Permission sought for a 2.4-metre-high steel palisade fence and gate at south side of St. Oliver's Training Centre, Cloverhill Road, Dublin 22.
A single Storey extension to the side of the house and all ancillary site works
Office accommodation extension to the rear of the existing office building (455sq,m at ground floor, 33.2sq.m at first floor); covered bicycle parking area to the front of the existing building 25.2sq.m; all necessary associated ancillary ground and drainage works.
Change of use of 464sq.m of warehouse mezzanine storage, approved under planning reference SD18A/0031, to office use, as well as associated and ancillary internal works, elevational changes and external ground works to facilitate this new use.
The development will consist of the demolition and removal of the existing single storey and temporary buildings on site and, the construction of a Community Centre and Place of Worship ( Mosque ) in a detached part single storey and part two storey building, part pitched and part flat roofed, incorporating solar PV panels and a feature minaret and dome on / over roofs levels, and including the following within the building envelope: Entrance and circulation spaces, reception / refreshment zone, 2 no. retailing / services units, a prayer room and gallery, a multi-purpose events room, 1No. three bedroomed apartment, community health / medical consulting rooms, administrative spaces, a room as a library / book store / meeting room, enclosed car parking and supporting services spaces including for such uses as, toilets and for ablutions, tea stations, storage, service plant, etc. On site but external to the building will be the main vehicular and pedestrian site entrances including gates in the new northern boundary, pedestrian and vehicular circulation routes, boundary treatments including walls and fencing, car and bicycle parking, a small service yard, a community clothes recycling bank, hard and soft landscaped areas including a children's play space etc.
Demolition of two existing unoccupied, unused and dilapidated single storey buildings and the construction of a Community Centre and Place of Worship (Mosque) in a detached three storey over basement building (basement, ground, first and second floors), part pitched and part flat roofed, incorporating solar PV panels and a feature minaret and dome on/over roof levels and including: (a) at basement level - circulation spaces, car parking, bicycle parking, exercise room, service rooms, service plant and bin storage; (b) at ground floor level - main entrance and circulation spaces, administrative spaces, toilets and ablutions areas, storage rooms, tea stations, mortuary, prayer room with supporting service rooms, 2 classrooms, a library/book store, 3 retailing/services units, child minding rooms; (c) at first floor level - circulation spaces, administrative spaces, toilets and ablutions areas, 2 apartments, community health rooms, events room, kitchen/servery, prayer gallery overlooking the prayer room; (d) at second floor level - circulation spaces, administrative spaces, toilets, restaurant, kitchen; external to the building will be main vehicular and pedestrian site entrances including gates in the new northern boundary, limited car and bicycled parking, ramp entrance/exit to & from the underground basement car park, service yard, external circulation, children's play space, hard and soft landscaped areas, boundary treatments including walls and metal fencing; the areas and locations of each use will be shown on the drawings proposed to be lodged with the planning application and the times of use and occupancy of each are listed within written documents to be lodged with the planning application.
Construction of a two-storey flat-roof extension to the side and rear of the existing dwelling, incorporating new side access door and new side and front-facing windows at ground and first floor levels.
Kelland Homes Ltd. seeks permission for development, consisting of amendments to street design, and in compliance with condition no. 16(e) attached to planning permission Ref. SDZ22A/0010. The proposed development consists of the creation of an intimate local street/home zone and includes for all associated site development works, car parking, landscaping and public lighting etc., all on a site measuring c.0.15Ha, located at "Keepers Lock", Clonburris, Dublin 22, within the Clonburris Strategic Development Zone (SDZ). This application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015.
Alterations to previous approved planning application, Reg. Ref. SD15A/0105, consisting of: construction of a new single storey flat roof modular changing facilities (293sq.m) ancillary to the existing playing pitch; relocation of approved 38 carparking spaces and 2 coach parking bays from northern boundary to the eastern boundary adjacent to Cloverhill Road installation of new overhead flood lights; 3 new flag poles; continuation of previously permitted boundary wall and footpath (Reg. Ref. SD15A/010) extending along the south eastern boundary, with addition of new security fencing added to top of wall, all adjacent to Cloverhill Road; new entrance gates (accessed via the permitted entrance off Cloverhill Road); all associated boundary treatment, landscaping and ancillary works necessary to facilitate the development.
New office space at first floor level (66.sq.m); minor alterations on the road frontage elevation (southeast) to include additional windows for new offices; all works proposed are ancillary to the use of the existing building and business.
The construction of new office space at ground floor level including revisions to the front and side elevations to include external windows and doors, all works proposed are ancillary to the use of the existing building and business.
The construction of new office space at first floor level including enclosing the existing access stairs (total area @ 87.915 sq./mts), all works proposed are ancillary to the use of the existing building and business.
Installation of an above ground water retention tank (13.1m x 8.1m x 2.85m high); underground water retention tank (8.3m x 3.70m x 5m deep) and balancing system, located at the south-east corner of the site including the diversion of surface water drains to the existing foul sewer system via the proposed tank and all site works associated with the proposed development.
Installation of an above ground water retention tank (13.1m x 8.1m x 2.85m high); underground water retention tank (8.3m x 3.70m x 5m deep) and balancing system, located at the south-east corner of the site including the diversion of surface water drains to the existing foul sewer system via the proposed tank and all site works associated with the proposed development.
Construction of a temporary logistics and storage facility within the Clonburris NorthWest Development Area of the Clonburris Strategic Development Zone (SDZ) Planning Scheme 2019. The facility includes the provision of a logistics facility comprising a warehouse (single story pitched roof c.11.356 meters in height) and adjoining unit (single storey pitched roof c. 6.22m in height) with a combined Gross Floor Area of 1,411sq.m; The provision of a single-storey ancillary office and staff facilities to include an office (25sq.m), canteen/ changing area (24.8sq.m), and WC (9sq.m); Vehicular and pedestrian access from the Fonthill Road (R113) to the east, 24 car-parking spaces, 5 HGV setdown parking spaces and turning/loading areas and 18 bicycle parking spaces; All ancillary site development works including attenuation, footpaths, lighting, landscaping boundary treatments and signage; The logistics facility will exist for a temporary period of up to 10 years to facilitate the delivery and storage of building materials throughout the construction phases of the development of the entire Clonburris Strategic Development Zone; The logistics facility will not be open to the general public; This application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015 all on wider lands bounded generally by Thomas Omer Way (L 1059) to the north, the Dublin-Cork railway line to the south, the Fonthill Road (R 113) to the east and undeveloped lands to the west.
Temporary permission for the erection of 2 no. temporary advertising / information signs and 12 no. flags, on 2 no sites, both measuring 67 sq.m, located at (i) Fonthill Road (R113) roundabout, to the west of permitted development granted under Ref. SDZ22A/0010, and (ii) adjacent to the Ninth Lock Road, to the south-east of permitted development granted under Ref. SDZ22A/0010, all within the townland of Cappagh, Dublin 22. The proposed development is comprised of 2 no. advertising / information signs measuring approximately 6.0 m x 4.5 m, on metal structures of 2.4 m. in height. The 2 no. advertising / information signs will face: (i) southwest towards the Fonthill Road roundabout and, (ii) east towards the Ninth Lock Road. The 2 no. advertising / information signs will be accompanied with 12 no. advertising flags approx. 1.0 m x 3.5 m in length, supported by a 6.1 m steel flagpole. This application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clonburris Strategic Development Planning Scheme Area as defined by Statutory Instrument No. 604 of 2015.
Amalgamation of units F2 and F3 (with connecting doors at ground and first floor levels) and its use for warehouse and distribution with ancillary trade counter and showroom at ground and first floor levels; Retention of offices at second floor level which are ancillary to the overall warehouse operation; Retention of all signage and external illumination of the signage.
Sub division of existing site for the construction of a semi-detached 2 storey house, connection to public foul sewer, amendment of existing boundary walls and new vehicular entrance arrangement for existing and proposed house and all associated site works.
Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs and flat roof dormer to the rear. Construction of single storey Family Flat to the side of existing dwelling comprising of 2no. bedrooms, bathroom and open plan kitchen and living room and all associated site works.
Kelland Homes Ltd. intends to apply for permission for development on a site area of 6.3Ha, on lands within the townland of Cappagh, Dublin 22. The proposed development is located west of the Ninth Lock Road, south of the Dublin-Cork railway line, north of Cappaghmore housing estate and Whitton Avenue, and east of an existing carpark / park & ride facility at the Clondalkin Fonthill train station and the R113 (Fonthill Road). The proposed development is located within the Clonburris Strategic Development Zone (SDZ), within the development areas of (I) Clonburris South East (i.e. CSE-S1 & CSE-S2) and (ii) part of Clonburris Urban Centre (i.e. CUC-54), as identified in the Clonburris SDZ Planning Scheme 2019. The proposed development consists of the construction of 294 no. dwellings, creche and retail / commercial unit, which are comprised of: 118 no. 2, 3 & 4 bed, 2 storey semi-detached and terraced houses, 104 no. 2 & 3 bfd duplex units accommodated in 10 no. 3 storey buildings, 72 no. f' & 2 bedroom apartments in 2 no. 4 & 6 storey buildings, 1 no. 2 storey creche (c.520.2m2), 1 no. 2 storey retail /commercial unit (c.152.1m2).Access to the development will by via the permitted road network (under Ref. SDZ20A/0021) which provides access from the Ninth Lock Road to the east and the R113 (Fonthill Road) to the west. The proposed development will connect into the permitted Infrastructural works as approved under the Clonburris Strategic Development Zona Planning Scl1ame (2019) and permitted under Ref. SDZ20A/0021, with the proposed development connecting into the permitted surface water drainage attenuation systems i.e. 1 no. pond, 3 no. modular underground storage systems and 1 no. detention basin combined with modular underground systems. The proposed wastewater infrastructure will connect into a permitted foul pumping station and pipe network within proposed road corridors to facilitate drainage connections to future wastewater drainage infrastructure within the adjoining SOZ lands (Including future Irish Water pumping station permitted under SDZ21A/0006). The proposed development also provides for all associated site development works above and below ground, public & communal open spaces, hard & soft landscaping and boundary treatments, surface car parking (401 no. spaces), bicycle parking (797 no. spaces), bin & bicycle storage, public lighting, plant (M&E), utility services & 4 no. ESB sub-stations. This application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015.
Construction of a 2 storey, 2 bedroom, detached dwelling to side garden of existing dwelling; site works proposed including modification to vehicular entrance and boundary walls with landscaping and associated site works.
The proposed development will consist of the temporary storage of inert soil and stone generated by construction and development activity and imported as waste under licence or as by-product (in accordance with Article 27 of the European Communities (Waste Directive) Regulations 2011 (as amended)) as a non-waste by-product on a 3.87-hectare site within the Clonburris North-West Development Area of the Clonburris Strategic Development Zone (SDZ) Planning Scheme 2019. The proposed development will include for: i. The provision of temporary soil and stone storage for later re-distribution and use within the Clonburris SDZ; ii. The proposed fill material will be stored in 2 no. stockpiles of c.90,000m3 and 18,000m3. iii. The proposed 2 no. stockpiles will provide for a combined c.108,000m3 of material to be stored on site and will be c.6m in height; iv. Vehicular and pedestrian access will be provided via approved access off the Fonthill Road (R113), which will also serve the Logistics Facility as approved under Reg. Ref. SDZ23A/0016. The proposed inert soil and stone stockpiles will be temporary in nature and will be operational for an anticipated 7-year time period. It will then be decommissioned, and the subject lands will be restored and developed in line with the Clonburris Strategic Development Zone Planning Scheme 2019.
Single storey granny flat extension to side of existing house
Internal modifications to the existing retail warehouse unit to provide for a reduced and reconfigured mezzanine floor of 626sq.m and change of use of the mezzanine from ancillary storage to use as bulky goods sales area. Permission is also sought for associated signage on the north elevation and all associated site and development works. The modified Unit 9A will comprise a total gross floor area of 1,538sq.m
The development will consist of the change of use from a club function room and Kitchen to a restaurant with no material alterations being proposed
Kelland Homes Ltd. seeks permission for development, consisting of elevational changes and alterations to an apartment building (known as Block A) permitted under Ref. SDZ22A/0010. Permission is sought to (I) replace previously approved recessed balconies on the east and west facades with proposed cantilevered balconies and associated elevational and internal amendments, (ii) incorporation of ESB substation & meter room into the ground floor plan of the building and associated internal modifications, (iii) revisions to external materiality, and (iv) all associated site development works, car parking, open spaces & landscaping etc., all on a site measuring c.0.27Ha, located at "Keepers Lock", Clon Burris, Dublin 22, within the Clon Burris Strategic Development Zone (SDZ). This application is being made in accordance with the Clon Burris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clon Burris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015.
Two storey detached dwelling house complete with front and rear gardens; new vehicular entrance and driveway from Glenfield Drive and all associates site works.
We, Alucraft Ltd, make application to South Dublin County Council for permission. FOR RETENTION of development at this site address: Unit AF4O, Cloverhill Industrial Estate, Clondalkin, Dublin, D22 HY51, for alterations to permitted development under Reg. Ret: 91A/1082, 90A/734, 89A/50, 85A/505, T.A.562., R.A. 1123 and R.A. 1098, comprising of the following: 1. 1 No. 3-sided bike shelter with polycarbonate roof and wall sheets measuring 16.5 sq.m GFA to front of building, 2. 1 No. 3.83M High prefabricated structure comprising of additional office space measuring 76.8 sq.m GEA to front of building, 3. 1 No. 7.61M High, permanent storage enclosure with loading bay measuring 178.42 sq.m GEA to rear of building, 4. 1 No. 2.74M high prefabricated structure comprising of additional WC provision measuring 18.11 sq.m GFA to rear of building connected to existing foul sewer, 5. 1 No. 2.74M high prefabricated structure comprising of additional WC provision measuring 13.47 sq.m GFA to rear of building connected to existing foul sewer, 6. 1 No. 6.54M high permanent loading platform enclosure, measuring 100.95 sq.m GEA to rear of building, 7. 1 No. 3.31M (H) glazed curtain wall entrance porch/lobby to main reception measuring 9.11 sq.m GFA to front of building, 8. 1 No. 2.87M (H) glazed curtain wall entrance porch/lobby to main reception measuring 6.63 sq.m GFAto front of building, and all associated ancillary site works on an overall site area of 2.23 hectares.
Kelland Homes Ltd seeks permission for retention development, consisting of the replacement of permitted railing located to the rear of 8 no. duplex blocks under grant of permission SDZ22A/0010 with a proposed dividing wall measuring 1.8m in height sloping down to 1.1m on the overall site measuring 0.1ha located within Keepers Lock Clonburris Dublin 22.
Change of use of the existing Unit 14b (996sq.m) to use as a gym including internal layout modifications, external signage and all associated site and development works.
Subdivision of existing Unit 14 (2148sqm total floor area including mezzanine level) to create 2 units and all associated site and development works. The 2 proposed units are; Unit 14a (1541 sqm) with new mezzanine area and Unit 14b (996 sqm). Minor revisions to elevations comprising new access doors and a new window (mezzanine level) on the rear (north) elevation and a new escape door on front (south) elevation and associated signage on the north, south and west elevations comprising of 2 shopfront signs, 6 signage boards, 3 wall mounted signs and 2 service door signs.
Revisions to previous permission Reg. Ref. SD19A/0078 (Bord Ref. ABP-305228-19) for a retail warehouse unit (3,252sq.m) to allow retailing of a range of bulky and non-bulky sporting, recreation and leisure related products and ancillary goods; current application will supersede Condition 2 of Reg. Ref. SD19A/0078 (Bord Ref. ABP-305228-19) which permits the sale of bulky goods only.
(1) a new access roadway into the site from Cloverhill Road; (2) a new single-storey changing facility for Ballyfermot Utd. Sports & Social Club including new vehicular and pedestrian access gates to the club grounds from the new access road and parking for 37 cars and 2 buses and (3) residential development of 43 2-storey dwellings including 44 car spaces and comprising 4 Type A 3-bedroom semi-detached houses, 19 Type B 3-bedroom terraced houses, 16 Type C 3-bedroom terraced houses and 4 Type D 2-bedroom terraced houses. The proposed development also includes all associated landscaping, site development and infrastructural works.
Ecomondis Ireland Unlimited Company intend to apply for permission for retention of development and permission for development at Greyhound Recycling, Crag Avenue, Clondalkin Industrial Estate, Clondalkin, Dublin 22 The development to be retained consists of the constructed logistics office (c.74.5 sq.m), weighbridge office (c.40 sq.m), logistics ablution (c.28.5 sq.m), logistics canteen (c.23.75 sq.m), site canteen! laundry (c.42 sq.m), site ablution (c.40 sq.m), air handling plant featuring carbon stack of height c.16.6 metres (c. 335 sq.m), annexe building featuring chimney of height c.14 metres (c. 153 sq.m), rainwater tank (c. 7.0 sq.m) and generator room (c. 25.3 sq.m). Elements of the buildings for retention are associated with permitted development on site (SD03A/0838 and SD06A/0404) that require a waste license from the regulatory authority. The development proposed consists of the construction of 1 no. new service garage building c. 11.60 metres in height with a gross floor area of c. 636 sq.m and all associated site development works above and below ground necessary to facilitate the proposed development on this site of c.4.476 ha.
The development will consist of the construction of an extension of c.650 sq.m to an existing industrial unit and all associated site development works. The proposed extension shall be used for storage of dry mixed recyclable waste prior to shipping.
Retention for the partial change of use into a childcare facility and all ancillary site works.
Two storey extension to front, side and rear of existing house; side access pedestrian entrance to rear garden on boundary wall opening into rear garden and all associated site works.
Replacement of existing signage on the front (Northern) Facade with a new sign measuring approximately 37.95sq.m; the construction of a 50sq.m external WEEE enclosure; the installation of 2 external air handling units, condensers, distribution ductwork and all associated site works.
Attic conversion incorporating dormer extension to rear; all associated site works.
Retention for ground floor rear Extension and permission for extension to first floor at rear and all ancillary site works
Two storey extension to the rear of existing dwelling, to include rooflights and all ancillary site works.
Two storey extension to the rear of existing dwelling to include roof lights and all ancillary site works.
Construction of 2 two and a half storey, three-bedroom terrace houses and associated site works attached to the existing two and a half storey house at No. 6 Station Grove which was constructed in 2006; the 2 houses will complete this partially finished housing development which was originally granted permission under planning reference SD05A/0125.
Amendments to previous grant of permission SD14A/0157. Change of use of part first floor plan to create 2 addtional bedrooms, alterations and refurbishment of existing nursing home and all associated site works.
Installation of a 1.4m x 0.51m x 1.8m (LxWxH) above ground enclosure, to house a new natural gas DRI (District Regulating Installation) and a 3m high 'lamp post' style relief vent stack with all ancillary services and associated site works.
A new single storey extension to side and rear, together with new first floor extension to side, comprising Ground floor: new window to front playroom, and new kitchen; dining, loung3, island unit additional steel beams to enable remove pillar. First floor: comprising new bedroom4, New end-suite and walk in closet, together with new hipped roof as per existing.
The installation of a pedestrian gate at an existing pedestrian access point to a residential development.
4 2-storey, 3 bedroom houses including parking and related infrastructural works, alterations and widening of existing vehicular access gateway at the front of the site onto Crag Avenue within the curtilage of the Protected Structures at No's 6 & 7 Ballymanaggin Lane (RPS reference numbers are 117 & 121 respectively).
The development will consist of: • Provision of a drive-thru lane for the Costa Coffee unit, including a canopy and service hatch on the northwestern side of the unit, a height restrictor / entrance barrier on the access lane, 3.5m wide drive-thru lane, and associated hard and soft landscaping, • Provision of associated signage consisting of 2 no. directional signage, 1 no. order station, and 3 no. menu boards / advertisement signs; • Alterations to all elevations of the Costa Coffee unit, including the provision of new signage on all elevations; • Associated alterations to the existing car parking layout including the removal of 4 no. associated parking spaces, realignment of the pedestrian walkway and provision of a pedestrian crossing; • Alterations to the existing external bin storage unit • An increase of unit floor area of 8 sq.m; and • Alterations to landscaping, outdoor seating area, and all associated development.
Full demolition of existing two storey 463sq.m building to make way for future development, subject to future separate planning application.