to
to

Planning records

Showing 51-100 of 30,860 public records
Page 2 of 20
F21B/0256

1. Loft conversion including dormer structure with window to rear roof profile and Velux rood windows to front and side roof profiles. 2. The construction of a single storey kitchen extension to rear and all associated site works.

34 Boru Court, Swords, Co. DublinFingal County CouncilPermission0 reasons0 conditions0.5 km away
Granted24 August 2021
F22B/0049

Construction of a front canopy extension, two storey side extension, attic conversion with rear dormer window and all associated site works

9 River Valley Close, Swords, Co.Dublin, K67AY75Fingal County CouncilPermission0 reasons0 conditions0.5 km away
Granted04 April 2022
F21B/0217

Single storey porch extension to front.

11 Rivervalley Court, Swords, Co. Dublin, K67 PX71Fingal County CouncilPermission0 reasons0 conditions0.5 km away
Granted23 July 2021
F21B/0216

Construction of a single storey porch extension to front.

15 Rivervalley Court, Swords, Co. Dublin, K67 Y430Fingal County CouncilPermission0 reasons0 conditions0.5 km away
Granted23 July 2021
F21B/0340

Permission for the construction of a new attic conversion

14 Rivervalley Road, Swords, Co DublinFingal County CouncilPermission0 reasons0 conditions0.5 km away
Granted29 November 2021
F20B/0250

Permission for an attic conversion which includes installing a dormer window to rear and a velux window to the front of a semi-detached house.

16 River Valley Court, Swords, Co DublinFingal County CouncilPermission0 reasons10 conditions0.5 km away
Granted23 November 2020
F24A/0980E

The development will consist of the construction of a two-bedroom single storey Parish Priest accommodation of 132 sq.m. as an extension to the southwest of the existing church building. The proposed Parish Priest Accommodation is linked directly to the existing church and previously granted Parish centre via a covered walkway. The Parish Centre extension was granted under ABP REF: 314040-22, 3 No. parking spaces and all associated landscaping and site works.

St. Finian's Church, River Valley Parish, Swords, Co. Dublin, K67KC67Fingal County CouncilPermission0 reasons0 conditions0.5 km away
Refused18 December 2024
F21B/0121

Permission for conversion of existing attic space to storage area with new revised roof profile (from hipped to gable end) to side/rear, a rear flat-roofed box dormer with window, internal modifications and associated site works.

68 Boru Court, Forest Road, Swords, Co. Dublin, K67 RP23Fingal County CouncilPermission0 reasons0 conditions0.5 km away
Granted28 May 2021
F22A/0225

Permission sought to demolish existing porch to front, to provide new windows to existing front and side walls, remove existing front door, remove existing roof and replace existing roof structure and roof tiles to match existing, to demolish existing chimneys, to demolish all existing partition walls, and build new partition walls on new concrete floor, existing floor to be removed throughout, and provide new 200mm concrete floors with 100 mm insulation and damp proof membrane, on sand blinding on 150mm hardcore. Existing external walls not being demolished to be treated for dampness by D.P.C. injection system and removal of mould by specialist company. Demolition of existing single storey flat roof extension to rear and side of existing, New single storey extension to rear and side of existing cottage, complete with triple glazing to new windows and doors. New flat roof to support twelve no. solar panels concealed behind new parapet walls finished with new pressed metal capping to new parapet. New geotextile lined surface water soakaway to BRE 365 Design. Together with new detached, tiled, pitched roof garage to rear of site. AI received 7/9/2022 CAI received 6/10/2022

No. 1 Hill Gardens, Bells Lane, Forest Road, Swords, Co.Dublin.Fingal County CouncilPermission0 reasons0 conditions0.6 km away
Granted26 October 2022
F22B/0185

Planning permission is sought for 3 no. skylights on front (West) roof elevation

25, Glebe Hill, Brackenstown Road, Swords, DublinFingal County CouncilPermission0 reasons0 conditions0.6 km away
Granted18 October 2022
F21B/0205

Conversion of existing attic space to storage room with new dormer extension to side/hipped end of existing roof and 2 no. velux roof lights to be fitted to the existing roof to the front.

12 The Nurseries, Forest Road, Swords, Co Dublin, K67 FH10Fingal County CouncilPermission0 reasons0 conditions0.6 km away
Granted21 July 2021
F21B/0384

Retention Planning Permission for roof window to front of existing roof. Planning permission for an attic conversion to non-habitable storage space with 4 no. roof windows to side of existing roof and 2 no roof windows to rear roofs with ancillary works.

3 Forest Avenue, Swords, Co Dublin, K67 Y4X8Fingal County CouncilPermission and Retention0 reasons0 conditions0.6 km away
Granted18 January 2022
F26A/0096E

Planning Permission for the construction of a dormer window to the rear of dwelling and two number Velux style windows to the front of the dwelling.

28 Brackenstown Village, Swords, Co. Dublin, K67 F6E4Fingal County CouncilPermission0 reasons0 conditions0.6 km away
Granted02 April 2026
F21A/0654

The development will consist of the construction of

St. Finian's Church, River Valley Parish, Swords, Co DublinFingal County CouncilPermission0 reasons0 conditions0.6 km away
Granted14 June 2022
F26A/0200

The development will consist of the construction of a dormer to the North side, the construction of a dormer to the East side & 2 number roof lights to the South side of the existing roof, all to accommodate an attic conversion to the existing two storey semi-detached dwelling.

32 The Nurseries, Forest Road, Swords, Co.DublinFingal County CouncilPermission0 reasons0 conditions0.6 km away
Granted12 May 2026
F23A/0170

Planning permission for conversion of existing attic space comprising of modification of exisiting roof structure raising of existing gable c/w window, new access stairs, 2no. roof windows to the front and flat roof dormer to the rear at 38 The Nurseries, Forest Road, Swords, Co. Dublin, K67 W866.

38 The Nurseries, Forest Road, Swords, Co. Dublin, K67 W866Fingal County CouncilPermission0 reasons0 conditions0.6 km away
Granted12 June 2023
F26A/0270E

Permission for dormer and single storey extension at rear and increasing existing overall roof ridge height. Two number velux roof windows to front and one number new window at side at first floor level.

4 Cherry Avenue, Swords, County Dublin, K67 R860Fingal County CouncilPermission0 reasons0 conditions0.6 km away
Granted26 May 2026
F22B/0012

Permission for a two storey, semidetached house, to remove the French door on the ground floor that leads to the external access corridor to the rear garden, to be replaced with a wall and the construction of a new structure to house the boiler.

73, Boroimhe Birches Cremona, Swords, Dublin, K67 KW18Fingal County CouncilPermission0 reasons0 conditions0.6 km away
Granted03 March 2022
F19B/0332

Build new 2 storey extension to side of existing dwelling, with change of roof type from hip-roof to new gable end dutch-hip roof, together with new flat roof dormer extension & window to rear & 1 Nr. velux rooflight to rear & 1 Nr. velux rooflight to front with new windows to front at ground level. Internal alterations to include new stair access to first floor and associated site works.

26 Forest Avenue, Swords, Co. Dublin.Fingal County CouncilPermission1 reasons0 conditions0.6 km away
Visual Amenity
Refused29 July 2020
F23A/0255

Retention planning permission for the existing Portacabin Units A, B & E located along the South West Boundary of the site.

Holy Family Senior National School ( along the south west Boundary ofFingal County CouncilRetention0 reasons0 conditions0.6 km away
Granted04 July 2023
F20A/0336

Widen existing double pedestrian access gate onto Forest Park by extending existing gate by 1 No. additional pedestrian gate of 1500mm(w) X 2400mm(h) and provision of 1 No. new double pedestrian access gate onto Forest Dale of 3125mm(w) X 2400mm(h) plus replacement of existing Temporary School Buildings marked B&E with 2 No. similar sized units marked as G&H to include reorientation of Unit D (all previously approved under Planning Ref: F17A/0676), plus retention permission is sought for Unit F. To include all necessary site works. Add Info receiveed 22nd February 2021. Add Info deemed Significant 24th February 2021. Revised Public Notices received 12th March 2021.

Holy Family Senior National School, River Valley, Swords, Co. Dublin.Fingal County CouncilPermission and Retention0 reasons0 conditions0.6 km away
Granted08 April 2021
F25A/1099E

The proposed development will consist of the following: 1) Conversion of existing single storey garage to provide for a home office, W.C. and utility room at ground floor level together with a new separate internal passageway connecting the front and rear of existing property. 2) Construction of second storey hipped roof extension over existing garage to provide 1 no. bedroom and en-suite at first floor level. 3) Modifications to front elevation at ground and first floor level to comprise 2 no. new windows and 1 no. new replacement door opening. 4) Modifications to rear elevation at ground and first floor level equally to comprise 2 no. new windows and 1 no. new replacement door opening. 5) Removal of shared chimney with 68 Saint Columba's Rise, Swords, Co. Dublin, K67 D2F7. 6) All associated site works.

70, Saint Columba's Rise, Swords, Co. Dublin, K67 K6C3Fingal County CouncilPermission0 reasons0 conditions0.6 km away
Granted27 January 2026
F20A/0098

The demolition and removal of 4 no single storey sheds/ancillary residential buildings and 1 no. glass house, all located to the rear of the existing property.

Saint Anthonys, 51 Dublin Road, Swords, Co. DublinFingal County CouncilPermission0 reasons0 conditions0.6 km away
Granted10 June 2020
F22A/0575

The development will consist of; (i) demolition of 4 no. sheds/ancillary residential storage buildings and glass house; (ii) construction of 4 no. semi-detached single-storey, two bedroom dwellings to rear (east) of site each served by private garden to rear; (iii) revision of existing front garden vehicular parking area serving No. 51 Dublin Road to provide 2 no. separate vehicular parking areas (providing a total of 6 no. car parking spaces) and new front garden area for No. 51 Dublin Road; (iv) revision/relocation of existing northern vehicular entrance and provision of new pedestrian entrance - both to serve the proposed dwellings; (v) provision of new pedestrian/bicycle access lane to serve proposed dwellings via Dublin Road; (vi) provision of communal amenity space (900 sq.m) and bin storage area to serve the proposed dwellings; and, (vii) associated boundary treatment, landscaping, SUDS drainage and all other ancillary development works necessary to facilitate the development.

St. Anthony's, No. 51 Dublin Road, Swords, Co. DublinFingal County CouncilPermission0 reasons0 conditions0.6 km away
Refused13 December 2022
F20A/0594

Change of use from existing residential to Community Health Clinic with ancillary offices. The Community Health Clinic development consists of internal alterations to the existing ground floor including the provision of consultant, nurse and treatment rooms, 1 no. accessible WC, 1 no. other WC and a reception/waiting area with a 12 sq. meter extension forming a new main entrance to the rear. Ancillary office, staff and storage areas for the Health Clinic are to be located on the first floor. 6 no. additional car parking spaces will be provided in the rear yard with new vehicular and pedestrian access gates to be located on Park Avenue. Add Info received 8th March 2021. AI deemed significant 15/03/21 Revised notices received 06/04/21

29/30 Brackenstown Village, Swords, Co DublinFingal County CouncilPermission0 reasons0 conditions0.6 km away
Granted28 April 2021
F24A/1187E

Construction of a dormer to the side of existing roof profile.

21, The Nurseries, Forest Road, Swords, Dublin, K67 X278Fingal County CouncilPermission0 reasons0 conditions0.6 km away
Granted17 February 2025
F25A/0612

The development will consist of: (i) Construction of a residential development comprising a total of 8 no. terraced houses across 2 no.two-storey blocks (Blocks No.1. No.2), and an extension to the rear and partial demolition of the existing 3-bedroom house resulting in a 2-bedroom house, Block No.1 will contain 2 no. 3-bedroom houses and 3 no. 2-bedroom houses. Block No.2 will contain 2 no, 3-bedroom houses and 1 no. 2-bedroom house; (ii) communal open space; (iii) new pedestrian access from Dublin Road; (iv) provision of 18 no. car parking spaces, including 1 no. accessible parking space; (v) provision of a total 36 no. bicycle parking spaces including 32 no. resident spaces and 4 no. visitor spaces; (vi) provision of internal access road and bins stores; (vii) all ancillary works inclusive of drainage, landscaping and boundary treatments necessary to facilitate the development.

Rosario, Dublin Road, Swords, Co. Dublin, K67 D6C8 and Saint Anthonys,Fingal County CouncilPermission0 reasons0 conditions0.6 km away
Refused01 September 2025
F25A/0018E

(1) the construction of a new 4 bedroom 2 storey dormer bungalow dwelling incorporating a double garage (217.5m² gross floor area) to the rear of the existing house, (2) the construction of a new driveway access to the side of the existing house connecting to the existing entrance at the public road, (3) The subdivision of the plot by a new screen fence, (4) the provision of private open space to the new dwelling of 79.7m², (5) the construction of a new soakaway rainwater drainage system serving the proposed dwelling, (6) a new foul drainage connection to the existing sewer, (7) all other site development works, on a site with an area of 0.11 Hectares at No. 8 Windmill Lands, Swords, Co. Dublin, K67 Y3C4.

8 Windmill Lands, Swords, Co. Dublin, K67Y3C4Fingal County CouncilPermission0 reasons0 conditions0.6 km away
Granted05 March 2025
SHD/013/21

ABP-313223-22 The development will consist of the following: (i) demolition of the existing 1-3 storey public house, restaurant, off-licence and associated storage buildings (totalling 1,197sq.m) and removal of associated surface car park; (ii) construction of a residential development of 146 no. apartments (69 no. one-bedroom, 68 no. two-bedroom and 9 no. three-bedroom) in 4 no. blocks (ranging in height from four to sixstoreys over basement level) as follows:-Block A containing 15 no. apartments (3 no. one bedroom, 9 no. two bedroom and 3 no. three-bedroom) and measuring four storeys in height;-Block B containing 41 no. apartments (23 no. one bedroom, 17 no. two bedroom and 1 no. three bedroom) and measuring part-five part-six storeys in height;-Block C containing 54 no. apartments (33 no. one bedroom, 16 no. two bedroom and 5 no. three bedroom) and measuring part-five part-six storeys in height; and,-Block D containing 36 no. apartments (10. no one bedroom and 26 no. two bedroom) and measuring part-four part-five storeys in height. (ii) all apartments will have direct access to an area of private amenity space, in the form of a terrace/balcony, and will have shared access to internal communal amenities including a gym (211sq.m), communal store rooms (158sq.m) and a cinema/playroom (89sq.m), 3,551sq.m of external communal amenity space and 2,041sq.m of public open space; (iii) provision of 109 no. vehicular parking spaces (including 5 no. mobility parking spaces, 5 no. car-share spaces and 11 no. electric charging spaces), 6 no. set-down parking spaces and 332 no. bicycle parking spaces at basement level accessible via new vehicular access from Church Road; (iv) provision of 5 no. commercial units (746sq.m total) located at basement/ground floor level in Blocks A and B; and 1 no. childcare facility (424sq.m) located within the basement level of Block C; (v) removal of existing culverts, installation of new culverts to facilitate pedestrian/vehicular access and diversion of the Glebe Stream on site; and, (vi) all ancillary works including public realm/footpath improvements, landscaping, boundary treatments, internal footpaths, provision of surface level bicycle parking (56 no. spaces), bin storage, foul and surface water drainage, green roofs, ESB substation and all site services, site infrastructure and associated site development works necessary to facilitate the development. A Natura impact statement has been prepared in respect of the proposed development. The application contains a statement setting out how the proposal will be consistent with the objectives of the relevant county development plan and local area plan. The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land.

The Lord Mayor's Public House, Main Street, Swords, Co Dublin, K67 W8NFingal County CouncilStrategic Housing Development0 reasons0 conditions0.6 km away
Granted03 April 2023
F24A/1027

The development will consist of: (i) Construction of a residential development comprising a total of 24 no. units across 4 no. three storeys Apartment (Blocks 1-4). Each Block will contain 2 no.1-bedroom apartments and 4 no. 2-bedroom apartments; (ii) Private amenity space will be provided to serve each apartment unit in the form of a balcony/terrace; Communal open space to serve the proposed apartment blocks is provided to the South-West and North-West; (iii) New vehicular and pedestrian access to the site is proposed off Carlton Crescent to the North; (iv) provision of 13 no. car parking spaces, including 1 no. accessible parking space; (v) provision of a total 54 no. bicycle parking spaces, including 38 no. resident spaces and 16 no. visitor spaces; (vi) provision of internal access road and bin storage; (vii) all ancillary works inclusive of drainage, landscaping and boundary treatments necessary to facilitate the development.

Rosario, Dublin Road, Swords, Co. Dublin and Saint Anthonys, 51 DublinFingal County CouncilPermission0 reasons0 conditions0.6 km away
Refused23 January 2025
SHD/020/19

To view details of this Strategic Housing Development please visit www.mainstreetswordsshd.com. ABP-306771-20 (i) Demolition of the existing 1-3 storey public house, restaurant and off-licence and associated storage buildings (totalling 1,197 sq.m. and removal of associated car park; (ii) Construction of a residential development providing a total of 172 no. residential apartments (comprising 67 no. one-bed units, 101 no. two-bed units and 4 no. two-bed units) in 4 no. four-seven storey blocks over basement. Each apartment has associated private open space in the form of a ground floor terrace or balcony and has access to 3 no. communal amenity spaces (totalling 296 sq.m.), including a communal gym (77 sq.m), and a ground floor level landscaped courtyard. The development is served by an underground carpark (accessed from Church Road) providing a total of 132 no. parking spaces (including 6 no. mobility impaired user parking space and 5 no. club car parking spaces), and 408 no. bicycle spaces (336 no. resident spaces at basement level and 72 no. visitor spaces at ground floor level in the central courtyard; (iii) 2 no. commercial units (comprising 394 sq.m. and 296 sq.m. and accommodating Class 1,2 and 8 uses as per the Planning & Development Regulations, 2001-2019, as amended); a c235 sq.m. creche and 87sq.m café at ground floor level; (iv) removal of existing culverts, installation of new culverts to facilitate pedestrian and vehicular access and diversion of the Glebe Stream on site; and (v) associated site and infrastructural works are also proposed which include: foul and surface water drainage; attenuation tanks; lighting; landscaping; boundary fences; plant areas; ESB substations; internal hard landscaping, including footpaths and street furniture; and all associated site development works. A Natura Impact Statement has been prepared in respect of the proposed development. Please note all submissions to be lodged with An Bord Pleanála, 64 Marlborough Street, Dublin 1 and must be accompanied by the prescribed fee of €20.00.

The Lord Mayor's Public House, Main Street, Swords, Co. Dublin, K67 W8Fingal County CouncilStrategic Housing Development0 reasons0 conditions0.7 km away
Refused28 July 2020
SHD/002/20

ABP-313331-22 To view details of this development please visit www.fosterstownnorthshd.ie A 7 year planning permission for s Strategic housing Development. The application site has an area of c. 4.635 ha and is bound by the R132 to the east, the existing Boroimhe residential development to the south and west, and the Gaybrook stream and a greenfield site to the north. The proposed development comprises a Strategic Housing Development of 645 no. residential units (comprising 208 no. 1 bedroom units, 410 no. 2 bedroom units, and 27 no. 3 bedroom units), in 10 no. apartment buildings, with heights ranging from 4 no. storeys to 10 no. storeys, including undercroft / basement levels (for 6 no. of the buildings). The proposals include 1 no. community facility in Block 1, 1 no. childcare facility in Block 3, and 5 no. commercial units (for Class 1-Shop, or Class 2- Office / Professional Services or Class 11- Gym or Restaurant / Café use, including ancillary takeaway use) in Blocks 4 and 8. The development will consist of the following: • Block 1 comprises 29 no. residential units, within a four storey building (with a pitched roof), including 8 no. 1 bedroom units and 21 no. 2 bedroom units. A community facility (191.8 sq.m) is provided at ground floor level. • Block 2 comprises 23 no. residential units, within a four storey building (with a pitched roof), including 8 no. 1 bedroom units and 15 no. 2 bedroom units. • Block 3 comprises 24 no. residential units, within a four storey building (with a pitched roof), including 6 no. 1 bedroom units and 18 no. 2 bedroom units. A childcare facility (609.7 sq.m) is provided at ground floor level. • Block 4 comprises 93 no. residential units, within a part seven, part eight, and part nine storey building, with an undercroft level, including 34 no. 1 bedroom units, 54 no. 2 bedroom units, and 5 no. 3 bedroom units. 3 no. commercial units (with a GFA of 632.2 sq.m) are provided at ground floor level. • Block 5 comprises 91 no. residential units, within a part six, part seven, and part eight storey building, with an undercroft level, including 34 no. 1 bedroom units, 55 no. 2 bedroom units, and 2 no. 3 bedroom units. • Block 6 comprises 54 units, within a part eight, part nine storey building, with an undercroft level, including 13 no. 1 bedroom units, 38 no. 2 bedroom units, and 3 no. 3 bedroom units. • Block 7 comprises 117 no. residential units, within a part seven, part eight, and part nine storey building height, over a basement level, including 40 no. 1 bedroom units, 76 no. 2 bedroom units, and 1 no. 3 bedroom unit. • Block 8 comprises 94 no. residential units, within a part six, part seven, part eight, and part nine storey building, over a basement level, including 33 no. 1 bedroom units, 58 no. 2 bedroom units, and 3 no. 3 bedroom units. A commercial unit (with a GFA of 698.2 sq.m) is provided at ground floor level. • Block 9 comprises 75 no. residential units, within a part seven, part eight, part nine, and part ten storey building, over a basement level, including 23 no. 1 bedroom units, 48 no. 2 bedroom units, and 4 no. 3 bedroom units. • Block 10 comprises 45 no. residential units, within a part nine, part ten storey building, including 9 no. 1 bedroom units, 27 no. 2 bedroom units, and 9 no. 3 bedroom units. The development includes a total of 363 no. car parking spaces (63 at surface level and 300 at undercroft / basement level). 1,519 no. bicycle parking spaces are provided at surface level, undercroft / basement level, and at ground floor level within the blocks / pavilions structures. Bin stores and plant rooms are located at ground floor level of the blocks and at undercroft / basement level. The proposal includes private amenity space in the form of balconies / terraces for all apartments. The proposal includes hard and soft landscaping, lighting, boundary treatments, the provision of public and communal open space including 2 no. playing pitches, children's play areas, and an ancillary play area for the childcare facility. The proposed development includes road upgrades, alterations and improvements to the Dublin Road / R132, including construction of a new temporary vehicular access, with provision of a new left in, left out junction to the Dublin Road / R132, and construction of a new signalised pedestrian crossing point, and associated works to facilitate same. The proposed temporary vehicular access will be closed upon the provision of permanent vehicular access as part of development on the lands to the north of the Gaybrook Stream. The proposal includes internal roads, cycle paths, footpaths, vehicular access to the undercroft / basement car park, with proposed infrastructure provided up to the application site boundary to facilitate potential future connections to adjoining lands. The development includes foul and surface water drainage, green roofs and PV panels at roof level, 5 no. ESB Substations and control rooms (1 no. at basement level and 4 no. at ground floor level within Blocks 2, 4, 7 and 8), services and all associated and ancillary site works and development. The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in Section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land. The application contains a statement setting out how the proposal will be consistent with the objectives of the Fingal County Development Plan 2017-2023. An Environmental Impact Assessment Report and a Natura Impact Statement have been prepared in respect of the proposed development and accompany this application. The application, together with an Environmental Impact Assessment Report and Natura Impact Statement, may be inspected, or purchased at a fee not exceeding the reasonable cost of making a copy, during public opening hours at the offices of An Bord Pleanála and Fingal County Council. The application may also be inspected online at the following website set up by the applicant: www.fosterstownnorthshd.ie

Fosterstown North, Dublin Road/R132, Swords, Co. Dublin.Fingal County CouncilStrategic Housing Development0 reasons0 conditions0.7 km away
Refused18 April 2024
F23A/0273

Planning permission is sought for an attic conversion with dormer projecting window to rear and all associated site works.

9 Forest Dale, Swords, Co. DublinFingal County CouncilPermission0 reasons0 conditions0.7 km away
Granted11 July 2023
F22A/0507

Permission to erect a 5.2m x 1.85m x 2.8m high stainless steel and glass bus shelter with 2 No. internally illuminated Advertising Panels each of 2 sq. metre area on the public footpath at bus stop No. 733.

Public footpath at Bus Stop No. 733, Rathingle Road (southeast of juncFingal County CouncilPermission0 reasons0 conditions0.7 km away
Granted15 November 2022
F25A/0781E

Planning permission is sought by Rubymint Ltd for the retention of a café reduced in size along with associated signage to that previously approved under planning application reference No. - F17A0555, specifically in relation to the change of use from part of the integral off-licence to a café all with associated internal and external alterations including signage to Peacocks Lounge & Bar, Rivervalley, Swords, Co. Dublin.

Peacocks Lounge & Bar, Rivervalley, Swords, Co. DublinFingal County CouncilRetention0 reasons0 conditions0.7 km away
Granted13 October 2025
F22A/0006

Construction of a Scout Den consisting of a single storey portal frame building with ancillary services and associated site works. This application is concurrent with an application on the adjoining site providing access to services. AI received 25/4/2022 AI deemed significant * Revised public notices (SAI) received 05/05/22

River Valley Road, River Valley, Swords, Co. Dublin.Fingal County CouncilPermission0 reasons0 conditions0.7 km away
Granted31 May 2022
F23A/0112

The development will consist of the demolition of the

Brackenstown Senior National School, Brackenstown Road, Swords, Co.DubFingal County CouncilPermission0 reasons0 conditions0.7 km away
Granted08 September 2023
F25A/1011E

The development will consist of demolition of existing kitchen and living room to rear of house and erection of new single storey flat roofed extension to side and rear to accommodate new entrance foyer and extended living space to side and open plan kitchen, dining and living space to rear.

22A Cherry Park, Swords, Co. Dublin, K67 H248Fingal County CouncilPermission0 reasons0 conditions0.7 km away
Granted18 December 2025
F20B/0122

Conversion of existing attic space comprising of modification of existing roof structure, side dormer c/w window, new access stairs from first floor and flat roof dormer to the rear.

40 Boroimhe Laurels, Swords, Co. Dublin.Fingal County CouncilPermission0 reasons7 conditions0.7 km away
Granted07 August 2020
F25A/1132E

Permission to construct a single-storey side extension to the right-hand side of the existing dwelling, incorporating the existing rear garage into the new extension, together with a structural opening to the right-side gable wall to link the extension with the existing living area, and re-roofing of the existing rear extension.

54 Windmill Avenue, Swords, Co. Dublin, K67 W1H3Fingal County CouncilPermission0 reasons0 conditions0.7 km away
Granted05 February 2026
F26A/0041E

RETENTION permission for (i) ‘commercial sauna’ use; (ii) installation of 1 no. sauna room; and (iii) provision of exterior boundary fence; and PLANNING permission for (a) ‘commercial plunge pool’ use; (b) installation of 1 no. plunge pool; (c) provision of ancillary facilities including an entrance gate, wood store, water tanks, WC, shower area, changing rooms, lockers, office, and covered deck; and (d) all associated site works necessary to facilitate the development.

Saint Finian’s Community Centre, River Valley Shopping Centre, RiverFingal County CouncilPermission and Retention0 reasons0 conditions0.7 km away
Refused16 March 2026
F25A/0849E

The development consists of the retention of a single-storey container unit converted for use as a coffee shop with floor area of 18.2 m² together with associated outdoor seating area of 85m², all with associated site works and services.

River Valley Community Centre, River Valley Road, River Valley, SwordsFingal County CouncilRetention0 reasons0 conditions0.7 km away
Refused10 November 2025
F26A/0226E

The development consists of the retention of a single-storey container unit converted for use as a coffee shop with floor area of 18.2 m² together with associated outdoor seating area of 85m² and planning permission is sought for cladding finish the front (south elevation), one side facing the car park (west elevation) and 1.5m to rear (north west elevation) of the named container; 1.5 m² of non-illuminated signage and also 10no. standalone 440mm high timber planters to enclose the seating area, with all with associated site works and services.

River Valley Community Centre, River Valley Road, River Valley, SwordsFingal County CouncilPermission and Retention0 reasons0 conditions0.7 km away
Granted14 May 2026
F23A/0473

For retention permission for development site; 148 Carlton Court, Swords, Co. Dublin. The development will consist of: Retention of porch extension to front elevation.

148 Carlton Court, Swords, Co. DublinFingal County CouncilRetention0 reasons0 conditions0.7 km away
Granted02 October 2023
F23A/0093

Permission for change of use of existing the ground floor launderette to a retail off-licence & takeaway coffee hub, minor changes to internal layout, alterations to existing shop front signage and all other associated site works. Gross floor area of change of use 145m2.

93 Main Street, Swords, Co. DublinFingal County CouncilPermission0 reasons0 conditions0.7 km away
Granted04 May 2023
F24A/0513E

Construction of a 31.6sq/m ground floor extension to the rear of existing dwelling.

23 Cherry Park, Rathingle, Swords, Co Dublin, K67 XC97Fingal County CouncilPermission0 reasons0 conditions0.7 km away
Granted29 July 2024
F22A/0326

The development will consist of change of use from existing light industrial storage unit to a recreational facility. The unit (area 123m2) is single storey with no external changes and minor upgrading internal layout changes to achieve current building regulations compliance. AI Received 10/02/2023

No. 1 Forest, Swords, Co. DublinFingal County CouncilRetention0 reasons0 conditions0.7 km away
Granted09 March 2023
F25A/0868E

Planning Permission for a flat roof, single storey extension to rear of existing commercial unit and new signage to front.

Unit 2, River Valley Shopping Centre, River Valley Road, Swords, Co. DFingal County CouncilPermission0 reasons0 conditions0.7 km away
Granted17 November 2025
F24A/0477

Permission for a detached for bedroom

5, Forest View, Swords, County DublinFingal County CouncilPermission0 reasons0 conditions0.7 km away
Granted08 July 2024
F23A/0196

Retention Permission and full permission for an existing single-storey extension to the rear and side of the existing dwelling and a new two-storey extension to the side and rear of the existing dwelling, with associated alterations to the internal layout and elevations.

11 Rathbeale Rise, Swords, Co.DublinFingal County CouncilPermission and Retention0 reasons0 conditions0.7 km away
Granted15 June 2023
Showing 51-100 of 30,860
Page 2 of 20