Mabelground Limited intend to apply for retention permission for development (Large-scale Residential Development (LRD)) comprising amendments to a permitted Strategic Housing Development (SHD) as granted under ABP Reg. Ref. ABP-305763-19 at this c. 1.19 Ha. site at the corner of Airton Road and Belgard Road, Tallaght, Dublin 24, D24 HD35. Retention permission is sought for the following modifications: The amalgamation of 2 No. retail/commercial units (178.5 sq m and 175.4 sq m) to create one larger unit, and the relocation of the ESB substation and switch room from the southern boundary into the retail/commercial floorspace (total retail/commercial unit floorspace is 310 sq m); shell and core provided to the permitted creche (fit-out subject to tenant requirements); modifications to the height of the scheme including a minor increase to the finished floor levels, minor adjustment to the parapet heights including a slight increase of one section of roof by 125mm in Block B, minor increase in the height of the roof level amenity space by 500mm, and increase in the height of a staircore by 2.3 metres at roof level; revised roof design layout including an amended PV panel layout, increased green roof provision from 2,490 sq m to 2,576 sq m (increase of 86 sq m), reduction in plant, and provision of railings to the roof terrace amenity space; removal of the second private terrace accessed from bedroom No. 3 of Unit No. AG.105; removal of en-suite bathrooms from Unit Nos. B1.302, B1.303, B1.307, B2.301, B2.302, B2.303, B2.307, B3.301, B3.302, B3.307, B4.301, B4.302, B4.307, B5.301, B5.302 and B5.307; removal of stairs leading from the surface level courtyard to the basement; modifications to the landscaping strategy for fire safety including the addition of ventilation for the basement and adjustments to the landscaping layout at surface level; elevational changes including amendments to the material finishes, and provision of additional fire escapes on the western elevation; minor internal design changes including the provision of a metering room in lieu of 9 sq m of creche floor area, reconfiguration of staircores, reconfiguration of the refuse store, bicycle parking and disabled parking at basement level, and the provision of an attenuation tank at basement level; and all associated development works above and below ground.
Install additional antennae on top of the existing 40-meter high telecommunications monopole structure to include all ancillary equipment (total height not to exceed 44 meters to the top of the antennae) on behalf of the commission for communications regulation (ComReg). To include associated ground mounted equipment.
Construction of a new single storey, pitched roof, home office and games room (44.9sq.m) and all associated site works to the rear garden.
Construction of a single storey (staff room) extension to the front (southeast) of the school (including a rooflight); construction of a single storey classroom extension to the rear (northwest) of the school; All associated elevational changes, internal alterations, site, landscaping and ancillary works.
A bicycle storage unit to accommodate 75 no. bicycles to be located within the TU Dublin Tallaght campus, on an area of existing hardstanding to the east of the Main Campus Building and to the west of the Quad, along with all associated site works and services. The bicycle storage unit will be an enclosed, covered single-storey structure. The gross development floor area of the unit will be 101 sqm.
New vehicular service yard entrance at side.
The Construction of Single-Storey Coffee kiosk complete with signage, site entrance, driveway and car parking area and ancillary site works for 10 years
3 bedroom dormer bungalow with 2 dormer windows to rear, new vehicular access and all ancillary services.
Demolition of the porch side entrance. Demolition of the existing garage. In the side garden. New single storey three-bedroom detached house with two dormer windows to the rear. New vehicular access for the existing house. Remove part of the front wall to allow access.
A telecommunications field technician apprenticeship training area, comprising of a compound, 35m by 25m enclosed by a 3m perimeter fence. The area will contain a number of street cabinets, underground access chambers, underground ducting, half height training poles and a storage unit.
Demolition of the existing industrial and commercial office buildings totalling c.4,628sqm; Construction of a Build-to-Rent Housing Development comprising 170 apartment units and crèche arranged in 2 blocks across 4-7 storeys over basement car park (total gross floor area c.13,880sq.m excluding basement); The residential development consists of: 9 x1 bedroom studio apartments; 94 x1 bedroom/2 person apartments; 2 x2 bedroom/3 person apartments; 34 x2 bedroom/4 person apartments; 24 x2 bedroom/4 person duplex apartments and 7 x3 bedroom/5 person apartments with north, south, east and west facing terraces/balconies throughout; Internal communal amenity spaces at ground and fourth floor levels comprising reception, gym, lounge, cinema/tv room, events rooms and ancillary areas; External communal open space including children's play areas and informal amenity spaces at ground floor level between Blocks A and B; Communal roof garden at fourth floor level - total external communal open space c.1,005sq.m; Public open space at ground floor level to the east and south of Block B totalling c.1095sq.m; 1 creche with associated outdoor play area at ground floor level; 73 car parking spaces comprising 64 basement spaces, 4 accessible parking spaces and 5 visitor spaces at surface level; 354 bicycle spaces comprising 264 resident spaces at basement level and 90 visitor spaces at ground floor level; Reconfiguration/removal of existing car parking to the north of the site and access road resulting in a total of 28 car spaces serving the adjoining site; All associated plant including heating centres, gas room, water storage room, break tank room, comms room and bin storage at basement level, ESB substation and switch room at ground level and circulation spaces and stair and lift cores throughout; Vehicular/pedestrian access to the east from Belgard Road. All existing vehicular entrances serving adjoining sites maintained. Fire/emergency and refuse vehicle access and pedestrian access to the south from Colbert's Fort; All associated site development and infrastructural works, services provision, foul and surface water drainage, extension to the foul network, access roads/footpaths, lighting, landscaping and boundary treatment works.
Demolition of the existing industrial and commercial office buildings totalling c.4,628sqm; Construction of a Build-to-Rent Housing Development comprising 170 apartment units and crèche arranged in 2 blocks across 4-7 storeys over basement car park (total gross floor area c.13,880sq.m excluding basement); The residential development consists of: 9 x1 bedroom studio apartments; 94 x1 bedroom/2 person apartments; 2 x2 bedroom/3 person apartments; 34 x2 bedroom/4 person apartments; 24 x2 bedroom/4 person duplex apartments and 7 x3 bedroom/5 person apartments with north, south, east and west facing terraces/balconies throughout; Internal communal amenity spaces at ground and fourth floor levels comprising reception, gym, lounge, cinema/tv room, events rooms and ancillary areas; External communal open space including children's play areas and informal amenity spaces at ground floor level between Blocks A and B; Communal roof garden at fourth floor level - total external communal open space c.1,005sq.m; Public open space at ground floor level to the east and south of Block B totalling c.1095sq.m; 1 creche with associated outdoor play area at ground floor level; 73 car parking spaces comprising 64 basement spaces, 4 accessible parking spaces and 5 visitor spaces at surface level; 354 bicycle spaces comprising 264 resident spaces at basement level and 90 visitor spaces at ground floor level; Reconfiguration/removal of existing car parking to the north of the site and access road resulting in a total of 28 car spaces serving the adjoining site; All associated plant including heating centres, gas room, water storage room, break tank room, comms room and bin storage at basement level, ESB substation and switch room at ground level and circulation spaces and stair and lift cores throughout; Vehicular/pedestrian access to the east from Belgard Road. All existing vehicular entrances serving adjoining sites maintained. Fire/emergency and refuse vehicle access and pedestrian access to the south from Colbert's Fort; All associated site development and infrastructural works, services provision, foul and surface water drainage, extension to the foul network, access roads/footpaths, lighting, landscaping and boundary treatment works. Any person may, within the period of 5 weeks beginning on the date of receipt by An Bord Pleanála of the application and on payment of the prescribed fee of €20 (except for certain prescribed bodies), make a submission or observations in writing to An Bord Pleanála, 64 Marlborough Street, Dublin 1 or online at www.pleanala.ie. Any enquiries relating to the application process should be directed to the Strategic Housing Development Section of An Bord Pleanála (Tel. 01-8588100).
Erection of 1 no. single storey detached ancillary accommodation garden room (approx. 39.7m2 gross internal area) with gym, den area, office and shower room, and including demolition of existing shed & associated site works in rear garden on overall site comprising 0.024 hectares (240 m2 approx.)
Demolish existing garage at side; construct two storey semi-detached house; new entrance; new boundary walls at front and rear and all ancillary works.
Extension of an existing telecommunications lattice tower (providing new overall height of 31.5 metres) carrying existing antennas, dishes and associated equipment and additional new antennas, dishes and associated equipment together with new ground equipment cabinets, new fencing and all associated site development works.
Modification to existing entrance gate and installation of ramp; dock leveller and buffer seals to existing vehicular building entrance and all associated ancillary site works.
Retention of ground floor front extension to living room and porch.
Source EV Ireland Ltd. intends to apply for permission for development of an Electric Vehicle (EV) Charging Station at Belgard Retail Park, Belgard Road, Tallaght, Dublin 24, a site of ca. 0.035ha. The development will consist of 5 no. EV charging stations, each serving 2 no. vehicle charging bays, a total of 10 no. charging points. The charging bays will be located in the existing car park replacing 12 no. standard parking bays with 10 no. EV charging bays. The proposed development will utilise an existing, ancillary storage building to house an Medium Voltage (MV) switch room linked to an adjacent ESB substation to service the proposed development, the charging bays will utilise existing established access & egress and includes all other associated above and below ground ancillary works.
Planning permission for attic conversion with 2 dormers to rear roof to accommodate stairs to allow access to attic conversion as non-habitable storage space with roof windows to front all with associated ancillary works
Retention permission for development at 26 Tamarisk Park, Kilnamanagh, Dublin 24. The proposed development will consist of a single floor rear extension (34.4sqm) with 5 new rooflights and internal associated works for Living & Laundry room (15.7sqm) with WC (2.7 sqm) and bedroom (11.7sqm) with EN-Suite.
(i) Conversion of existing attic to non habitable storage use; (ii) provision of dormer window to the rear and all associated site works.
Conversion of existing attic space from storage to domestic accommodation incorporating the raising of the wall plate to the rear of the dwelling to form a flat roof structure replacing the back pitch of the existing roof.
Front porch and two storey extension to the side and rear of existing dwelling.
Three storey apartment building containing six apartments with external terraces/private gardens (3 x two bed & 3 x three bed duplex) & one end of terrace two storey house (two bed), landscaping of site and play area, footpath, bin stores, eight car parking spaces, eighteen bicycle parking spaces and all associated site works.
Demolition and removal of existing single and two storey showroom extensions (485 sq Mts) to front elevation (facing Belgard Road) and side elevation (facing Cookstown Estate Road), along with removal of projecting canopy on this side elevation, re-fenestration to front facade (facing Belgard Road) along with a section of side facade (facing Cookstown Estate Road), to include fitting of new curtain walling with matching entrance doors along new wall cladding and new illuminated building signage and required site works.
Construction of a 6.4sq.m full width single storey extension to the front of dwelling.
Alterations and extension to the side and rear to include extra ground floor bedroom and bathroom.
Construction of an attic level dormer window with increased ridge height on existing house located to the rear roof plane and all associated site works.
Change of use from Warehouse to Gym facility, with minor internal modifications including reception area, changing/shower rooms, studio and office all with associated and ancillary site works and external signage.
Change of use from existing cafe bar to 15 studios for short-term accommodation / student accommodation / emergency accommodation units on the ground floor to include internal modifications and external modifications with associated private open space and communal facilities; All with associated signage, drainage and site works.
Change of use from 2 existing office units to 2 two bedroom student accommodation units located at first floor level including minor internal modification works and retaining the existing entrances off the main courtyard.
(a) Construction of a 4 storey nursing home building consisting of: (i) 106 bedrooms (with ensuite); (ii) associated residents welfare facilities; (iii) administration areas and staff facilities; (iv) multi-function space and pharmacy proposed at ground level; (b) construction of 60 one bed independent living units in 3 blocks as follows: (1) Block A, a 4 storey building comprising 11 one-bed units; (2) Block B, a part 4/part 5 storey building comprising 35 one-bed units; and (3) Block C, a 5 storey building comprising 14 one-bed unit. Each unit will be provided with a private open space in the form of a balcony terrace (6sq.m.) (c) The development will include communal open space and landscaping (including new tree planting and tree retention), 30 car park spaces (including 3 limited mobility parking spaces; 3 EV parking and 1 car sharing spaces); and 52 bicycle parking spaces (d) The development will be served by a new pedestrian and vehicular access from Old Greenhills Road through existing boundary wall. Material from the removed wall will be repurposed within the landscape areas; and (e) The development includes landscaping, boundary treatments (including wells and railings to southern and western boundaries), and ESB Substation SuDs drainage, road infrastructure and all ancillary site works necessary to facilitate the development.
(a) Construction of a 5 storey nursing home building consisting of (i) 112 bedroom (with en-suite); (ii) associated resident's welfare facilities; (iii) administration areas and staff facilities; (iv) with day centre, and pharmacy proposed at ground floor level; (b) construction of a part 5/part 6 storey building consisting of (i) 108 one-bedroom/two-person independent living units for older people; (ii) social and activity areas; (iii) management office and (iv) 5 guest bedrooms, each unit will be provided with private open space in the form of a balcony/terrace (ranging from 5sq.m to 12sq.m); (c) communal open space and landscaping (including new tree planting and tree retention), 30 car parking spaces and 86 bicycle parking spaces; (d) the development will be served by a new pedestrian and vehicular access from Old Greenhills Road through existing boundary wall; (e) landscaping, boundary treatments (including walls and railings to southern and western boundaries), an ESB Substation, SuDS drainage; road infrastructure and all ancillary site works necessary to facilitate the development.
Alterations to nursing home element previously approved under Reg. Ref. SD22A/0035 comprising: (i) The omission of the permitted nursing home pharmacy unit and internal void spaces to facilitate the inclusion of additional staff and IT facilities; (ii) revision of staff accommodation including additional office space; (iii) provision of Quiet Rooms on all floors; (iv) revisions to lift locations; (v) the provision of an external bin store; (vi) the 4-storey extension to the western and northern wings of the Nursing Home Building to facilitate: (a) additional staircase; (b) laundry rooms; (c) bulk storage room; (d) increase in bedroom quantum from 106 to 120 (including bariatric standard bedrooms with ensuite accommodation on all upper floors); and (e) the relocation of plant room; (vii) the addition of 2 no. EV parking spaces in lieu of 2 no. standard car parking spaces to bring the total number to 5 no. EV points (the total number of car parking spaces remains as permitted at 24 no. spaces); (viii) the increase in bicycle parking provision to 20 no. spaces to serve the nursing home; (ix) amendments to windows/glazing to correspond with internal modifications; (x) all site works and landscaping necessary to facilitate the development. No works are proposed in relation to the approved Independent Living Units.
The development consists of the retention of existing 60 sq. m. of additional first floor offices within Unit 13.
Planning permission is sought for 2 no. Outdoor Padel tennis court facilities with protected screening around both playing surface, permission also sort to operate a social wine service at existing ancillary cafe located internally and all associated site works
Planning permission is sought for 1 no. Outdoor Padel tennis court facilities with protected screening around playing surface, permission sought for this outdoor playing facility for a period of 5 years only and all associated site works
Change of use from warehouse to padel tennis sports facility, with minor internal modifications, including reception, ancillary cafe, seating area, bathrooms / changing rooms, and all associated and ancillary site works.
1 no. 6.25m wide x 2.5m high internally illuminated sign to be mounted on existing front (east-facing) elevation of B&Q premises.
Construction of a single-storey flat-roof extension to the front with two rooflights, and a part two-storey, part single-storey flat-roof extension to the rear.
Infill two storey house and all associated site works.
Ground floor extension to the side and rear and all ancillary works necessary to facilitate the development.
Part two storey and part single storey extension to side and rear of dwelling with subsequent sub division of dwelling into 1 two storey, three bed dwelling (floor area 91.5sq.m) and 1 two storey four bed dwelling (floor area 152.30sq.m); re-instate front boundary wall incorporating 2 new vehicular entrances and associated site works.
Ground floor rear extension with flat roof over & 3 no. roof lights over
A front porch, rear extension, pitched front dormer roof and a flat rear dormer roof.
Retention Planning Permission for (a) an existing side pedestrian entrance/access gate leading onto Treepark Road, and (b) an existing high-level boundary wall to the front of the existing dwelling house.
Retention permission for alterations to existing buildings to include, over cladding of brick facade at ground floor level, blocking up of roller shutter doors and over cladding of same and new fire escape doors at Building 1, Units 1a, 1b, 1c, Cookstown Estate Road. Removal of dormant fire escape stairs, over cladding of facade, blocking up of roller shutter doors and over cladding of same and new fire escape doors at Buildings 81a and 81b, Cookstown Estate Road. Demolition of car wash annex building and over cladding of facade at Buildings 2 & 3, at Old Belgard Rd.
Aldi Stores (Ireland) Limited are applying for permission for the construction of a single storey Deposit Return Scheme (DRS) Kiosk (Gross Floor Area: 17 sq.m) including 2 no. signage panel areas for branding on the side elevation of the DRS Kiosk (1.0m x 2.0m), and all associated site development works. The development will result in the removal of 2 no. existing car parking spaces in the car park that serves the existing Aldi store at Belgard Road, Tallaght, Dublin 24 D24 VY77.
Retention Permission for existing Marshals Hut 8.8M2 and Revised operating hours: Monday 07:30-17:30, Tuesday 07:30-23:30, Wednesday 07:30-23:00, Thursday 07:30-23:00, Friday 07:30-21:00, Saturday 08:00-19:30, Sunday & Bank Holidays - CLOSED, together with all associated works.
Construction of an acoustic wall, 4.5m high with cranked top to north facing (back) & east and west facing (side) boundaries of existing NCT testing centre and revised operating hours to granted permission Ref: PL 06S.245111 together with all associated site works.