicular access on Ballycullen Avenue with the existing right of way to and from the Supervalu Shopping Centre maintained. The proposed development will consist of the demolition of the Speaker Connolly public house including the part single part two storey public house, and ancillary stores and structures (c.411sqm), on a development site of 0.323 Hectares (overall site area 0.332 Ha), and the development of 55 residential units together with commercial uses (gross floor area 7351.4 sq.m.) all in one building ranging in height from 4 to 6 storeys and part basement, comprising: • 17 One Bed Apartments • 38 Two Bed Apartments • 1 no. Public House and Restaurant (c.457.9 sq.m), 1 no. Cafe (c. 72 sq.m) and 1 no. Beauty Salon 27sq.m at ground floor level • 1 no. Medical Centre 144Sq.m and 1 no. Gym 114.8 sq.m at first floor level • Existing basement will be used as a plant room (c.127.6 sq.m). The works include removal of the boundary wall along Ballycullen Avenue, reconfiguration of the existing entrance, access road and public footpath and use of the existing internal access road including the vehicular link between Ballycullen Avenue and the Firhouse Shopping Centre. The development will also consist of the provision of enhanced pedestrian infrastructure, provision of communal open space (c.297 sq.m) at podium level and related play areas, public open space (c.390 )including hard and soft landscaping, boundary treatment, street furniture, car parking along the internal access road (2 visitor spaces), below podium car parking (25 no. spaces, including 2 accessible spaces and 2 car share spaces), electric vehicle charging points (4. no. of spaces ), bicycle parking (104 long stay, 48 short stay spaces and 4 cargo bike spaces), ESB substation and electrical services area, piped infrastructural services and connections to existing public services, ducting; plant, waste management provision, SuDS measures including Green/Blue roofs, stormwater management, signage; public lighting, solar panels as well as telecommunications infrastructure including 18 No. antennas enclosed in 9 No. shrouds and 6 No. transmission dishes, together with all associated equipment and all ancillary site development and excavation works above and below ground. An Coimisiún Pleanála-322215-25 Condition 10:
Single storey extension to the western side of the pub to extend the public area comprising a retractable canopy with fixed side panels (75sq.m in area); 2 double door entrances and associate site works.
Demolition of the Speaker Connolly Public House including the part single part two storey public house, and ancillary stores and structures (c. 411sqm), on a development site of 0.323 Hectares (overall site area 0.332 Ha). The proposed development with a total gross floor area of c. 8,813 sq.m will consist of 85 residential units and associated balconies for all units in one block ranging in height from 5 to 6 storeys in height over round floor and part basement, comprising: 36 One Bed Apartments, 48 Two Bed Apartments, One Studio Apartment. The development will also consist of non-residential uses at ground floor level (c. 596 sq.m), including: 1 no. Public House (c. 143 sq.m), 1 no. Restaurant (c. 169 sq.m) 1 no. Health Care Unit (c. 91.8 sq.m), 1 no. Cafe (c. 55.4 sq.m) 2 no. Micro Enterprise Units (c. 93.6 sq.m and 43.4 sq.m, respectively). The existing basement will be used as a plant room (c. 110.5 sq.m), Vehicular access to the site will be from the existing vehicular access on Ballycullen Avenue, the proposal works include alterations to the existing access and public footpath, including the provision of enhanced pedestrian infrastructure. The development will also consist of the provision of communal open space (c. 653 sq.m) at podium level and related play areas; public open space (c. 300 sq.m) including hard and soft landscaping, internal access road including a vehicular link between Ballycullen Avenue and the Firhouse Shopping Centre, boundary treatment, street furniture, car parking along the internal access road (11 spaces in total including 1 accessible space), below podium car parking (32 no. spaces in total, including 4 accessible spaces); electric vehicle charging points (9 no of spaces); bicycle parking (155 long stay and 58 short stay spaces); ESB substation, piped infrastructural services and connections to existing public services; ducting; plant; waste management provision; SuDS measures including Green/Blue roofs; stormwater management; signage; public lighting; solar panels as well as telecommunications infrastructure including 18 no. antennas enclosed in 9 no. shrouds and 6 no. transmission dishes, together with all associated equipment and all ancillary site development and excavation works above and below ground.
The change of use and conversion of existing attic space to storage space with dormer window to the rear, hipped roof to new gable wall, with ground floor single storey extension to the rear, and conversation of the side garage to habitable space with minor alterations to the front elevation, internal layout adjustments and all associated ancillary site works at 30 Bancroft Avenue Dublin 24, D24 XWE0.
Dishing of public footpath, verge and kerb. Retention of widening of vehicular entrance and all associated site works.
Single storey porch extension to the front of existing dwelling and all ancillary site works.
Extend the exiting concrete ridge tiles to main roof to form a new dutch type roof structure: extend existing side structure up to new soffit level with two new windows in structure: form a new dormer roof structure in the existing rear concrete tiled roof: convert existing attic area into a non-habitable attic area: internal alterations & associate site works.
Proposed ground floor side extension with pitched roof over with 2 roof lights.