The construction of new office space at first floor level including enclosing the existing access stairs (total area @ 87.915 sq./mts), all works proposed are ancillary to the use of the existing building and business.
Amalgamation of units F2 and F3 (with connecting doors at ground and first floor levels) and its use for warehouse and distribution with ancillary trade counter and showroom at ground and first floor levels; Retention of offices at second floor level which are ancillary to the overall warehouse operation; Retention of all signage and external illumination of the signage.
Construction of a temporary logistics and storage facility within the Clonburris NorthWest Development Area of the Clonburris Strategic Development Zone (SDZ) Planning Scheme 2019. The facility includes the provision of a logistics facility comprising a warehouse (single story pitched roof c.11.356 meters in height) and adjoining unit (single storey pitched roof c. 6.22m in height) with a combined Gross Floor Area of 1,411sq.m; The provision of a single-storey ancillary office and staff facilities to include an office (25sq.m), canteen/ changing area (24.8sq.m), and WC (9sq.m); Vehicular and pedestrian access from the Fonthill Road (R113) to the east, 24 car-parking spaces, 5 HGV setdown parking spaces and turning/loading areas and 18 bicycle parking spaces; All ancillary site development works including attenuation, footpaths, lighting, landscaping boundary treatments and signage; The logistics facility will exist for a temporary period of up to 10 years to facilitate the delivery and storage of building materials throughout the construction phases of the development of the entire Clonburris Strategic Development Zone; The logistics facility will not be open to the general public; This application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015 all on wider lands bounded generally by Thomas Omer Way (L 1059) to the north, the Dublin-Cork railway line to the south, the Fonthill Road (R 113) to the east and undeveloped lands to the west.
Demolition of existing single storey side garage extension and the erection of a 2 storey extension to the side with pitched roof over. A single storey front extension with pitched roof over and 3 rooflights. A single storey rear extension with flat roof over and 2 roof lights all for extended living accommodation.
Installation of an above ground water retention tank (13.1m x 8.1m x 2.85m high); underground water retention tank (8.3m x 3.70m x 5m deep) and balancing system, located at the south-east corner of the site including the diversion of surface water drains to the existing foul sewer system via the proposed tank and all site works associated with the proposed development.
Installation of an above ground water retention tank (13.1m x 8.1m x 2.85m high); underground water retention tank (8.3m x 3.70m x 5m deep) and balancing system, located at the south-east corner of the site including the diversion of surface water drains to the existing foul sewer system via the proposed tank and all site works associated with the proposed development.
Kelland Homes Ltd. intends to apply for permission for development on a site area of 6.3Ha, on lands within the townland of Cappagh, Dublin 22. The proposed development is located west of the Ninth Lock Road, south of the Dublin-Cork railway line, north of Cappaghmore housing estate and Whitton Avenue, and east of an existing carpark / park & ride facility at the Clondalkin Fonthill train station and the R113 (Fonthill Road). The proposed development is located within the Clonburris Strategic Development Zone (SDZ), within the development areas of (I) Clonburris South East (i.e. CSE-S1 & CSE-S2) and (ii) part of Clonburris Urban Centre (i.e. CUC-54), as identified in the Clonburris SDZ Planning Scheme 2019. The proposed development consists of the construction of 294 no. dwellings, creche and retail / commercial unit, which are comprised of: 118 no. 2, 3 & 4 bed, 2 storey semi-detached and terraced houses, 104 no. 2 & 3 bfd duplex units accommodated in 10 no. 3 storey buildings, 72 no. f' & 2 bedroom apartments in 2 no. 4 & 6 storey buildings, 1 no. 2 storey creche (c.520.2m2), 1 no. 2 storey retail /commercial unit (c.152.1m2).Access to the development will by via the permitted road network (under Ref. SDZ20A/0021) which provides access from the Ninth Lock Road to the east and the R113 (Fonthill Road) to the west. The proposed development will connect into the permitted Infrastructural works as approved under the Clonburris Strategic Development Zona Planning Scl1ame (2019) and permitted under Ref. SDZ20A/0021, with the proposed development connecting into the permitted surface water drainage attenuation systems i.e. 1 no. pond, 3 no. modular underground storage systems and 1 no. detention basin combined with modular underground systems. The proposed wastewater infrastructure will connect into a permitted foul pumping station and pipe network within proposed road corridors to facilitate drainage connections to future wastewater drainage infrastructure within the adjoining SOZ lands (Including future Irish Water pumping station permitted under SDZ21A/0006). The proposed development also provides for all associated site development works above and below ground, public & communal open spaces, hard & soft landscaping and boundary treatments, surface car parking (401 no. spaces), bicycle parking (797 no. spaces), bin & bicycle storage, public lighting, plant (M&E), utility services & 4 no. ESB sub-stations. This application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015.
Office accommodation extension to the rear of the existing office building (455sq,m at ground floor, 33.2sq.m at first floor); covered bicycle parking area to the front of the existing building 25.2sq.m; all necessary associated ancillary ground and drainage works.
Change of use of 464sq.m of warehouse mezzanine storage, approved under planning reference SD18A/0031, to office use, as well as associated and ancillary internal works, elevational changes and external ground works to facilitate this new use.
Construction of a two-storey flat-roof extension to the side and rear of the existing dwelling, incorporating new side access door and new side and front-facing windows at ground and first floor levels.
The development will consist of the demolition and removal of the existing single storey and temporary buildings on site and, the construction of a Community Centre and Place of Worship ( Mosque ) in a detached part single storey and part two storey building, part pitched and part flat roofed, incorporating solar PV panels and a feature minaret and dome on / over roofs levels, and including the following within the building envelope: Entrance and circulation spaces, reception / refreshment zone, 2 no. retailing / services units, a prayer room and gallery, a multi-purpose events room, 1No. three bedroomed apartment, community health / medical consulting rooms, administrative spaces, a room as a library / book store / meeting room, enclosed car parking and supporting services spaces including for such uses as, toilets and for ablutions, tea stations, storage, service plant, etc. On site but external to the building will be the main vehicular and pedestrian site entrances including gates in the new northern boundary, pedestrian and vehicular circulation routes, boundary treatments including walls and fencing, car and bicycle parking, a small service yard, a community clothes recycling bank, hard and soft landscaped areas including a children's play space etc.
Demolition of two existing unoccupied, unused and dilapidated single storey buildings and the construction of a Community Centre and Place of Worship (Mosque) in a detached three storey over basement building (basement, ground, first and second floors), part pitched and part flat roofed, incorporating solar PV panels and a feature minaret and dome on/over roof levels and including: (a) at basement level - circulation spaces, car parking, bicycle parking, exercise room, service rooms, service plant and bin storage; (b) at ground floor level - main entrance and circulation spaces, administrative spaces, toilets and ablutions areas, storage rooms, tea stations, mortuary, prayer room with supporting service rooms, 2 classrooms, a library/book store, 3 retailing/services units, child minding rooms; (c) at first floor level - circulation spaces, administrative spaces, toilets and ablutions areas, 2 apartments, community health rooms, events room, kitchen/servery, prayer gallery overlooking the prayer room; (d) at second floor level - circulation spaces, administrative spaces, toilets, restaurant, kitchen; external to the building will be main vehicular and pedestrian site entrances including gates in the new northern boundary, limited car and bicycled parking, ramp entrance/exit to & from the underground basement car park, service yard, external circulation, children's play space, hard and soft landscaped areas, boundary treatments including walls and metal fencing; the areas and locations of each use will be shown on the drawings proposed to be lodged with the planning application and the times of use and occupancy of each are listed within written documents to be lodged with the planning application.
Permission sought for a 2.4-metre-high steel palisade fence and gate at south side of St. Oliver's Training Centre, Cloverhill Road, Dublin 22.
Demolition of existing single storey garage building and construction of new single storey 3 bed extension to side and rear of existing dwelling with w/c shower room.
Kelland Homes Ltd. seeks permission for development, consisting of elevational changes and alterations to an apartment building (known as Block A) permitted under Ref. SDZ22A/0010. Permission is sought to (I) replace previously approved recessed balconies on the east and west facades with proposed cantilevered balconies and associated elevational and internal amendments, (ii) incorporation of ESB substation & meter room into the ground floor plan of the building and associated internal modifications, (iii) revisions to external materiality, and (iv) all associated site development works, car parking, open spaces & landscaping etc., all on a site measuring c.0.27Ha, located at "Keepers Lock", Clon Burris, Dublin 22, within the Clon Burris Strategic Development Zone (SDZ). This application is being made in accordance with the Clon Burris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clon Burris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015.
Kelland Homes Ltd seeks permission for retention development, consisting of the replacement of permitted railing located to the rear of 8 no. duplex blocks under grant of permission SDZ22A/0010 with a proposed dividing wall measuring 1.8m in height sloping down to 1.1m on the overall site measuring 0.1ha located within Keepers Lock Clonburris Dublin 22.
Planning permission is sought for single storey building to side / front garden of existing house, new building for home office / playroom facility and all associated site works
Part single, part two storey extension to front, side and rear of existing dwelling consisting of 1 bedroom and enlargement of bathroom on first floor; single storey consisting of enlargement of kitchen with new double doors and additional bedroom with wet room and lounge area to side and all associated site works.
The proposed development will consist of the temporary storage of inert soil and stone generated by construction and development activity and imported as waste under licence or as by-product (in accordance with Article 27 of the European Communities (Waste Directive) Regulations 2011 (as amended)) as a non-waste by-product on a 3.87-hectare site within the Clonburris North-West Development Area of the Clonburris Strategic Development Zone (SDZ) Planning Scheme 2019. The proposed development will include for: i. The provision of temporary soil and stone storage for later re-distribution and use within the Clonburris SDZ; ii. The proposed fill material will be stored in 2 no. stockpiles of c.90,000m3 and 18,000m3. iii. The proposed 2 no. stockpiles will provide for a combined c.108,000m3 of material to be stored on site and will be c.6m in height; iv. Vehicular and pedestrian access will be provided via approved access off the Fonthill Road (R113), which will also serve the Logistics Facility as approved under Reg. Ref. SDZ23A/0016. The proposed inert soil and stone stockpiles will be temporary in nature and will be operational for an anticipated 7-year time period. It will then be decommissioned, and the subject lands will be restored and developed in line with the Clonburris Strategic Development Zone Planning Scheme 2019.
A single Storey extension to the side of the house and all ancillary site works
Retention for ground floor rear Extension and permission for extension to first floor at rear and all ancillary site works
Two storey extension to the rear of existing dwelling, to include rooflights and all ancillary site works.
Two storey extension to the rear of existing dwelling to include roof lights and all ancillary site works.
Amendments to previous grant of permission SD14A/0157. Change of use of part first floor plan to create 2 addtional bedrooms, alterations and refurbishment of existing nursing home and all associated site works.
Installation of a 1.4m x 0.51m x 1.8m (LxWxH) above ground enclosure, to house a new natural gas DRI (District Regulating Installation) and a 3m high 'lamp post' style relief vent stack with all ancillary services and associated site works.
Construction of 2 two and a half storey, three-bedroom terrace houses and associated site works attached to the existing two and a half storey house at No. 6 Station Grove which was constructed in 2006; the 2 houses will complete this partially finished housing development which was originally granted permission under planning reference SD05A/0125.
Ecomondis Ireland Unlimited Company intend to apply for permission for retention of development and permission for development at Greyhound Recycling, Crag Avenue, Clondalkin Industrial Estate, Clondalkin, Dublin 22 The development to be retained consists of the constructed logistics office (c.74.5 sq.m), weighbridge office (c.40 sq.m), logistics ablution (c.28.5 sq.m), logistics canteen (c.23.75 sq.m), site canteen! laundry (c.42 sq.m), site ablution (c.40 sq.m), air handling plant featuring carbon stack of height c.16.6 metres (c. 335 sq.m), annexe building featuring chimney of height c.14 metres (c. 153 sq.m), rainwater tank (c. 7.0 sq.m) and generator room (c. 25.3 sq.m). Elements of the buildings for retention are associated with permitted development on site (SD03A/0838 and SD06A/0404) that require a waste license from the regulatory authority. The development proposed consists of the construction of 1 no. new service garage building c. 11.60 metres in height with a gross floor area of c. 636 sq.m and all associated site development works above and below ground necessary to facilitate the proposed development on this site of c.4.476 ha.
The development will consist of the construction of an extension of c.650 sq.m to an existing industrial unit and all associated site development works. The proposed extension shall be used for storage of dry mixed recyclable waste prior to shipping.
We, Alucraft Ltd, make application to South Dublin County Council for permission. FOR RETENTION of development at this site address: Unit AF4O, Cloverhill Industrial Estate, Clondalkin, Dublin, D22 HY51, for alterations to permitted development under Reg. Ret: 91A/1082, 90A/734, 89A/50, 85A/505, T.A.562., R.A. 1123 and R.A. 1098, comprising of the following: 1. 1 No. 3-sided bike shelter with polycarbonate roof and wall sheets measuring 16.5 sq.m GFA to front of building, 2. 1 No. 3.83M High prefabricated structure comprising of additional office space measuring 76.8 sq.m GEA to front of building, 3. 1 No. 7.61M High, permanent storage enclosure with loading bay measuring 178.42 sq.m GEA to rear of building, 4. 1 No. 2.74M high prefabricated structure comprising of additional WC provision measuring 18.11 sq.m GFA to rear of building connected to existing foul sewer, 5. 1 No. 2.74M high prefabricated structure comprising of additional WC provision measuring 13.47 sq.m GFA to rear of building connected to existing foul sewer, 6. 1 No. 6.54M high permanent loading platform enclosure, measuring 100.95 sq.m GEA to rear of building, 7. 1 No. 3.31M (H) glazed curtain wall entrance porch/lobby to main reception measuring 9.11 sq.m GFA to front of building, 8. 1 No. 2.87M (H) glazed curtain wall entrance porch/lobby to main reception measuring 6.63 sq.m GFAto front of building, and all associated ancillary site works on an overall site area of 2.23 hectares.
4 2-storey, 3 bedroom houses including parking and related infrastructural works, alterations and widening of existing vehicular access gateway at the front of the site onto Crag Avenue within the curtilage of the Protected Structures at No's 6 & 7 Ballymanaggin Lane (RPS reference numbers are 117 & 121 respectively).
Retention for the partial change of use into a childcare facility and all ancillary site works.
The development will consist of amendments to the permitted development as approved by South Dublin County Council under Planning Reg. Ref. SDZ22A0018 comprising in the Clonburris Development Areas CUCS3 & CSWS3 of the Clonburris SDZ Planning Scheme 2019 as follows: A) Reconfiguration of internal arrangement in Block E to allow for the replacement of 5 no. permitted 1 bedroom apartments with 5 no. 2 bedroom apartments at first floor to fifth floor levels within Block E (facing internal courtyard), and the replacement of 2 no. 1 bedroom apartments with 2 no. 2 bedroom apartments at ground floor level of Block G and H to result in an overall mix of 257 no. 1 bedroom apartments, 318 no. 2 bedroom apartments and 32 no. 3 bedroom apartments (no change to overall no. of permitted apartments) and all associated elevation changes; B) Reconfiguration and amendment to floor areas of retail/café/retail service units and associated alterations to internal podium level to result in an overall increase of c. 51 sq. m of Gross Floor Area (an overall increase from 1,150 sq. m to 1,201 sq. m), and all internal reconfigurations; C) Inclusion of green roof in place of pitched roof along portion of Block A (eastern block - no change to internal arrangements or profile fronting onto external street); D) Amendments to undercroft car parking arrangements to now provide 378 no. car parking spaces (compared to 385 no. car parking spaces permitted) and alterations to cycle parking in bike stores and surface spaces to now provide 1,620 no. cycle spaces (compared to 1,548 no. cycle spaces permitted) and all internal/external reconfigurations.
Construction of a mixed-use development comprising 594 apartments, office floorspace, 4 retail units, a creche and urban square in the Clonburris Development Areas CUCS3 & CSWS3 of the Clonburris SDZ Planning Scheme 2019 as follows, 594 apartments (255 one bedroom apartments, 307 two bedroom apartments and 32 three bedroom apartments (all apartments to have terrace or balcony; ancillary communal amenity spaces for residents) as follows; Block A (4 and 6 storeys with undercroft) comprises 96 apartments consisting of 36 one bedroom apartments, 48 two bedroom apartments and 12 three bedroom apartments (with creche c. 609sq. m at ground and first floor as well as play area; Block B (6 storeys with undercroft) comprises 77 apartments consisting of 44 one bedroom apartments, 28 two room apartments and 5 three bedroom apartments; Block D (5 and 7 storeys with undercroft) comprises 71 apartments consisting of 39 one bedroom apartments and 32 two bedroom apartments; Block E (6 storeys with undercroft) comprises 100 apartments consisting of 47 one bedroom apartments, 48 two bedroom apartments and 5 three bedroom apartments; Block F (5 and 7 storeys with undercroft) comprises 124 apartments consisting of 57 one bedroom apartments, 61 two bedroom apartments and 6 three bedroom apartments; Block G (1, 2 and 4 storeys with undercroft) comprises 65 apartments consisting of 16 one bedroom apartments, 45 two bedroom apartments and 4 three bedroom apartments; Block H (4 storeys with undercroft) comprises 61 apartments consisting of 16 one bedroom apartments and 45 two bedroom apartments; Mixed use development comprising, commercial office development in Block C of 6 storeys with parapet above to 7 storey equivalent on elevations (c. 4,516sq.m), 1 retail unit at ground floor of Block B (c.147.5sq. m) and 3 retail units at ground floor of Block E as follows (c.106.2sq.m, c.141.6sq.m and c.492.2sq.m respectively) as well as a creche (c. 609sq. m) at ground floor and first floor of Block A; Vehicular access will be from the permitted Clonburris Southern Link Street (SDZ20A/0021) and R 113 to the east; Public Open Space/landscaping of c. 0.52 hectares (urban square) and linear open space (0.72 hectares) as well as a series of communal open spaces to serve apartments over undercroft level (and internal communal open space c. 685 sq.m; The development will also provide for all associated works and infrastructure to facilitate the development to include all ancillary site development works including footpaths, landscaping boundary treatments, public, private open space areas, car parking (396 no. spaces in a mixture of undercroft spaces Block A, Block B&D and Block E&F) and bicycle parking (1,232 spaces at undercroft and surface levels), single storey ESB substations/bike/bin stores, green roofs, solar panels at roof level of apartments, plant areas within blocks and all ancillary site development/construction works; Permission is also sought for connection to water supply, and provision of foul drainage infrastructure. This application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clonburris Strategic Development Planning Scheme Area ' as defined by Statutory Instrument No. 604 of 2015; An Environmental Impact Assessment Report accompanies this planning application.
The development consists of a two-storey extension to the side, a single-storey extension to the rear, a rear dormer roof, and necessary ancillary work to facilitate the development.
Alterations to previous approved planning application, Reg. Ref. SD15A/0105, consisting of: construction of a new single storey flat roof modular changing facilities (293sq.m) ancillary to the existing playing pitch; relocation of approved 38 carparking spaces and 2 coach parking bays from northern boundary to the eastern boundary adjacent to Cloverhill Road installation of new overhead flood lights; 3 new flag poles; continuation of previously permitted boundary wall and footpath (Reg. Ref. SD15A/010) extending along the south eastern boundary, with addition of new security fencing added to top of wall, all adjacent to Cloverhill Road; new entrance gates (accessed via the permitted entrance off Cloverhill Road); all associated boundary treatment, landscaping and ancillary works necessary to facilitate the development.
Change of use from haulage yard to filling station open to the public; additional diesel pumps; palisade fencing; illuminated and non-illuminated signage; all associated site and development works.
Sub division of existing site for the construction of a semi-detached 2 storey house, connection to public foul sewer, amendment of existing boundary walls and new vehicular entrance arrangement for existing and proposed house and all associated site works.
Internal separation of the house and associated granny flat to provide for 2 permanent houses and extension of rear garden. Part of the development site is located within the Clonburris Strategic Development Zone.
Internal separation of house and associated granny flat to provide for 2 permanent houses.
Full demolition of existing two storey 463sq.m building to make way for future development, subject to future separate planning application.
An attic conversion. Alterations to the existing hipped roof and dormer window to the rear
Alterations to the previously approved SD24B/0131. A first floor extension to the Front side and rear over the existing Converted Garage. Alterations to the existing hipped roof and the roof be extended over the proposed extension. With conversion of the enlarged Attic and Dormer window to the rear
Retention of replacement single storey pitched roof office building (183.7sq.m) and associated site works; the original flat roofed office building comprised 132sq.m; totem sign 1.37m wide x 5m high.
Revision of previously approved planning SD09A/0313 including increase the number of children attending the playschool to 16 (maximum) in any one session; change opening hours to 9am - 12pm (morning session) and 12:30pm - 3:30pm (afternoon session), Monday to Friday; minor internal changes to the playschool; all associated site works.
To change condition No. 4 of Planning Application SD20A/0062 to increase the number of children attending any one session from 16 to 20
Footpath within the western and southern boundaries of the site; erection of a new palisade fencing of 2.4m in height along the southern and western site boundary and a new pedestrian access gate from the north end of the site boundaries at Crag Avenue; single storey, detached vehicle control structure; provision of hard standing at the north west corner of the site; erection of 7 flood light poles and lights along the southern and western boundaries of the site; all associated site development and engineering works.
Retention of existing self-service laundromat facility.
Car wash & car wash plant room with water recycling system; re-location of the main ID sign and all associated structures, drainage and site development works.
Conversion of attic to storage including changing existing hipped end roof to a gable end roof; dormer window to the rear and a window to the new side gable wall, all at roof level.
Retention permission and continuation of use of a former double height warehouse within their building as 426.6sq.m of office use, over two floors as well as all associated and ancillary elevation changes.