The development will consist of: I. 384 residential units with a cumulative gross floor area of 33,190.15 sq.m comprising: a) 122. houses, consisting of 28 two-bed units, 83 three-bed units and 11 four-bed units, ranging in height from 2-3 storeys. b) 84 duplex units, consisting of 48 one-bedroom units and 36 three-bedroom units, ranging in height from 2-3 storeys. c) 178 apartments consisting of 43 one bedroom units and 135 two-bedroom units, ranging in height from 5-7 storeys. II. tenant amenity floorspace with a gross floor area of 139 sq.m. III. 1.49 ha of public open space including a public plaza and 0.15 ha of communal amenity space; IV. the provision of a childcare facility with a gross floor area of 239 sq.m and associated play area; V. the provision of 361 car parking spaces, including 10 disabled parking spaces and 16 reserved for visitor parking and 3 reserved for creche staff. VI. the provision of 734 bicycle parking spaces, including 472 residents bicycle parking spaces and 262 visitor cycle spaces. VII. vehicular access is proposed via 3 access points including the existing Kingswood roundabout on Citywest Avenue to the north, The Walk to the west and from the park and ride access road at the eastern end of the site. Dedicated pedestrian/cyclist links are proposed throughout the site. VIII. ESB substation, 3 x ESB kiosks, rooftop solar photovoltaics, landscaping and all ancillary site and development works.
Retention of timber log cabin in back garden to rear and side of house, for use as office, gym, play room/games room and storage area along with ancillary works
Minor modifications to previously approved plans (Reg Ref SD21A/0238 + SD23A/0206) of existing (2390m²) light industrial facility at Unit 25 Magna Drive, Magna Business Park, Citywest, Co Dublin D24 PVY8. Modifications include- 1)Provision of additional Warehouse/Assembly and Office staff facilities totalling 523m² additional floor area based on- a)The provision of an additional warehouse/assembly floor area at 1st floor mezzanine level (441m²). b)In addition to the ground and 1st floor mezzanine office/staff facilities granted permission (Reg ref SD21A/0238) provision of) provision of office/staff facilities at ground and 1st floor mezzanine levels which will result in 82m² additional floor area. 2)Minor alterations to Elevations to include: a)New 1st floor mezzanine escape doorway and external stairs to side (East) elevation. b)New staff entrance side (East) elevation. c)New windows to front (North), East and West Elevations. d)New Ventilation louvred panels to front (North) and East Elevations. 3)In addition to the 38 no. car parking already granted (Reg ref SD21A/0238), 7 no. additional car parking spaces (45 no. spaces in total). 4)Relocation of previously approved Electricity substation and switch room (Reg Ref SD23A/0206) to the North of the site adjacent to the vehicular access. 5)Relocation of previously approved waste management and Plant enclosures. 6)New pedestrian gates and vehicular barriers. 7)Signage totem adjacent to the vehicular access. 8)all associated site landscaping and drainage works.
Change of use of the existing warehouse/distribution facility (2,390sq.m) to a light industrial use facility for the production, assembly and distribution of plastic assemblies for healthcare and biopharmaceutical industries; provision of additional floor area at first floor mezzanine level (290sq.m) resulting in a total floor area of 2,680sq.m comprising 910sq.m of ancillary floorspace, including ancillary office areas (263sq.m), staff changing facilities, staff canteen, toilets and plant rooms; external works to the existing building including the installation of a secure gated enclosure to the rear of the building containing air handling equipment, a new escape doorway in the side (east) elevation of the building, a new access footpath; 10 new car parking spaces (including 2 disabled spaces and 4 EV spaces with charging points) (resulting in a total of 38 spaces); new bin store; new bicycle parking provision; removal of existing sign; erection of new illuminated sign (3.6sq.m); all associated soft and hard landscaping works; solar panels; all piped infrastructure; plant and any other works above and below ground associated with the proposed development.
Construction of a detached single storey ESB substation with switch room & associated site landscaping & drainage works.
Planning Permission for omission from a warehouse development site under construction of the superstructure associated with an ancillary sprinkler tank and pumphouse with substructure remaining as per granted planning application Reg. Ref. SD22A/0065 at Magna Avenue and Magna Drive, Citywest Business Campus, Co. Dublin.
Erect 832.00m2 or150.30 kWp of photovoltaic panels on the roof of the existing Lidl store Fortunestown Lane, with all associates site works at Lidl Ireland GMBH
Material alteration to a single school wing consisting of the installation of an external insulation with rendered finish to the junior school wing and the installation of an external biomass boiler unit to the north elevation / creche wing as part of the pathfinder 2022 energy upgrade programme.
Installation of site services including the construction of a new gravity foul sewer, foul pumping station and rising main discharging to the public sewer, connection to the public watermain, boundary landscaping and planting treatments including removal of central hedgerow, provision of 'green link' path. Installation of a sub-surface collector drain and infilling of central dry drainage channel. Vehicular and pedestrian/cyclist access points, internal road commencement (details as marked on submitted plans) and all ancillary development works as necessary to facilitate future development at this site.
Residential development consisting of 99 dwellings comprised of 84 two storey houses, 15 apartments and duplex units accommodated in 2 three storey blocks; the proposed houses are comprised of 9 two bed houses, 71 three bed houses, 4 four bed houses; the proposed apartments & duplex units are comprised of 6 one bed units, 3 two bed units and 6 three bed units, also providing for all associated site development and infrastructural works, car and bicycle parking, ESB sub-station, open spaces and landscaping, bin and bicycle storage; access to the development via a new vehicular entrance on the western boundary of the site, off the existing access road to the Luas park & ride facility on a site area of 3.14ha bounded to the north by Citywest Avenue, located east of a permitted residential development known as Citywest Village and existing ESB sub-station and is north of the Luas red line.
Single storey extension to the side for extended living.
Conversion of attic space to non-habitable space with dormer to side of existing dwelling and all associated site works.
Erection of a new 95.5sq.m three bedroom dwelling house to the side of the existing house with new vehicular access and associated site works.
Works to existing 2 storey side Extension. Double doors in ground floor front elevation, partial ground floor front extension floor area 3msq. First floor rear balcony & double doors to access balcony. Stairs from ground floor to first floor. Change of use of 2 storey side extension to family flat with floor area 52msq
Permission to install a standby industrial diesel generator and solar panels. The generator will include a bunded fuel tank and be located within a mesh enclosure. The proposed solar panels will be attached to a steel frame to be erected adjacent to the generator ( Covering an area of approximately 32 sq.m, to a maximum height of 4.8 meters above ground level ). Works to include all ancillary development works, all located within an existing fenced compound.
Single storey extension of 57sqm to side and rear of existing dwelling with flat roof.
Provision of a warehouse unit with ancillary office and staff facilities and associated development. The building will have a maximum height of 15.5m with a gross floor area of 13,604sq.m including a warehouse area (12,568sq.m), staff facilities (489sq.m) and ancillary office area (538sq.m). The development will also include a vehicular and pedestrian entrance to the site from Magna Avenue, a separate HGV entrance from Magna Drive; 69 ancillary car parking spaces; covered bicycle parking; HGV parking and yards'; level access good doors; dock levellers; access gates; signage; hard and soft landscaping; lighting boundary treatments; ESB substation; sprinkler tank and pump house; an all associated site development works above and below ground.
A new two storey end of terrace dwelling house with concrete tiled roof and external finishes to match existing: new driveway and vehicular access: new dished section footpath for vehicular access and associated site works.
Residential development of 21 houses consisting of 10 3-bed, semi-detached houses and 11 3-bed, terraced houses on a site of 0.658ha adjoining revised boundary with Lidl Store to the east and Fortunestown Lane to the south, including all associated site development works, piped and wired services with access off a permitted entrance to Fortunestown Lane being part of an overall site of 12.45ha which has the benefit of an existing permission for 399 dwellings, Reg. Ref. SD15A/0127 (as amended by Reg. Ref. SD16A/0266).
We, Rockface Developments Limited, intend to apply for Planning Permission for proposed roof mounted Solar PV Panels to the warehouse building as part of an overall previously permitted warehousing development at Magna Avenue and Magna Drive, City West Business Campus, Co Dublin. (Existing granted planning Reg.: SD22A/0065 with associated warehousing development works currently under construction on site). The subject elements for which Planning Permission is sought are as follows: Provision of 2,572No Monocrystalline Solar PV Panels to the warehouse roof with a total area of 5,658sqm. Elevations, Site plan & drainage layout remain unaltered, and the building area remains the same as per previous planning application.
Proposed ground floor rear extension for use as family flat
Permission for development at this site of c. 0.22 hectares at lands. This application site consists of: Parcel A, measuring c. 0.13 hectares, which is principally bounded by the red line rail LUAS tracks associated with the Citywest Campus Luas stop to the north/northwest, existing dwelling No. 19 Citywest Village Avenue to the south, The Mews, Citywest Village residential development and existing dwellings No. 1 The Court and No. 4 The Place to the east and Citywest Village Avenue (road) to the west; Parcel B, measuring c. 0.08 hectares, is principally bounded by The Court (road) to the north, existing dwellings Nos. 10, 12 and 14 The Place to the south, residential development known as Árd Mor Dale to the east and existing dwelling No. 4 The Court to the west; and Two existing parking spaces north of The Court road will be allocated to the proposed childcare facility. The development will consist of the construction of a mixed-use development comprising 12 no. residential units (4 no. apartments and 8 no. houses), coffee kiosk and childcare facility. The apartments, coffee kiosk and childcare facility will be located in a single building arranged across three storeys. The residential units will comprise of 4 no. 1 bedroom apartments (ranging from c.50-52sqm GFA each) with northeast and southwest facing balconies, 4 no. 2 bedroom mid-terrace two-storey houses (c.74sqm GFA each) and 4 no. 3 bedroom end terrace two-storey houses (ranging from c.93-103sqm GFA each) with associated rear private gardens. The apartment building will contain residential bin and bike storage (c.10sqm GFA combined), a coffee kiosk (c.13sqm GFA) with separate bin storage (c.1.5sqm GFA) and outdoor seating area, a three classroom childcare facility with associated office, staff, toilet and laundry facilities (c.135sqm GFA), an external play area (c.67sqm GFA) and external bin and bike store (c.6sqm) serving the childcare facility, all located at ground floor level. The development will also consist of 17 no. proposed car parking spaces, 2 no. existing spaces allocated to the proposed childcare facility, vehicular drop-off zone serving the childcare facility, dedicated bicycle stores in front gardens serving houses, secure visitor bicycle parking throughout, bin storage, open space, public realm areas serving the mixed-use apartment building, hard and soft landscaping, boundary treatment works, photovoltaic panels to houses, pedestrian access, road works consisting of a proposed raised platform/pedestrian crossing over The Court road, provision of Sustainable Urban Drainage systems (SUDS) and all other associated site excavation, infrastructural and site development works above and below ground, including site servicing (foul and surface water drainage and water supply including minor diversion to the existing watermain).
A community Mural on the wall at 1 the rear of 1a Knockmore Avenue, Tallaght. This community mural is a project funded by the Creative Ireland Mural Grant in collaboration with the Connect 4 project, connect for life and members of the local community. The mural draws its inspiration from the poem authored by Emmet O'Brien in partnership with Sean Farrell and the Connect 4 project. The central theme of both the mural and the poem concerns the positive impact of sport on mental health.
Retention of a single -storey shed/garden room circa 24sqm to rear of existing property
Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs, 2 no. roof windows to the front and flat roof dormer to the rear.
Permission for partial change of use from Warehouse to Office use at ground floor level with floor area of 297 sq.m; extension for office use at first floor level with floor area of 256 sq.m; addition of staircase from warehouse to first floor level; to include all associated site works to facilitate the development. Amendment to previously approved planning permission (Ref. No. SD22A/0465) to remove the 133 sq.m Mezzanine level in the description of the development and submitted plans and particulars at Unit 2B, South West Business Park, Cheeverstown, Citywest, Dublin 24.
Partial Change of use from warehouse to office use with floor area of 551sq.m; Addition of mezzanine level with a floor area of 133sq.m; Addition of staircase from warehouse to mezzanine level to include all associated site works to facilitate the development.
Permission to demolish the rear porch and construct a corridor to the rear of the house. Retention to retain the existing single storey structure in the rear garden and use it as a bedroom and en-suite, which will be linked to the existing house with the proposed corridor, all with associated site works.
Permission to demolish the rear porch, construct a glazed link to the rear of the house and construct a new extension for a proposed bedroom and ensuite. Retention to retain the existing single-storey structure in the rear garden and use it as a bedroom and ensuite, which will be linked to the existing house with the proposed glazed link.
Construction of 4 warehouse/industrial units in 3 buildings of c.13,611sq.m total gross floor area (including ancillary offices and operational facilities) and up to 15m in height, with rear service yards; 155 car parking spaces; 72 cycle parking spaces; water services infrastructure and sustainable urban drainage system features, including relocation and resizing of a pump station permitted under SD15A/0391; internal road network accessed via 2 site entrances established in the previous planning applications on the Eastern and Southern sides of the site, via the roundabout at Citywest Avenue and the R136 outer ring road; amendments to the proposed tree pits along the green-link permitted under SD15A/0391; public lighting, landscaping, planting and boundary treatments throughout the development; all other necessary site and infrastructural works to facilitate the development.
Two storey, end terrace house with new entrance; car parking in front garden and associated works.
Attic conversion with 2 roof lights to front and a dormer window to rear plus a single storey shed / garden room (circa 29sq.m) in rear garden with associated site works.
Revisions to permitted house types under Reg.Ref. SD15A/0127 and relates to three house types i.e. house types E1, E3 and E4. It is proposed to modify the ground floor extensions to the rear of 156 of the aforementioned house types.
Single storey extension to side of existing dwelling consisting of downstairs sanitary facilities and utility space circa 3.5sq.m and all associated site works.
Development at a site of 1.65ha comprising of the erection of secure anti-climb wire-mesh fencing around the perimeter of the existing building at a height of 2.1m, with associated landscaping works to screen the fencing. The provision of electronic vehicular access gates off the internal access road for access to rear service compound and car parking, vehicular barriers, and internal access footpaths, in addition to all associated site development works.
Erection of secure fencing and gates to the perimeter of the site, including all associated site development works, landscaping and planting.
A residential/mixed use development on a site area of 12.45ha consisting of 400 dwellings comprised of 340 no. 2 storey detached, semi-detached and terraced houses, i.e. 3 no. 2 bed houses, 323 no. 3 bed houses & 14 no. 4 bed houses along with 60 no. 1 and 2 bed apartments in 4 no. 3 & 4/5 storey buildings. The development also provides for a creche (615sq.m), kiosk (56.6sq.m) and retail unit (237sq.m). The proposed development includes all associated site development and infrastructural works, car parking, open spaces and landscaping, ESB substation and 4 associated kiosks. Access to the development will by via two proposed new vehicular entrances from Citywest Avenue and Fortunestown Lane respectively and will also provide for two new vehicular crossing points over the Luas line. The development also includes for the demolition of an existing dwelling in the southwest corner of the site at the junction of Citywest Road and Fortunestown Lane. The site is bounded to the north by Citywest Avenue, to the west by the N82 Citywest Road, to the south by Fortunestown Lane, to the east by Ard Mor residential estate and is adjacent to the Luas Red Line.
A residential/mixed use development on a site area of 12.45ha consisting of 400 dwellings comprised of 340 no. 2 storey detached, semi-detached and terraced houses, i.e. 3 no. 2 bed houses, 323 no. 3 bed houses & 14 no. 4 bed houses along with 60 no. 1 and 2 bed apartments in 4 no. 3 & 4/5 storey buildings. The development also provides for a creche (615sq.m), kiosk (56.6sq.m) and retail unit (237sq.m). The proposed development includes all associated site development and infrastructural works, car parking, open spaces and landscaping, ESB substation and 4 associated kiosks. Access to the development will by via two proposed new vehicular entrances from Citywest Avenue and Fortunestown Lane respectively and will also provide for two new vehicular crossing points over the Luas line. The development also includes for the demolition of an existing dwelling in the southwest corner of the site at the junction of Citywest Road and Fortunestown Lane. The site is bounded to the north by Citywest Avenue, to the west by the N82 Citywest Road, to the south by Fortunestown Lane, to the east by Ard Mor residential estate and is adjacent to the Luas Red Line.
A residential/mixed use development on a site area of 12.45ha consisting of 400 dwellings comprised of 340 no. 2 storey detached, semi-detached and terraced houses, i.e. 3 no. 2 bed houses, 323 no. 3 bed houses & 14 no. 4 bed houses along with 60 no. 1 and 2 bed apartments in 4 no. 3 & 4/5 storey buildings. The development also provides for a creche (615sq.m), kiosk (56.6sq.m) and retail unit (237sq.m). The proposed development includes all associated site development and infrastructural works, car parking, open spaces and landscaping, ESB substation and 4 associated kiosks. Access to the development will by via two proposed new vehicular entrances from Citywest Avenue and Fortunestown Lane respectively and will also provide for two new vehicular crossing points over the Luas line. The development also includes for the demolition of an existing dwelling in the southwest corner of the site at the junction of Citywest Road and Fortunestown Lane. The site is bounded to the north by Citywest Avenue, to the west by the N82 Citywest Road, to the south by Fortunestown Lane, to the east by Ard Mor residential estate and is adjacent to the Luas Red Line.
Retention of single storey extension with all associated site works.
Ground floor side extension with pedestrian access door, pitched roof over and 1 roof light over.
The Construction of new dormer attic structure in mid terrace dwelling consisting of bedroom and ensuite and all associated site works
Retention for the existing single storey pre-school and afterschool childcare buildings with associated site works.
Single storey family/utility room extension to front, side and rear; porch extension to front and associated site works to existing dwelling.
Installation of energy storage units at an existing datacentre facility. The energy storage will consist of two new battery storage units, 2 new HV power skids (PCS transformer and HV RMU), two new MV transformers, concrete slab, security fence of 2.4 meters height including two new internal gate entrances.
The installation of an energy storage unit at an existing data centre facility. The development involves the placement of three ISO 40ft. shipping containers containing back up storage units at Keppel Data Centre, Citywest Avenue, Citywest Business Park, Dublin 24
The works consist of the construction of an adjoining single-storey special education needs (SEN) unit (540sqm.) to the west of the existing school building and will include two SEN classrooms with safe base and storage facilities, a central activities space, office, multi-sensory room, cleaner's stores, storage rooms, toilets, shower areas, and associated ancillary spaces plus an additional 6no. car parking spaces to the north of the proposed extension. Other works include the relocation of the existing attenuation tank; the relocation of the junior play area and orchard, and the inclusion of a new sensory garden (100sqm.) and a secure soft play area (100sqm.) to the west, with all associated site works.
Construction of a residential development of 463 dwellings comprising 353 apartments, 89 houses and 21 duplex apartments, creche (c.587.8sq.m) and community building (c.141sq.m) as follows: (A) 353 apartments in 7 apartment buildings (with balconies or terraces [including communal terraces] as follows: Block 1 (6 storeys with a part 7 storey level) of 57 apartments; Block 2(6 storeys with a part 7 storey level) of 47 apartments; Block 3 (6 storeys over undercroft/semi-basement with a part 7 storey level) of 56 apartments with car parking and ancillary plant/storage at basement level; Block 4 (6 storeys over undercroft/semi-basement with a part 7 storey level) of 56 apartments with car parking and ancillary plant/storage at basement level; Block 5 (6 storeys with a part 7 storey level) of 47 apartments; Block 6 (6 storeys over undercroft/semi-basement with a part 7 storey level) of 58 apartments with car parking and ancillary plant/storage at basement level; Block 7 is 6 storeys of 32 apartments (creche at ground and first floor) with outdoor play area. (B) 89 houses; House types 1A, 2A, 4, 4A- 3 storey to front [2 storey to rear] remainder of house types 2 storey. (C) 21 duplex apartments in 2 3-storey buildings. (D) Single storey community building including management office, 3 single storey ESB substations, single storey bicycle and bin stores. (E) 401 car parking spaces (including 3 car sharing spaces) to serve overall development and 364 bicycle spaces ([for apartments] with apartment bicycle storage provided internally at ground floor level for apartment blocks 1-7). (F) Provision of public open space areas within the development (including playground areas and communal open space areas); all ancillary landscape works, public lighting, planting and boundary treatments including regrading/re-profiling of site where required as well as provision of footpaths and cycle paths. (G) Vehicular access to the proposed development will be from the Citywest Road (N82) and will include pedestrian crossings and works to facilitate access (including vehicular and footpath/bridges over stream/ditch), secondary vehicular and pedestrian access to boundary to lands to north (currently under construction) and pedestrian to boundary to Magna Drive. (H) Provision of surface water and underground attenuation and all ancillary site development work. The application contains a statement setting out how the proposal will be consistent with the objectives of the relevant SDCC Development Plan.
Retention of single storey extension to rear (circa 12sq.m); first floor extension to rear (circa 2sq.m) and attic conversion (circa 12sq.m).
Two storey extension to rear of 9 Ferneood Avenue Springfield Tallaght Dublin 24