(1) DEMOLITION OF EXISTING, DETACHED BUNGALOW HOUSE DAMAGED DUE TO DEFECTIVE (MICA) PRECAST CONCRETE BLOCKS AND (2) CONSTRUCTION OF A REPLACEMENT DETACHED, DORMER BUNGALOW HOUSE WITH ALTERATIONS FROM THAT OF THE EXISTING HOUSE AND THE RELEVANT ASSOCIATED REPLACEMENT WORKS TO BE CONNECTED TO THE EXISTING SITE SERVICESDecision record indexed
(1) DEMOLITION OF EXISTING 7SQM ANNEX TO REAR OF DWELLING UNIT (2) CONSTRUCTION OF A SINGLE STORY 86SQM EXTENSION WITH ALL ASSOCIATED SITE WORKSDecision record indexed
(1) EXISTING DOMESTIC GARAGE (2) EXISTING WORKSHOP AND PERMISSION FOR NEW OFFICE AND CANTEEN EXTENSION TO WORKSHOP WITH CONNECTION TO PUBLIC SEWER AND ASSOCIATED SITE WORKSDecision record indexed
(1) ALTERATIONS TO EXISTING BUILDING INCLUDING RAISING THE HEIGHT OF EAVES AND RIDGE OF EXISTING BUILDING, (2) CONSTRUCTION OF EXTENSION TO THE REAR AND SIDE OF EXISTING BUILDING AND (3) INSTALLATION OF NEW WASTEWATER TREATMENT SYSTEM, PERCOLATION AREA AND ALL ASSOCIATED SITE WORKSGrounds not yet categorised
(1) A GARAGE AND ASSOCIATED SITE WORKS (2) AMENDMENTS TO WINDOW OPENINGS / WINDOW POSITIONING AND DEVELOPMENT OF FRENCH DOORS TO EXTERNAL ELEVATIONS OF DWELLING HOUSEDecision record indexed
(1) RETENTION OF (A) STORAGE SHED TO SIDE OF DWELLING, (B) YARD TO SIDE OF DWELLING AND (C) CHANGE OF USE FROM FORMER AGRICULTURAL ENTRANCE TO RESIDENTIAL ENTRANCE AND (2) CONSTRUCTION OF DOMESTIC GARAGE AND ALL ASSOCIATED SITE WORKSDecision record indexed
ERECTION OF AN EXTENSION TO EXISTING DWELLING HOUSE WITH ALTERATIONS TO ALL FACADES, CONNECTION TO ALL EXISTING SITE SERVICES TOGETHER WITH ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
CONSTRUCTION OF A DWELLING HOUSE, SEPARATE DOMESTIC GARAGE WITH WASTEWATER TREATMENT SYSTEM, PERCOLATION AREA WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS AND PLACING OF MOBILE HOME ON SITEDecision record indexed
ERECTION OF A DOMESTIC EXTENSION TO EXISTING DWELLING HOUSE WITH MINOR AMENDMENTS TO THE FRONT ELEVATION ALONG WITH ASSOCIATED SITE WORKSDecision record indexed
DETACHED RESOURCE ROOM / STORE AND PERMISSION FOR CONSTRUCTION OF AN EXTENSION TO EXISTING SCHOOL TO PROVIDE A NEW RESOURCE ROOM AND ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
CONSTRUCTION OF DWELLING HOUSE WITH ASSOCIATED SEWAGE TREATMENT SYSTEM, DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
(A) ERECTION OF 4 NO. SINGLE STOREY GLAMPING PODS AND 1 NO. SINGLE STOREY RECEPTION BUILDING, (B) CONSTRUCTION OF VEHICULAR ENTRANCE, VEHICLE PARKING AREA, GRAVEL PATHS AND LANDSCAPING THROUGHOUT THE SITE, (C) INSTALLATION OF PROPRIETARY WASTE WATER TREATMENT SYSTEM AND ALL ASSOCIATED SITE DEVELOPMENT WORKS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THE APPLICATIONDecision record indexed
(1) ERECTION OF 5 NO. SINGLE STOREY GLAMPING PODS AND 1 NO. SINGLE STOREY RECEPTION BUILDING, (2) CONSTRUCTION OF VEHICULAR ENTRANCE, VEHICLE PARKING AREA AND GRAVEL PATHS AND (3) INSTALLATION OF PROPRIETARY WASTEWATER TREATMENT SYSTEM AND ALL ASSOCIATED SITE DEVELOPMENT WORKSGrounds not yet categorised
ERECTION OF A NEW 2 STOREY DWELLING HOUSE, CONNECTION TO EXISTING MAINS SEWER SYSTEM, DOMESTIC GARAGE & ALL ASSOCIATED SITE WORKSGrounds not yet categorised
(1) DEMOLITION OF AN EXTERNAL SHED INCLUDING REDUNDANT WATER TANK TOWER STRUCTURE (2) ERECTION OF (A) AN EXTENSION OF THE EXISTING REAR UPPER PLAYGROUND AREA (B) A NEW SINGLE STOREY STEEL SHED STRUCTURE (C) A 6M HIGH BALL STOP FENCING TO THE FRONT, SIDE AND REAR BOUNDARIES OF THE REAR PLAYGROUD AREA (3) ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
(A) OF A PARTIAL FIRST OFFICE RESIDENTIAL ACCOMMODATION TO OFFICE SPACE, (B) INCREASED GROUND FLOOR AREA TO EXISTING BAR LOUNGE ON GROUND FLOOR, (C) A PARTIAL INCREASE IN EXISTING LOW LEVEL FLAT ROOF AREA TO MATCH EXISTING FLAT ROOF HEIGHTS TO THE REAR OF THE PROPERTY, (D) A CANOPY ROOF OVER A BEER GARDEN AREA AT THE REAR OF THE PROPERTY TOGETHER WITH ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
EXISTING BEER GARDEN AREA TO THE REAR OF DOHERTYS BAR AND PERMISSION FOR (1) CONVERSION OF AN EXISTING OUT BUILDING TO A COFFEE SHOP WITH ALTERATIONS TO ALL FACADES AND PROVISION FOR A PEDESTRIAN ACCESS THROUGH THE BUILDING (2) PARTIALLY USE A SEPARATE OUT BUILDING FOR AUXILIARY STORAGE WITH CONNECTION TO EXISTING PUBLIC SEWERAGE SYSTEM, PROPOSED SIGNAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
CONVERSION OF AN EXISTING OUT BUILDING TO A SELF CONTAINED APARTMENT WITH CONNECTION TO EXISTING PUBLIC SEWERAGE SYSTEM AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
(1) DEMOLITION PART OF EXISTING DERELICT DWELLING, (2) REFURBISHMENT AND CONSTRUCTION OF EXTENSIONS ALONG WITH RAISING THE RIDGE LEVEL OF EXISTING DERELICT DWELLING, (3) DECOMMISSIONING OF EXISTING SEPTIC TANK AND PROVISION OF A WASTE WATER TREATMENT SYSTEM WITH ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
ERECTION OF A STAND ALONE BUILDING TO BE USED AS AN ANCILLARY ACCOMMODATION TO EXISTING CHILDCARE FACILITY WITH CONNECTION TO ALL EXISTING SERVICES AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
(1) CONSTRUCTION OF 6 NO. SEMI-DETACHED HOUSES, (2) RELOCATION OF PREVIOUSLY APPROVED OPEN SPACE AREA GRANTED UNDER PLANNING REF: 06/31131 TO ADJOIN THE FUTURE RIVERSIDE WALK AREA AND (3) CONNECTION TO ALL PUBLIC AND ONSITE SERVICESDecision record indexed
(1) CONSTRUCTION OF 6 NO. SEMI-DETACHED HOUSES, (2) RELOCATION OF PREVIOUSLY APPROVED OPEN SPACE AREA GRANTED UNDER PLANNING REF. NO. 06/31131 TO ADJOIN THE FUTURE RIVERSIDE WALK AREA AND (3) CONNECTION TO ALL PUBLIC AND ONSITE SERVICESDecision record indexed
ERECTION OF DWELLING HOUSE WITH SEWERAGE TREATMENT SYSTEM & DOMESTIC GARAGE WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATIONDecision record indexed
INSTALLATION OF A PORTABLE PAY-TO-USE WASTE COMPACTOR FOR THE ACCEPTANCE OF RESIDUAL AND FOOD WASTE AND A PORTABLE PAY-TO-USE COMPACTOR FOR MIXED RECYCABLESDecision record indexed