To construct new site entrance and connecting driveway to serve an existing dwelling/site curtilage including all associated site works
For the construction of a detached dwelling house, detached shed, new vehicular entrance and piers in existing splayed wall, connection to existing waste water treatment system and all ancillary site works
To RETAIN changes to original house plans submitted for grant of planning permission P8/18299 and planning PERMISSION to raise the front boundary wall and entrance to 2 metres with finish to match existing wall finish and associated site development works
To RETAIN a ground floor extension with alterations to existing house and for planning PERMISSION to construct a detached garage building with new entrance, for insertion of dormer windows and alterations to existing attic space, and a yoga studio extension to first floor flat roof to existing house, solar panels and all associated site development works
To RETAIN changes to original house plans submitted for grant of planning permission P8/10268, and for detached shed and all associated site development works
For the construction of a dwelling house, detached garage, new vehicular splayed entrance and piers, new wastewater treatment and percolation system, and all associated site works
A solar farm on a site of 70 hectares consisting of the following: 309,008 sq. m. of solar photovoltaic panels on ground mounted steel frames; a 38 kV electrical substation with electrical control building and associated compound with palisade fence; the installation of 21 electrical skids within 7 no. electrical compounds (with acoustic barrier fencing); underground power and communication cables and ducts, including underground cabling along the L3056 public road; new and upgraded internal access tracks (including stream crossings as required); 3 no. upgraded site entrances to the public road (one entrance to L-3054 (Lackyle Heights), and 2 no. entrances to L-30541); boundary fencing (including 607m of acoustic barrier fencing on the eastern boundary); landscaping and biodiversity enhancement measures; and all associated ancillary development, site works and services. The solar farm will be operational for 40 years. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and will be submitted to the planning authority with the application.
To apply for a 10-year planning permission for development at land to the west/north west of Ardnacrusha within the townlands of Castlebank, Glenlon North, Glenlon South, Drummin and Ballykeelaun, for the development of a solar farm on a site of approximately 70 hectares consisting of the following; up to 309,008 sq.m of solar photovoltaic panels on ground mounted steel frames; a 38 kV electrical substation with electrical control building and associated compound with palisade fence; the installation of up to 21 no. inverter/transformer stations on 7 no. hardstanding locations; underground power and communication cables and ducts, including underground cabling along the L3056 public road; new and upgraded internal access tracks (including stream crossings as required); 3 no. upgraded site entrances to the public road (one entrance to L-3054 (Lackyle Heights), and 2 no. entrances to L-30541); boundary fencing; landscaping and biodiversity enhancement measures; and all associated ancillary development, site works and services. The solar farm will be operational for 40 years. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and will be submitted to the planning authority with the application
Of as constructed detached domestic garage, retention of minor amendments to dwelling as previously granted (Planning Permission 16/681 refers) and all associated ancillary and incidental works.
For development consisting of the change of roof material on the dwelling house from Thatch to Slate
Of an accessible bedroom, stables, outhouse and associated site works
For a new part single storey, part two storey dwelling house with garage and associated landscaping boundary walls, fences, entrance, and all associated site services and works
For development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
For a revised site boundary and revised position of a single 800kW wind turbine, 73 metres to hub height as granted under P10/453 and P15/812
To construct dwelling house, garage, waste water tratment system, percolation area, entrance and all associated site works
For a new single storey dwelling house, new domestic garage, new site entrance adjacent to the existing site entrance to serve the existing neighbouring dwelling at Kincora House and all ancillary site works above and below ground
For the construction of a new fully serviced two storey detached dwelling house, new single storey detached garage, new vehicular entrance landscaping and boundary treatments, new connection to existing Roo West group water scheme and installation of a new wastewater treatment system and percolation area together with all ancillary and associated site works
For development which will consist of: 1. The removal of the front boundary wall to provide vehicle access for private parking purposes with suitable surface finish, 2. And all associated site works
To RETAIN change of use of an existing agricultural storage building to a commercial warehouse building, the RETENTION of the construction of two commercial warehouse buildings, all to the rear of the site, all to be used for storage ancillary to the adjacent Limerick Blow Moulding factory building and all associated site works both above and below ground
For the following: 1. Demolish existing shed to facilitate a rear extension to the existing dwelling. 2. Widen the existing vehicular entrance. 3. Elevational changes to the house. 4. All ancillary site works
For development which will consist of planning permission for a period of 10 years to construct and complete a Solar Energy development with a total site area of 36.70 hectares, to include the construction of PV panels mounted on metal frames, a substation, inverter substations, internal access tracks (new and upgraded), underground cabling, security fencing with CCTV cameras and access gates, a temporary construction compound and all ancillary grid infrastructure and associated works. The Solar Farm would be operational for 40 years. The proposed grid route will connect the substation at the application site to the existing grid infrastructure at Ardnacrusha Power Station via a 38kV underground cable which is 1.2km in length (320m of which is on the local road L3056). A Natura Impact Statement (NIS) will be submitted with this application
Of garden shed erected to the rear of house and for PERMISSION to convert same for use as a "Granny Flat" for private family use and install an effluent treatment system and percolation area and all associated site works
For the construction of a detached single storey dwelling, detached domestic garage, new entrance, onsite wastewater treatment system, together with all associated ancillary and incidental site works
To construct an extension to rear of existing dwelling, refurbish existing dwelling, install new waste water treatment plant and percolation area and construct a garage
To construct a single dwelling house, garage, advanced wastewater treatment system and ancillary site woks
To construct a single dwelling house, garage, advanced wastewater treatment system and ancillary site works
To construct a new entrance, dwelling house, garage/shed, wastewater treatment system and all associated works
To construct a single dwelling house, garage, advanced wastewater treatment system and ancillary site works
To demolish existing substandard house and erect a replacement house, install an effluent system and percolation area and all associated site works
To Extend the Appropriate Period of Planning for P21-600 to construct a single dwelling house, garage, advanced wastewater treatment system and ancillary site works
To construct a single dwelling house, garage, advanced wastewater treatment system and ancillary site works
Of commercial store
Of an existing detached garage and all ancillary site works
To construct a Slatted Shed and associated site works
Of the detached garage on site, the altered fenestration to the dwelling house, the existing entrance as built and all associated and ancillary site works
To construct an extension to the existing dwelling house and to upgrade the existing wastewater treatment system along with ancillary site works
For construction of detached agricultural equipment storage building, together with all associated ancillary and incidental works
To construct dwelling house, garage, waste water treatment system, percolation area, entrance and all associated site works
For the construction of a detached two storey dwelling, new entrance, onsite wastewater treatment system, bored well, together with all associated ancillary and incidental site works
Of (1) conservatory, (2) attic conversion, (3) extension to rear & (4) detached garage
To RETAIN dog kennels, cattery, covered run, fencing and associated site works, all as constructed
For the construction of a dwelling house, garage and proprietary waste treatment plant, bored well, new entrance and including all ancillary site works
For the construction of a single storey dwellinghouse, garage & proprietary waste treatment plant, bored well, new entrance and including all ancillary site works
Of existing carparking area, sales cabin office, storage unit and planning PERMISSION for new signage with all ancillary site works
For a 10 year planning permission for a solar array at Ballyglass, Coolderry, Dromintobin North, Reanabrone, and Oakfield (townlands) Ardnacrusha, Co Clare. The development will consist of c265,000 m2 of solar panels on ground mounted frames, 8 no. single storey control cabins with associated electrical transformer units and hardstand areas, 2 no. ring main units, underground cabling within the solar array site and within the L70382 public road to connect solar array field parcels, security fencing, CCTV, access tracks (upgrade of existing and new), upgrades to four existing agricultural field entrances on the R463, l3046 and L70382 and creation of new entrance on L70382, temporary construction compound, landscaping and all associated ancillary apparatus and development works. The solar array will connect to the national grid and will have an operational lifespan of 35 years. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and will be submitted to the planning authority with the application
For a connection to the public sewerage system for an existing single dwelling
For the development which will consist of works as follows: Change of site boundaries from that previously granted under P03/115
To construct dwelling house, garage, bored well, waste water treatment system, percolation area, entrance and all associated site works
Of the following development on property at Larkin's Bar, Larkin's Cross - change of use of first floor from residential use to use as consulting/treatment rooms, as constructed detached outdoor function room and additional bar together with all associated ancillary and incidental works
For a two storey extension to and alterations / refurbishment of, an existing single storey cottage (including replacing the roof and adding velux rooflights), a new detached garage and a replacement waste water treatment system and all associated works