Front porch and two storey extension to the side and rear of existing dwelling.
Change of use of two community hall meeting rooms - to be used as Montessori classrooms with separate access and the use of kitchen, storage and WC facilities for the same.
The development shall consist of retention of Collect and Go Coffee Dock, together with associated services and signage.
Alterations to existing hip roof to side to create a gable roof to accommodate attic stairs to allow conversion of attic into non habitable storage space with dormer to rear. Frosted window to side gable with roof windows to front roof. Single storey extension to porch, bay window to front and all ancillary works.
(i) Conversion of existing attic to non habitable storage use; (ii) provision of dormer window to the rear and all associated site works.
Planning permission for attic conversion with 2 dormers to rear roof to accommodate stairs to allow access to attic conversion as non-habitable storage space with roof windows to front all with associated ancillary works
Demolition and removal of existing single and two storey showroom extensions (485 sq Mts) to front elevation (facing Belgard Road) and side elevation (facing Cookstown Estate Road), along with removal of projecting canopy on this side elevation, re-fenestration to front facade (facing Belgard Road) along with a section of side facade (facing Cookstown Estate Road), to include fitting of new curtain walling with matching entrance doors along new wall cladding and new illuminated building signage and required site works.
An attic conversion to hobby room with alterations to the existing tiled hip roof, construction of a 'Dutch' style gable hip roof to the side and a new dormer roof extension and window to the rear, internal alterations to layout, new internal stairs, roof lights to the front & side and all associated site works.
Front porch and pitched canopy at front and side. Retention of existing single storey extension at side.
Attic conversion, raising of gable end to change roof profile with dormer projecting window to rear for playroom use/ storage and all associated site works.
Front porch & toilet single storey extension; extend existing ridge tiles & hipped tiled roof to form a new Dutch type roof structure; two storey extension to the rear with a ground floor extension with a tiled roof over & a reduced floor area to the first floor extension with a flat roof; extend existing gable structure up to new soffit level; new door/window & three new obscure double glazed windows in gable; new attic conversion with new dormer roof structure in existing rear tiled roof; internal alterations; new external finishes to match existing & associate site works.
(i) Demolition of the existing industrial and commercial buildings (15,989sq.m); (ii) construction of a mixed-use development featuring: (a) 1104 'build-to-rent' apartments in 4 blocks varying in height from four to eleven storeys. Each apartment has associated private open space in the form of a ground floor terrace or a balcony and has access to internal communal amenity spaces (totalling 2741sqm) and 5,107sqm of external communal amenity space at ground, first floor and roof levels; and (b) 4 commercial units at ground floor level of Blocks B and D (comprising of 2 in Block B accommodating a cafe/restaurant/bar; 1 in Block D accommodating Class 1, 2 and 8 uses as per the Planning and Development Regulations, 2001-2019, as amended; and 1 in Block D to serve the Circle K Belgard petrol station which is to be retained), 1,500sqm of office space across first to sixth floor levels of Block D and a crèche with external play area at ground floor level of Block C. The development is served by a total of 351 parking spaces (including 17 limited mobility parking spaces and 16 car share spaces) and 1860 bicycle spaces (1464 resident spaces and 396 visitor spaces); (iii) road, junction and streetscape upgrade works along First Avenue, Cookstown Road and Old Belgard Road, including the installation a signalised junction at the intersection of First Avenue and Cookstown Road and Old Belgard Road and Cookstown Road; (iv) construction of 3 new roads and 1 pedestrian/cycle link to the Belgard Luas Stop; (v) construction of a 1,688sqm landscaped public plaza with an outdoor flexible events space in the south-western corner of the site; and (vi) associated site and infrastructural works are also proposed which include: foul and surface water drainage; attenuation tanks; lighting; landscaping; boundary fences; plant areas; ESB substations; internal hard landscaping, including footpaths and street furniture; and all associated site development works. Any person may, within the period of 5 weeks beginning on the date of receipt by An Bord Pleanála of the application and on payment of the prescribed fee of €20 (except for certain prescribed bodies), make a submission or observations in writing to An Bord Pleanála, 64 Marlborough Street, Dublin 1 or online at www.pleanala.ie. Any enquiries relating to the application process should be directed to the Strategic Housing Development Section of An Bord Pleanála (Tel. 01-8588100).
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs, 2no. roof windows to the front and flat roof dormer to the rear
For the construction of first floor side extension over previously converted garage, construction of new dormer structure to the rear and conversion of attic space to home office and a games room. Works at first floor will consist of construction of bedroom with en-suite and associated works.
Construction of first floor side extension over previously converted garage. Works will consist of construction of bedroom with en-suite and associated works
Change of use from Warehouse to Gym facility, with minor internal modifications including reception area, changing/shower rooms, studio and office all with associated and ancillary site works and external signage.
Alterations to existing hip roof to incorporate a 'Dutch' half-hipped roof design with attic stairs to allow conversion of attic into non-habitable storage space and installation of two velux windows to the front elevation at 15 Ashfield Avenue, Kingswood Heights, Tallaght, Dublin, D24XK5K
Retention permission for alterations to existing buildings to include, over cladding of brick facade at ground floor level, blocking up of roller shutter doors and over cladding of same and new fire escape doors at Building 1, Units 1a, 1b, 1c, Cookstown Estate Road. Removal of dormant fire escape stairs, over cladding of facade, blocking up of roller shutter doors and over cladding of same and new fire escape doors at Buildings 81a and 81b, Cookstown Estate Road. Demolition of car wash annex building and over cladding of facade at Buildings 2 & 3, at Old Belgard Rd.
Alterations and extension to the side and rear to include extra ground floor bedroom and bathroom.
Conversion of existing attic space; modifications of existing roof structure to gable, raising existing gable wall, dormer to rear and new access stairs.
Change of use from warehouse to padel tennis sports facility, with minor internal modifications, including reception, ancillary cafe, seating area, bathrooms / changing rooms, and all associated and ancillary site works.
Planning permission is sought for 2 no. Outdoor Padel tennis court facilities with protected screening around both playing surface, permission also sort to operate a social wine service at existing ancillary cafe located internally and all associated site works
Planning permission is sought for 1 no. Outdoor Padel tennis court facilities with protected screening around playing surface, permission sought for this outdoor playing facility for a period of 5 years only and all associated site works
Demolition of all existing 1-3 storey industrial/commercial structures on the site (c. 5,500 sq.m). Construction of a 1-4 storey Transitional Care Facility (c.11,747 sq.m.) providing therapy and treatment space and a pharmacy and general practitioners space at ground floor level and 171 no. bedspaces at 1st to 3rd floor levels. 2 no. internal landscaped areas are provided at ground floor level (c.440 sq.m) and 2 no. outdoor amenity areas are provided at 1st floor level (c.483 sq.m). Provision of a coffee dock area, hairdresser, comms rooms, toilets, staff changing facilities, kitchen area, laundry rooms, lobbies/reception areas, admin areas, storage spaces, staff canteen, LV switch room, mains/ sprinkler tank room/ boiler room, multipurpose rooms, dining rooms, meeting and office rooms, sluice rooms, nurses stations, ancillary refuse storage area, ancillary generator, ancillary ESB substation and switch room associated with the operation of the facility throughout. Provision of Stair/lifts, photovoltaic panels, mechanical plant and green/blue roofs associated with the operation of the facility throughout. Partial provision of the pocket park identified in the Tallaght LAP (c.1,500 sq.m). Provision for the relocation and upgrade of the existing vehicular and pedestrian access point along First Avenue for servicing and staff parking and relocation and upgrade of the existing vehicular and pedestrian site access point along Cookstown Road. Provision of signage on the southern, eastern and northern facades of the proposed building and associated totem signage. All associated site development works above and below ground, services provision, connection to water supply and foul and surface water networks on First Avenue and Cookstown Road including partial diversion of the foul line to the north east of the site at First Avenue, attenuation/bioretention systems, provision of internal roads and footpaths, tree removal, bicycle storage (60 no. total spaces), staff and visitor car parking (55 no. total spaces) and 3 no. set down/ loading bays.
Demolition of all existing 1-3 storey industrial/commercial structures and small cafe on site totalling c.5,500sq.m in area; construction of a 1-5 storey nursing home/step-down facility (131 bedspaces) over partial basement (total floor area c.6,743sq.m) with central courtyard (c.519sqm); construction of a deck-access apartment development comprising 139 residential units arranged in 2 blocks (Block A - 8 storeys and Block B - 5 to 6 storeys) with a total floor area of c.10,556sq.m excluding deck access (c.1,141sq.m); 2 commercial units comprising a cafe and pharmacy located at ground floor level facing Cookstown Road in residential Block A ( c.292sq.m in area); the residential development consists of 67 one bed/two person units, 12 two bed / three person units and 60 two bed/4 person units with north, south, east and west facing balconies throughout and residents amenity area at ground floor level; central communal open space (c.1,272sq.m); the basement serving the nursing home consists of a sprinkler tank and pump rooms, tank room, plant room and workshop; provision of dining and kitchen areas, siting/family rooms, activity rooms, coffee dock, hair salon, oratory, lobbies/reception areas, ancillary offices and staff areas, stores, toilets, shower/changing facilities, ESB substation, generator, switch room, service yard and waste areas serving the nursing home; provision of an ESB substation, switchboards, waste areas, water tanks and generator serving Blocks A and B; lobbies, stair/lifts, photovoltaic panels and green roofs throughout; partial provision of the pocket park identified in the Tallaght LAP (c.1,165sq.m); new vehicular access from First Avenue and egress onto Cookstown Road via a one-way system through the subject site; entrance signage on the eastern elevation of the proposed nursing home; all associated site development works, services provision, connection to the water supply, foul and surface water networks on First Avenue and Cookstown Road including partial diversion of the foul line to the north east of the site at First Avenue, attenuation/bioretention systems, vehicular and pedestrian access including internal road and footpaths, public realm upgrade works, landscape and boundary treatment works, tree removal, bicycle storage (307 spaces), car parking (42 spaces), set-down parking spaces including 1 ambulance space serving the nursing home and delivery/loading areas to Cookstown Road and First Avenue.
Planning Permission for the Demolition of existing Garden Shed and proposed creation of new work from home office/ home gym and garden toom to the rear of existing dwelling
Proposed 18m Multi-operator Streetpole Solution and ground equipment cabinet
Demolition of single storey detached garage in rear garden; construction of detached, two storey three bedroom dwelling with attic conversion in rear garden; new vehicular entrance & partial dishing of kerb.
Removal of existing ground floor porch structure and chimney to side elevation; construction of new single storey extension to the front and side elevations; construction of a new single storey extension to the rear elevation; construction of a new first floor extension to front elevation; alterations to existing first floor structure to allow for a revised pitched roof design with a roof light and rooflight to rear roof slope; installation of external insulation to existing dwelling and proposed new elements; all associated internal alterations, demolitions, site boundaries, landscaping, drainage and ancillary works.
Change of use, and associated internal works, of part of the existing building (167 sq.m. approx.) from warehouse to part workshop/light industrial (89 sq.m. approx.) and part water sampling hub (78 sq.m. approx.) to facilitate the overall use of the building as an Uisce Éireann Operations Centre; the provision of a window and security shutter on the north eastern façade of the building; the provision of a wash bay and 4 No. materials bunkers in external yard area; 2 No. replacement vehicular gates; a new pedestrian gate; Uisce Éireann signage on front (southwest) elevation; external air handling unit on northwestern side of building; and associated site development and drainage works.
Demolition of all existing 1-3 storey industrial / commercial structures and small café on site totalling c.5,500sqm in area; - Construction of a deck-access apartment development comprising 123 residential units arranged in 2 no. blocks (Block A 5 to 7 storeys and Block B 5 to 6 storeys) with a total floor area of c.9,806sqm including the proposed bike shelter (c.93sqm) and excluding deck access (c.901sqm); -Commercial floor space located at ground floor level facing Cookstown Road in Residential Block A (c.421sq.m); - The residential development consists of 58 no. 1 bed/2 person units, 12 no. 2 bed/3 person units and 53 no. 2 bed/4 person units with north, south, east and west facing balconies throughout and residents amenity area at ground floor level; -Central communal open space (c.1,303sq.m); -Provision of an ESB substation, switchboards, waste areas, water tanks and generator serving Blocks A and B; -Lobbies, stair/lifts, photovoltaic panels and green roofs throughout; -Partial provision of the pocket park identified in the Tallaght LAP (c.1,286sq.m); -New vehicular access from First Avenue and egress onto Cookstown Road via a one way system through the subject site; -All associated site development works, services provision, connection to the water supply, foul and surface water networks on First Avenue and Cookstown Road including partial diversion of the foul line to the north east of the site at First Avenue, temporary foul pump station. attenuation/bioretention systems, vehicular and pedestrian access including internal road and footpaths, pedestrian facilities/public realm upgrade works, landscape and boundary treatment works, tree removal, bicycle storage (302 no. total spaces) comprising 276 no. spaces (serving proposed mixed use development) and 26 no. spaces (serving concurrent transitional care facility application), car parking (32 no. total spaces) comprising 15 no. spaces (serving proposed mixed use development) and 17 no. spaces (serving concurrent transitional care facility application), 2 no loading bays (one each on First Avenue and Cookstown Road), 2 no. setdown/loading areas to the internal road and 1 no. ambulance setdown space serving the adjacent concurrent proposed Transitional Care Facility. The concurrent application has been made to South Dublin County Council regarding a 131 bed Transitional Care Facility on the western portion of the site (SDCC Ref SD22A/0361 refers) currently under appeal to An Bord Pleanála (ABP Ref 317394).
Demolition of all existing 1-3 storey industrial/commercial structures and small cafe on site totalling c.5,500sq.m in area; Construction of a 1-5 storey Transitional Care Facility (step-up/step-down) providing 131 bedspaces over partial basement (total floor area c.6,743sq.m) with central courtyard ( c.519sq.m ); The basement consists of a sprinkler tank and pump rooms, water tank room, plant room and workshop; Provision of dining and kitchen areas, siting/family rooms, activity rooms, coffee dock, hair salon, oratory, lobbies/reception areas, ancillary offices and staff areas, stores, toilets, shower/changing facilities, ESB substation, generator, switchroom, service yard and waste areas serving the facility; Lobbies, stair/lifts, photovoltaic panels and green roofs throughout; Partial provision of the pocket park identified in the Tallaght LAP (c.1,286sqm); New vehicular access from First Avenue and egress onto Cookstown Road via a one-way system through the subject site; Entrance signage on the eastern elevation of the proposed facility; All associated site development works, services provision, connection to the water supply, foul and surface water networks on First A venue and Cookstown Road including partial diversion of the foul line to the north east of the site at First A venue, temporary foul pump station, attenuation/bioretention systems, vehicular and pedestrian access including internal road and footpaths, interim pedestrian facilities/public realm upgrade works, landscape and boundary treatment works, tree removal, bicycle storage (76 total spaces), car parking (32 total spaces), set-down parking spaces, 1 ambulance set-down space serving the facility and delivery/loading areas to First A venue.
The retention permission of all new shed walls at ground & first floor level that are connected to existing shed at rear of site and roof of shed.
Permission for a new first floor extension with new roof and roof windows to shed at rear of site and all associated site works; Retention of all new shed walls at ground floor and first floor level only that are connected to existing shed at rear of site and all associated site works.
Removal of existing front boundary wall and right hand side pillar. Rebuild pillar in new Location. Additional pavement dishing and replace grass lawn with gravel finish.
A front porch, rear extension, pitched front dormer roof and a flat rear dormer roof.
Retention permission is sought for an external, timber framed, flat roof, covered seating area (15.8m²) to the rear garden at side.
Demolition of Shed to rear, construction of 1 detached 3bed 2 story house with 2 storey bay to front, 3 rooflights to rear, new vehicular access & car parking in front garden and all associated site works
The Construction of Single-Storey Coffee kiosk complete with signage, site entrance, driveway and car parking area and ancillary site works for 10 years
The existing single-storey extension will be demolished, and a new single-storey extension will be added to the side of the main house, linking the two buildings. Second single-storey extension to the side of the linked building. Dormer window to the rear roof area of the new extension. New single-storey porch to the front.
Permission for a) the erection of a fully serviced part two-storey, part single storey dwelling house linked to the existing single-storey family flat, and b) the demolition of the existing single-storey store/office outbuilding, storage container, shed, canopy, and gate to the side of the existing dwelling house. All with associated and ancillary site works
Construction of additional floor area of 192.43sqm to existing warehouse and office building of 1658.44sqm, alterations to layout of 152.11sqm of existing warehouse and alterations to existing parking layout to accommodate disabled parking. New first floor of 169.75sqm internally in existing warehouse, internal alterations at ground level, 2 storey extension to southern elevation of existing warehouse to accommodate new entrance lobby and all associated site works.
Retention for 2 bay portal frame, additional floor area to existing industrial unit. Permission for roofing of 2 bay portal frame structure; extension to existing industrial unit; construction of a concrete resurfaced area in main yard; minor internal layout and elevational revisions to existing industrial unit and all associated site works including underground surface water attenuation and related utilities and works.
Construction of a new two storey, three bedroom detached house to side of existing house including a new vehicular entrance, car parking for two cars, dishing of kerb, new boundary walls and all associated site works.
Retention permission and permission for development at the existing shotblasting facility. The total planning application site area extends to approximately 0.92 Ha. Retention permission is sought for: a 2 bay portal frame structure at the northern end of the facility and a 153 sq.m floor area extension at the southern end of the facility. Permission is sought for: a 716 sq.m floor area extension at the southern end of the facility; roof to enclose the 2 bay portal frame structure (for which retention permission is sought) minor changes to the internal layout including relocation of toilet and provision of ancillary office space; concrete resurfacing of the main yard area; minor elevational changes; and all associated site and development works above and below ground.
Retention Planning Permission for (a) an existing side pedestrian entrance/access gate leading onto Treepark Road, and (b) an existing high-level boundary wall to the front of the existing dwelling house.
Single storey attached metal storage unit floor area of 11sq.m and metal canopy to front elevation; Internal extension of first floor area by 50sq.m
First floor pitched roof extension over existing ground floor consisting of 3 bedrooms with a dormer window to front and side roof; 4 roof lights to side roof; extension to porch at ground floor level to front of dwelling.
Construction of a single storey extension to the rear and widen existing vehicular entrance.
Garage conversion and extensions at first floor to side and at ground floor with level access deck to rear.