To construct a new agricultural entrance onto the public road including site works
Of a Domestic Garage and Studio including ancillary site works
To construct a slatted cubicle unit, 3 bay machinery shed and all ancillary site works
For the refurbishment of an existing stone cottage to include provision of thatch roof, timber windows, doors and thermal upgrade of the cottage and for the construction of a single storey extension to the side of the existing cottage, provision of effluent treatment system and ancillary site works
For the thermal upgrade and new front door of the existing cottage and for the construction of a single storey extension to the side of the existing cottage, and for the provision of an effluent treatment system and ancillary services
To construct a storage shed together with ancillary site development works and services
The development will consist of planning PERMISSION for a period of five years to construct and complete a Solar PV Energy development with a total site area of 16.08 hectares, to include inverter station modules, solar PV panels ground mounted on support structures, internal access tracks, watercourse crossing, security fencing, electrical cabling and ducting, CCTV and other ancillary infrastructure, drainage, additional landscaping and habitat enhancement as required and associated site development works including works relating to the access to the site. The solar farm would be operational for 35 years. A Natura Impact Statement has been prepared in respect of this planning application
For the construction of a dwellinghouse with integrated auxiliary living accommodation, garage & proprietary waste treatment plant, bored well & road entrance including ancillary site works
To carry out the following development: 1) The construction of a new 4m wide cycling infrastructure approximately 1185 metres in length, travelling from north to south on the R458, commencing with an uncontrolled crossing point north of the river Rine, then veering off-road over a refurbished masonry arch bridge, under the M18 Bridge and over the OPW embankment. The cycle path will then travel south via the existing access road serving the motorway attenuation ponds to where it will cross the L3148 east of the Dromoland East Roundabout via an uncontrolled crossing. It then veers south off-road, tying back in with the existing cycling infrastructure on the R458 with an uncontrolled crossing located approximately 300m south of the Dromoland East Roundabout. 2) An extension of the existing 60Kph speed limit for consideration of the scheme. 3) Installation of public lighting 4) The installation of associated signage. 5) All ancillary site works. In accordance with the Habitats Directive, Appropriate Assessment Screening has been carried out on the project. An Environmental Impact Assessment (EIA) screening determination has been made and concludes that there is no real likelihood of significant effects on the environment arising from the proposed development. The masonry bridge is a Protected Structure RPS No.:211 NIAH 20404204 as noted in the Clare County Development Plan 2017-2023 (as varied) Volume 4
Of changes to elevations of dwelling house from approved plans consisting of the addition of dormer windows, patio door, velux and ground floor gable windows, RETENTION of additional floor area to garage plus the RETENTION of a garden shed and front boundary wall, as constructed
To construct a 2 storey side and rear extension to the existing property
For the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
To develop a motorway service area and rest area adjacent to Junction 12 of the M18 motorway, which will include service station building with convenience shop, food court, staff facilities, canopy, fuel facilities, parking and circulation space, children's play area, picnic area and access provision. The development also includes infrastructural works public lighting, signage, landscaping, internal fencing, electrical substation, sixteen electric car charging points, roof mounted solar panels, storm water runoff, petrol interceptors and attenuation system, on-site wastewater treatment plant including access road, pumping station and connection to public foul sewer, drainage improvement works, underground fuel storage tanks, rain water harvesting system, connection to public water supply, underground storage tanks for fire-fighting purposes, underground rain water harvesting tanks, works to improve visibility at access point, upgrade to adjacent roundabout and ancillary works. The connection to the public sewerage system will be by means of a rising main to an existing public sewer. The rising main sewer will cross under the M18 motorway by directional drilling and thereafter underground via existing road margins/public road and under River Fergus and railway line through the townlands of Kilbreckan, Killow, Skehanagh, Clareabbey and Ballybeg. The inert soil from the directional drilling will be used in landscaping works on the site of the service station building. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application
To demolish existing outhouse, construct an extension to both sides of existing dwelling house to include associated renovation works and site works
To construct a new single storey dwelling together with al ancillary site development works and services
The development will consist of the construction of a slatted unit and associated site works
To construct a new dwelling house, private garage, site entrance, private wastewater treatment system along with all associated site works and services
To construct a new dwelling house, private garage, site entrance, private wastewater treatment system along with all associated site works and services
For the construction of a dwelling house, coach-house/garage, wastewater treatment system and new entrance including ancillary site works
For the construction of a dwelling house, coach-house/garage, wastewater treatment system and new entrance including ancillary site works
To construct a dwellinghouse, garage, wastewater treatment system and soil polishing filter together with all ancillary site development works and services
The development consists of the RETENTION of alterations to the dwelling house as approved under planning ref. P19/355, these alterations consist of the mirroring of the front section of the dwelling, corrections to site levels and floor levels of dwelling and ancillary site works
For the construction of detached two storey dwelling house, onsite wastewater treatment system and percolation area, new entrance, connection to necessary services, together with all associated ancillary and incidental site works
To apply for a 10 year planning Permission for development which will consist of the phased demolition of all existing buildings, structures and infrastructure on, in, over and under the site of the existing Roche pharmaceutical plant at Clarehill td, Clarecastle, County Clare, including the existing wastewater treatment plant (WWTP) and all associated ancillary infrastructure, with the exception of the ESB compound on Clarehill, the cottage to the north of the site which fronts onto Patrick Street, existing hedgerows and tree cover, all tie in points to utilities and to discharge points at the site boundary, and site boundary fencing. The existing security hut at the main entrance to the site from Clarehill, the existing internal road network, and existing site utilities; including storm water network, water supply network, fire watermain, fire pump house and electrical transformers, will remain for the duration of the proposed development, to be removed upon completion of the proposed development. The phased demolition will require a fenced demolition contractor's compound, to include offices, welfare facilities, material storage areas, bunded storage, and all associated ancillary structures. The demolition contractor's compound will be accessed via the existing entrance from Clarehill, to include a wheelwash and weighbridge. The proposed development will also consist of the phased remediation of three Areas of Environmental Concern (AECs) within the site boundary namely AEC1, the main processing area; AEC2 in the vicinity of the WWTP and the landfill area. The phased remediation will include bulk excavation within temporary negative pressure enclosures, including decontamination units, backfilling of excavated areas, the use of vapour and groundwater extraction wells, and a modular vacuum plant. The proposed development will also include a fenced remediation contractor's compound, contractor's car park, and a container storage area. The remediation contractor's compound will be accessed via the existing access to the south of Clarehill, with new temporary security hut, wheelwash and weighbridge. The proposed development will also generally consist of: stockpiling areas within the site; the construction of internal temporary fencing; silt fencing, temporary extension to the existing stormwater drainage, water supply and firewater supply systems; existing medium voltage supply at 10kV; Please view Newspaper or Site Notice for the remainder of description
To erect a modular office building to facilitate workers during the site decommissioning and to carry out all associated ancillary works. This application refers to an Establishment which holds an Integrated Pollution Control Licence and to which the European Communities (Control of Major Accident Hazards involving Dangerous Substances) Regulations 2006 applies
To construct a house, garage and associated site works
Of alterations to side elevation of existing dwelling house
For the development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
(planning ref. no P22-700) which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
For development which will provide for the upgrade of the Dromoland Castle Wastewater Treatment Plant and will comprise of: (1) the demolition of the existing above ground wastewater treatment plant tanks; (2) construction of a new inlet works on a raised platform; (3) construction of two new SBR streams to provide secondary treatment; (4) construction of new stormwater holding tanks and sludge storage tank; (5) Construction of a supernatant pumping station, (6) Installation of new control panel kiosk enclosure on a raised platform; (7) Installation of a new chemical dosing system; and (8) all ancillary site works. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development
To (a) change design of private dwelling house and garage and (b) relocate proposed wastewater treatment system and percolation area as previously granted under Planning Register Reference P17-647, connect to existing infrastructure services and all associated site works
For (1) RETENTION of (a) family room rear extension (b) side patio roof covering (c) stone cladding to part of previously approved extension under PR-0271 (2) PERMISSION for development which will consist of alterations and a single storey extension including ancillary site works
To construct a vintage truck / storage shed together with all ancillary site development works and services
Of the following (a) rear extension to dwelling house (b) covered patio area, (c) shed and (d) garden room, together with all ancillary site development works and services
To erect a 30 metre high lattice telecommunications support structure, including a headframe together with antennas, dishes and associated telecommunications equipment and works, all enclosed in security fencing and to construct a new access track and revised site entrance. A Natura Impact Statement has been submitted as part of this application
To (a) Convert existing post office and residential accommodation to 2 No. 2 Bedroom Apartments and 1 No. 3 Bedroom Apartments with the redesign of the front elevation (b) To Demolish existing garage to rear (c) to construct 2 No. 1 Bedroom Apartments onto existing apartments granted under planning reference No. 23-60152 (d) to remove part of North eastern boundary wall to allow through traffic (e) to construct car parking and bin storage together with all associated site development works and connection to public services
To (a) Convert, alter and extend former butchers’ shop and residential accommodation to 2 No. two-bedroom apartments. (b) demolish former abattoir and sheds and construct 6 No. one-bedroom apartments (c) construct vehicular entrance from rear lane, car parking and bin storage together with all associated site development works and connections to public services
To RETAIN a variation of design and as constructed two-storey extension as previously granted under Planning Permission Reference P8/24338
To construct an agricultural slatted shed including all associated site works and services
To complete the construction of two no town houses, to include connections to services and all necessary ancillary works. Construction to date authorised under Planning Permission P03/970
For a residential development comprising 56 no. residential units, (7 no. detached houses, 46 no. semi-detached houses and 3 no. terrace houses), construction of public footpath to the existing road, ancillary surface car parking, vehicular & pedestrian access to the proposed development, connection to existing public water supply; foul water drainage services including the provision of surface water attenuation and all associated site development and landscape works on lands at Quingardens, Quin, County Clare. The planning application is accompanied by a Natura Impact Statement (NIS)
To a) remove external utility & W.C. b) construct a side and rear extension to existing dwellinghouse together with all associated site development works and services
To RETAIN the Construction of an extension to side and rear of existing public house to comprise of meeting room, Extension of Lounge, Lobby and Kitchen as part of existing public house including ancillary site works
For the construction of a dwellinghouse, New Entrance, and Proprietary Wastewater Treatment System including ancillary site works
For (a) to demolish an existing garage, (b) To construct a single storey side extension and (c) Elevation changes with all associated site works
To demolish existing garage and construct an extension to the side of the existing house along with alterations to existing house and associated site works
For development, the development consists of the construction of a domestic garage on existing foundation with existing finished floor constructed under P07-1718 and associated site works
Of 1. the existing Garage as built on site 2. the site boundaries which are altered from those granted under Ref P8/13066 & PERMISSION to upgrade septic tank on site
Change of use of a portion of the existing commercial premises to 2 number 1 bedroom apartments and all associated site works
For the construction of a temporary primary school consisting of 7 no. temporary prefabricated buildings to accommodate 12 Classrooms, 5 SET Rooms, Staff Room Principal Office, Administration and all related site development works including roads, parking and drop-off area,