To construct a two storey dwelling, site entrance, waste water treatment system and all associated site works
Of two storey extension as constructed to existing house and all associated site works
To (i) amend the design of the glamping pods and toilet block (ii) amend the site layout of planning permission as granted under Planning Reg. Ref. P21-900
To apply for six glamping pods, toilet block, car parking area, vehicular access, wastewater treatment plant, and ancillary site works
The development will consist of one two-storey dwelling house, wastewater treatment system, percolation area, new site entrance, driveway and all associated site works
To develop a swimming platform, and associated site works. A Natura Impact Statement accompanies this application.
To develop swimming platform, yoga deck, outdoor recreation area and changing stalls associated site works. A Natura Impact Statement accompanies this application
To RETAIN an existing two storey dwelling as constructed, and PERMISSION for the construction of a new single storey extension to the side of the existing dwelling and the incorporation of a new window to the gable of the dwelling
To Extend the Appropriate Period of Planning Permission Ref:15/672 to construct dwelling house, garage, waste water treatment system, percolation area, entrance and all associated site works
For change of house design from that previously granted under planning reference 15/672 and subsequently extended under planning reference 20/391, detached home office, entrance, onsite waste water treatment system, connection to necessary services together with all associated ancillary and incidental works
For development at the site at Shantraud, Killaloe, Co. Clare. The development will consist of the construction of a single storey dwelling house, entrance from public road, driveway, connection to group water scheme, sewerage treatment system and all associated site works.
The development will consist of the construction of a single storey dwelling house, entrance from public road, driveway, connection to group water scheme, sewerage treatment system and all associated site works
For Ballina/Killaloe Sports and Community Facilities Development Company (T/A Clarisford Park) in conjunction with Ballina Killaloe Active Retirement Group Ltd. are applying for full planning permission for 1) The construction of a new Petaque (Boules) Arena, c/w boundary fencing, lighting and spectator seating area and 2) The replacement of the existing grass surface on the sand based training pitch with a 4G Astro All Weather Surface. There are no proposed changes to existing flood lighting and fencing arrangements to the existing pitch area. A Natura Impact Statement has been submitted to the Planning Authority with the planning application
For development which will consist of two detached two-storey, 4 bedroomed dwelling houses, septic tanks, percolation areas and all ancillary site works and external landscaping
To Extend the Appropriate Period of Planning Permission for P15/154 for a single block of four town houses that was originally granted planning permission under P07-1990
To construct a private dwelling house, wastewater treatment system along with ancillary site works and to RETAIN an existing private bored well and pump house
For the construction of a single storey extension to the rear of the existing dwelling
To RETAIN relocated site entrance, PERMISSION for new circa 2m high rendered blockwork boundary wall adjacent to existing house, RETENTION of additional roof lights to existing house (further to that granted under P20/202) AND RETENTION for change of use from commercial to residential for the outbuilding to the rear of existing dwelling and extension
To construct a two bay double slatted shed with creep area
To extend the existing business park Shantraud, Killaloe, Co Clare. The proposed works will involve the following 1. Demolition of some existing light industrial units and 2. The erection of 5 number light use industrial block and 3. connect to existing site services and ancillary works
To demolish existing derelict dwelling and for PERMISSION to construct new replacement dwelling, sewer treatment unit and percolation area and new entrance
For development at Shantraud, Killaloe, Co Clare. The application relates to the change of house type, change of site layout and vehicular entrance previously granted under planning ref. 14/371 and 19/653 and all associated site works
To construct a workshop and storage together with associated site works at the rear of the house
For development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
To RETAIN existing garage for private domestic use adjacent to family home
To erect a dwellinghouse including car port and home office, install an effluent system and and percolation area entrance and all associated site works
The development will consist of the construction of a single private dwelling, wastewater treatment unit and percolation area, a new entrance gateway and all associated site works
To demolish an existing garage at rear of dwelling, construct a new garage, to construct an extension to rear of dwelling and insert a window to the side of same dwelling
For the construction of Multi Use Games Area (MUGA), associated site fencing and netting artificial grass surface, floodlighting and all associated ancillary and incidental works
To construct an extension to farmyard consisting of a cattle shed with underground slurry storage tank
For development which will consist of a site boundary amendment to that granted under planning reference 09-261
For development which will consist of the restoration of part of an extant sand and gravel quarry to agricultural grassland. The development is necessary to address condition no. 8 & 9 of ABP Ref. 03.QD.0011 and will include importation of inert material and all associated site development works. A Natura Impact Statement (NIS) has been submitted with the planning application
For change of house type & garage type from that permitted under planning file 22-811
For the following: a) demolish existing garage and overhead store, b) construct a new dwelling extension to the side of the existing dwelling. c) construct new detached domestic garage. d) upgrade existing septic tank system to new septic tank and percolation area & all associated site works
For construction of two storey dwelling, detached domestic garage, new entrance, onsite waste water treatment system, connection to necessary services together with all associated ancillary and incidental works
For change of house and garage design, (including relocation of proposed garage), from previously granted planning permission 24/60184 (Permission for construction of two storey dwelling detached domestic garage, new entrance, onsite WWTS, connection to necessary services together with all associated ancillary and incidental works)
Of as-constructed detached domestic garage/store and Permission for single storey extension to the rear of the existing dwelling, dormer windows to first floor level, together with all associated ancillary and incidental site works
Retain existing garden shed and all associated site works to the rear of their house
For the development for a dwelling house, site entrance, waste water treatment system and all associated site works above and below ground
For development of a wind farm in the townlands of Fahy Beg, Fahy More North, Ballymoloney, Ballyknavin (Ed O'Briensbridge), Balllyquin More, Woodpark and Leitrim, Co Clare together with the development of an underground grid connection cable to the national grid. The underground grid connection is located primarily within the public road within the townlands of Leitrim, Fahy More South, Ballybrack, Aharinaghmore, Tooreen (Ed Cloghera) Aharinaghbeg, Knockdonagh, Roo East, Blackwater, Rosmadda West, Parkroe, Lackyle (Ed Ballyglass) and Castlebank, Co Clare. Temporary accommodation works to facilitate the delivery of wind turbine components to the site will be required in the townland of Ardataggle, Co Clare. The development will consist of: Construction of 8 no. wind turbines with a blade tip height range from 169m to 176.5m, a hub height range from 102.5m to 110m and a rotor diameter range from 131m to 138m; Erection of 1 no. permanent meteorological mast to a height of 100m above ground level; Construction of 1 no. onsite 38kV electrical substation to ESB Networks (ESBN) specifications and associated compound including Welfare facilities, Electrical infrastructure, Parking, Wastewater holding tank, Rainwater harvesting tank, Security fencing and all associated infrastructure, services and site works including landscaping in the townland of Woodpark; Installation of medium voltage electrical and communication cabling underground between the proposed turbines and the proposed on-site substation and associated ancillary works; Construction of turbine foundations and crane pad hardstanding area; Construction of new site tracks and associated drainage infrastructure; Upgrading of existing tracks and associated drainage infrastructure where necessary; Access to the proposed wind farm site will be from the R466 local road and will consist of the use of an existing quarry entrance in the townland of Leitrim which will be upgraded, as well as the creation of 1 no. new permanent site entrance on the Fahymore local road in the townland of Ballyquin More, and the use of 1 no. existing field entrance which will be upgraded, in the townland of Ballymoloney. The site entrances shall be used for both construction and operation of the proposed wind farm; All associated drainage and sediment control; Installation of new watercourse and drain crossings; Reuse and upgrading of existing internal watercourse and drain crossings; 2 no. temporary construction site compounds and
To RETAIN solar voltaic panels and velux roof windows erected on the rear roof of house and to RETAIN attic conversion and internal stairs to converted attic and all associated site works
The development will consist of the change of house design, site layout, wastewater treatment system and vehicular entrance previously granted under planning no. P20/761. Planning permission is also being sought for the construction of a single storey garage/gym and all ancillary works
For the alteration to the basement of the existing house design, previously granted under Planning No. P21/673 to include additional underground car parking and ancillary works
For development comprising of the following works; a) Proposed new single storey dwelling. b) New single storey garage and canopy connection to proposed dwelling. c) Proposed new treatment system, percolation area. d) New access to connect to existing right of way at road. e) and all associated site works, boundary adjustments and service connections
For development of a single-storey modular retail & storage unit at the rear garden of the existing building, works includes hard and soft landscaping, together with all associated site works
For the following development at Apartments No. 9 and No. 13, The Lakes Retirement Village. 1. Development of attic conversion comprising bedroom and bathroom. 2. Fit 3 No. velux rooflights to front elevation and 3. Construct new stairase from first floor to attic
For to erect a dwelling house using existing entrance to family home, install a septic tank and percolation area and carry out associated site works
To erect a dwelling house and garage, install an effluent system and all associated site works
To extend the appropriate period of planning for P18/591 to construct a single dwelling house, garage, advanced wastewater treatment system and ancillary site works
To Extend the Appropriate Period of Planning Permission P18/580 for the construction of 3 no. detached dwellings and all associated site development works