Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs and flat roof dormer to the rear.
New stainless steel and glass bus shelter, 5.2m x 1.85m x 2.8m high with 2 internally illuminated advertising panels each of 2.0sq.m area on the public footpath.
The development will condsist of an attic conversion extending existing ridge level to accomadate proposed bedroom and associated works
Construction of a single storey extension to side of existing dwelling with internal modification and associated site works.
The proposed development consists of the construction of 233 no. dwellings which are comprised of: 78 no. 2 & 3 bed, 2 storey, detached, semi-detached and terraced houses, 56 no. 2 & 3 bed duplex units in 8 no. 3 storey buildings and 99 no. 1, 2 & 3 bed apartments in 2 no. 3-5 and 4-6 storey buildings. Access to the development will be from two new vehicular accesses from the Ninth Lock Road to the east and via the permitted road network i.e. the Clonburris Northern Link Street, (under Ref. SDZ24A/0033W) which provides access from the Ninth Lock Road to the east and the R113, Fonthill Road to the west. The proposed development will connect into the permitted infrastructural works as approved under the Clonburris Strategic Development Zone Planning Scheme (2019) and permitted under Ref. SDZ24A/0033W. The proposed development also provides for all associated site development works and infrastructure to facilitate the development (above and below ground), public & communal open spaces, hard & soft landscaping and boundary treatments, surface car parking (192 no. spaces), bicycle parking (351 no. spaces), bin & bicycle storage, public lighting, plant (M&E) etc.
We, Phoenix Tower Ireland III Limited are applying for 1) Retention Permission to retain the existing 20m telecommunications support structure carrying antenna and dishes, communications cabinets and associated site works within a palisade fenced compound previously granted under planning permission File Ref No. SD10A/0291 AND, 2) Permission to install additional antenna, dish equipment to the support structure including ground equipment cabinets and associated site works at Neilston Lodge, Clondalkin, Dublin 22. The site is within the curtilage of Neilston Lodge a Protected Structure under RPS no. 113 in the South Dublin County Development Plan 2022-2028
Internal modifications to the existing retail warehouse unit to provide for a reduced and reconfigured mezzanine floor of 626sq.m and change of use of the mezzanine from ancillary storage to use as bulky goods sales area. Permission is also sought for associated signage on the north elevation and all associated site and development works. The modified Unit 9A will comprise a total gross floor area of 1,538sq.m
Retention for the partial change of use into a childcare facility and all ancillary site works.
Retention of roof canopy to front of house and retention for attic conversion with dormer projecting window to rear roof for playroom / storage use and all associated site works.
New brickwork boundary wall and gates including enlarged W.E.E.E. enclosure.
Single storey extension as SEN Unit to north-east of school building with 2 No. SEN Classrooms (70sqm each); 2 No. Quiet Spaces (13sqm each); 1 No. Multi-Activity Room (20 sqm); 1No. Central Activity Space (100sqm) and Daily living skills (15sqm); 1 No. office(20sqm); toilets and shower area(18.52 sqm); 3 No. staff toilets (8.15 sqm); 1 No. changing place (12.52sqm); 2 No. storage spaces (14 sqm); 1 No. cleaner store (3sqm); 1 No. sluice(3sqm) and ancillary services; external new secure soft play area (120sqm) and sensory garden (90sqm); 6 No parking spaces and all associated site works and services including new vehicular & pedestrian gates to Greenfort Lawns at St. Bernadette's Senior National School, Greenfort Avenue, Quarryvale, Dublin 22, D22 PW58
Change of use of the existing Unit 14b (996sq.m) to use as a gym including internal layout modifications, external signage and all associated site and development works.
Conversion of attic space comprising of modifications of existing roof structure, new access stairs and flat roof dormer to the rear.
Proposed partial single storey, partial two storey extension to side and rear and internal modification to main house and associated site works
Subdivision of existing Unit 14 (2148sqm total floor area including mezzanine level) to create 2 units and all associated site and development works. The 2 proposed units are; Unit 14a (1541 sqm) with new mezzanine area and Unit 14b (996 sqm). Minor revisions to elevations comprising new access doors and a new window (mezzanine level) on the rear (north) elevation and a new escape door on front (south) elevation and associated signage on the north, south and west elevations comprising of 2 shopfront signs, 6 signage boards, 3 wall mounted signs and 2 service door signs.
Revisions to previous permission Reg. Ref. SD19A/0078 (Bord Ref. ABP-305228-19) for a retail warehouse unit (3,252sq.m) to allow retailing of a range of bulky and non-bulky sporting, recreation and leisure related products and ancillary goods; current application will supersede Condition 2 of Reg. Ref. SD19A/0078 (Bord Ref. ABP-305228-19) which permits the sale of bulky goods only.
New flat roof dormer to the rear of the existing house roof. The top of the flat roof dormer to be 400mm above the existing house ridge line. A new Velux to the front of the existing house roof and all ancillary works.
Conversion of existing attic space comprising of modification of existing roof structure, removal of existing chimney, new access stairs, and flat roof dormer to the rear.
Remove section of existing grass margin and extend concrete apron to rear of existing public footpath and erect a proposed new stainless steel and glass bus shelter, 5.2m x 1.85m x 2.8m high on the public footpath with 2 no. LED illuminated advertising panels each 2.0 square metre area.
Construction of a temporary logistics and storage facility within the Clonburris NorthWest Development Area of the Clonburris Strategic Development Zone (SDZ) Planning Scheme 2019. The facility includes the provision of a logistics facility comprising a warehouse (single story pitched roof c.11.356 meters in height) and adjoining unit (single storey pitched roof c. 6.22m in height) with a combined Gross Floor Area of 1,411sq.m; The provision of a single-storey ancillary office and staff facilities to include an office (25sq.m), canteen/ changing area (24.8sq.m), and WC (9sq.m); Vehicular and pedestrian access from the Fonthill Road (R113) to the east, 24 car-parking spaces, 5 HGV setdown parking spaces and turning/loading areas and 18 bicycle parking spaces; All ancillary site development works including attenuation, footpaths, lighting, landscaping boundary treatments and signage; The logistics facility will exist for a temporary period of up to 10 years to facilitate the delivery and storage of building materials throughout the construction phases of the development of the entire Clonburris Strategic Development Zone; The logistics facility will not be open to the general public; This application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015 all on wider lands bounded generally by Thomas Omer Way (L 1059) to the north, the Dublin-Cork railway line to the south, the Fonthill Road (R 113) to the east and undeveloped lands to the west.
The development seeking retention consists of the construction of a family flat in the garden to the rear of the house and all associated site works.
Alterations and extension to the existing mezzanine floor of 538sq.m to provide an overall mezzanine floor of 708.9sq.m; installation of a new fire exit door to the rear western elevation along with all associated works within the existing retail warehouse unit.
Installation of a new glazed screen to the front elevation (eastern) and side elevation (northern) along with all associated works within the existing Retail Warehouse Unit.
The development will consist of: • Provision of a drive-thru lane for the Costa Coffee unit, including a canopy and service hatch on the northwestern side of the unit, a height restrictor / entrance barrier on the access lane, 3.5m wide drive-thru lane, and associated hard and soft landscaping, • Provision of associated signage consisting of 2 no. directional signage, 1 no. order station, and 3 no. menu boards / advertisement signs; • Alterations to all elevations of the Costa Coffee unit, including the provision of new signage on all elevations; • Associated alterations to the existing car parking layout including the removal of 4 no. associated parking spaces, realignment of the pedestrian walkway and provision of a pedestrian crossing; • Alterations to the existing external bin storage unit • An increase of unit floor area of 8 sq.m; and • Alterations to landscaping, outdoor seating area, and all associated development.
The development will consist of the change of use from a club function room and Kitchen to a restaurant with no material alterations being proposed
Attic conversion for storage; dormer roof window to rear roof profile; new upper landing window to gable.
The development seeking retention consists of the construction of a single story home office, gym and bathroom to the rear of the property.
Single storey storage shed to rear and all associated works.
The proposed development will consist of the temporary storage of inert soil and stone generated by construction and development activity and imported as waste under licence or as by-product (in accordance with Article 27 of the European Communities (Waste Directive) Regulations 2011 (as amended)) as a non-waste by-product on a 3.87-hectare site within the Clonburris North-West Development Area of the Clonburris Strategic Development Zone (SDZ) Planning Scheme 2019. The proposed development will include for: i. The provision of temporary soil and stone storage for later re-distribution and use within the Clonburris SDZ; ii. The proposed fill material will be stored in 2 no. stockpiles of c.90,000m3 and 18,000m3. iii. The proposed 2 no. stockpiles will provide for a combined c.108,000m3 of material to be stored on site and will be c.6m in height; iv. Vehicular and pedestrian access will be provided via approved access off the Fonthill Road (R113), which will also serve the Logistics Facility as approved under Reg. Ref. SDZ23A/0016. The proposed inert soil and stone stockpiles will be temporary in nature and will be operational for an anticipated 7-year time period. It will then be decommissioned, and the subject lands will be restored and developed in line with the Clonburris Strategic Development Zone Planning Scheme 2019.
Construction of a 24 metre high free standing communications structure with associated antennae, communication dishes, ground equipment and all associated site development works forming part of Eircom Ltd. existing telecommunications and broadband network.
Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs, 2 no. roof windows to the front and flat roof dormer to the rear.
Construct a new 2 storey rear extension to existing Elverys Sports retail unit including 2 no. new EV charging spaces and 7 no. cycle parking spaces together with all signage, associated site works, and connection into existing services.
Divide existing Elvery's Sport retail unit into two separate retail units; retaining the larger unit for Elvery's Sports; minor elevational changes; associated signage; site works and ancillary services.
Two storey extension to the side for extended living; Single storey extensions to the front and back at the side.
Alterations to previous approved planning application, Reg. Ref. SD15A/0105, consisting of: construction of a new single storey flat roof modular changing facilities (293sq.m) ancillary to the existing playing pitch; relocation of approved 38 carparking spaces and 2 coach parking bays from northern boundary to the eastern boundary adjacent to Cloverhill Road installation of new overhead flood lights; 3 new flag poles; continuation of previously permitted boundary wall and footpath (Reg. Ref. SD15A/010) extending along the south eastern boundary, with addition of new security fencing added to top of wall, all adjacent to Cloverhill Road; new entrance gates (accessed via the permitted entrance off Cloverhill Road); all associated boundary treatment, landscaping and ancillary works necessary to facilitate the development.
Permission sought for a 2.4-metre-high steel palisade fence and gate at south side of St. Oliver's Training Centre, Cloverhill Road, Dublin 22.
Removing two sections of existing concrete apron, extend existing kerb to the end of the concrete apron and erect a proposed new stainless steel and glass bus shelter, 5.2m X 1.85m X 2.8m high on public foot path with 2 No. LED illuminated advertising panels each of 2.0 square meter area
Change of use from offices to physiotherapy centre and fitness studio.
12m guyed telecommunications pole, together with antennas, dishes and associated telecommunications equipment.
One 6.25m wide x 2.5m high internally illuminated sign to be mounted on existing front (north-facing) elevation of B&Q premises.
Roof alterations for the conversion of the attic space to comprise of the alterations to the gable wall with a new side window; 2 roof windows to front elevation with a roof dormer to the rear elevation all at second floor level and all associated site works.
Aldi Stores (Ireland) Limited are applying for permission for the construction of a single storey Deposit Return Scheme (DRS) Kiosk (Gross floor Area: 17sq. m), including 2 no. signage panel areas for branding on the side elevation of the DRS Kiosk (1.0m x 2.0m), and all associated site development works at the existing Aldi store at the Fonthill Retail Park, Lucan, Co. Dublin D22 HO22.
Garage conversion for extended living with new window to the front.
Proposed construction of a two-storey extension with pitched roof to side + rear of existing dwelling, new single storey extension with pitched roof to front of new extension and a new single storey flat roof extension to rear of dwelling. Proposed porch extension to front entrance also. All other associated ancillary site works included in the application.
Extension, refurbishment, and alterations to adjoined warehousing Units 1, 2 & 3 Cloverhill Industrial Estate, Clondalkin, Dublin 22 as follows: 1. The existing warehousing Unit 1 (existing total area 11,725m2, comprised of 8,526m2 warehouse area and 3,199m2 of two storey ancillary offices) is proposed to be subdivided into two units as follows: A. Unit 1A, 2,582m2 in total including redesigned ancillary offices on 2 floors with an overall area of 522m2 (note: existing two storey office will be reduced by the demolition of 259m2 first floor offices and change of use of part of ground floor office, 281m2, to warehousing space), with a resulting warehouse area of 2,060m2. B. Unit 1B, 8,116m2 in total including redesigned ancillary offices on 2 floors with an overall area of 568m2 (note: existing two storey office will be reduced by demolition of 768m2 first floor offices and change of use of part of ground floor office, 801m2, to warehousing space) with a resulting warehouse area of 7,548m2. Both of the above units to receive front/southern elevation upgrades and access improvements of HGV's entering the site through two improved existing entrance/exit locations, addition of 1 no. goods door to Unit 1A, addition of 4 no. dock leveller doors & 1 no. goods door to Unit 1B, removal of a disused sprinkler pumphouse/plant room & (167m2) and sprinkler tank (24m2, 7m high) to the rear of Unit 1B, associated elevational changes, drainage works including surface water swales, landscaping, rearranged car parking, provision of cycle parking and associated site development works. 2. Existing Unit 2 building area remains unaltered. 3. Existing Unit 3 with a total area of 4,995m2, proposed alterations will include existing warehouse office area (90sqm total over 3 locations) to be reduced to 42sqm by the demolition of 24m2 of first floor office and the change of use of 24sqm of part of ground floor office area to the warehousing area, and separately demolition of 147sqm of adjoined warehouse corridor resulting in 4,782m2 of warehouse area with the addition of a proposed new two storey adjoined ancillary office area extension of 358m2, with associated elevation works, ancillary cycle parking and adjusted car parking, addition of 2no. dock leveller doors & 1 no. goods door to the side/eastern elevation plus associated drainage works including surface water swales, landscaping and associated site development works.
Retention Permission for several items further to the construction of the development as granted planning under South Dublin County Council Reg. Ref. SD24A/0015 for an extension, refurbishment, and alterations to adjoined warehousing Units 1, 2 & 3 Cloverhill Industrial Estate, Clondalkin, Dublin 22. The items for which Retention Permission is sought are as follows: 1.Alterations at Unit 1, resulting in a total area of 10,153m2 (10,120m2 of warehouse area, and 33m2 of Staff Facilities Area) as follows: A.Omission of previously proposed subdivision of Unit 1 in two units (Unit 1A and Unit 1B), with no area change. B.Change of use of 276m2 of Ancillary Office Area and 236m2 of Staff Facilities Area to Warehouse Area (at Ground Floor) and removal of 545m2 of Ancillary Office and Staff Facilities Area (at First Floor) due to the omission of previously proposed 2 storey Ancillary Office for Unit 1A and Unit 1B and redesign of existing Plant Room area at North-western corner of Unit 1 to accommodate warehouse toilet block and IT room. 2.Alterations at Unit 3: change of use of 3m2 of Staff Facilities Area to Ancillary Office Area and 39m2 of Ancillary Office Area to Warehouse Area (at Ground Floor) and 3m2 of Ancillary Office Area to Staff Facilities Area (at First Floor), resulting in 5,182m2 (4,824m2 of warehouse area, 221m2 of Ancillary Office Area and 137m2 of Staff Facilities Area) due to the structural design arrangements at the Ancillary Office and demolition of 2No. existing warehouse offices. 3.Previously proposed existing internal roller door to be built up, now retained to provide a connection between Unit 1 and Unit 3. 4. Elevational changes, with no floor area changes, due to the above mentioned modifications, including: A.Addition of 3No. fire escape concrete steps and refugee area at Unit 1. B.Omission of 2No. personal doors at Unit 1. C.Relocation of 1No. level entry door at Unit 1 and, D.Omission of 1 dock leveller door due to the retention of existing level door and personnel door at Unit 3. 5.Associated site works including: A.Existing ancillary area at front elevation of Unit 1 is retained unaltered. B.Previously proposed HGV access at front elevation of Unit 1 now omitted due to the omission of the subdivision on Unit 1, HGV access is now at South-eastern corner of the site. C.Addition of fence and swinging gate for fire escape circulation at South-western corner of Unit 1 and omission of fire tender swinging gate at the rear of the site, between Unit 1 and Unit 3. D.Site works adjustments due to elevational changes. All other elements remain as per granted planning application Reg. Ref. SD24A/0015.
Single storey front, side and rear extension comprising of a den, utility room and living area; additional single storey rear extension as part of kitchen; new roof windows to side and rear of new roofs; all associated site works.
(1) a new access roadway into the site from Cloverhill Road; (2) a new single-storey changing facility for Ballyfermot Utd. Sports & Social Club including new vehicular and pedestrian access gates to the club grounds from the new access road and parking for 37 cars and 2 buses and (3) residential development of 43 2-storey dwellings including 44 car spaces and comprising 4 Type A 3-bedroom semi-detached houses, 19 Type B 3-bedroom terraced houses, 16 Type C 3-bedroom terraced houses and 4 Type D 2-bedroom terraced houses. The proposed development also includes all associated landscaping, site development and infrastructural works.
Proposed construction of a two-storey extension with pitched roof to side of existing dwelling, new single storey extension with pitched roof to front of new extension and a new single storey lean to roof extension to rear of dwelling. Proposed porch extension to front entrance also. All other associated ancillary site works included in the application.
Single storey extension to connect the existing dwelling to the previously constructed ancillary building in the rear garden and all associated site works at 30 Earlsfort Rise, Lucan, Co. Dublin.