A two storey detached dwelling, all associated waste drainage measures. Permission is also sought for all site development works including boundary treatment and associated site ancillary works. Add Info received 11th December 2020. Add Info deemed Significant 16th December 2020. Revised Public Notices received 22nd December 2020. Clarification of Add Info received 3rd February 2021.
Planning permission sought for new stand-alone garage (75m2) and associated site works to rear of existing dwelling.
Single storey extension to side and rear and all associated site works.
Alterations to the existing site entrance and piers to allow for increased sightlines, the relocation of a ESB pole, landscaping and all associated site and other works
Planning permission sought for relocation of
The development will consist of permission for renovation and ground floor extension to existing dwelling and all associated site works.
Planning permission sought for new single storey dwelling and associated site works to within RV village development zoned lands to rear of Doorogue House, Ballyboughal, Co Dublin, A41 KV10.
Planning permission for a proposed single storey extension to the rear of existing single storey gate lodge with hip roof to match existing, internal layout modifications, landscaping, modifications to existing rear courtyard, new windows, SUDS and all associated site and other works.
A new residential infill development at The Grange, Ballyboughal, Fingal, Co. Dublin with development to consist of the provision of 3 no. detatched two storey 4 bed dwellings, a bin store, the relocation of a ESB pole local alteration to existing footpaths, alterations to the existing site entrance and existing boundary walls, landscaping, soakaways, SUDS with overflow to existing stream, connection to existing pumping station and all assoicated site and other works.
Seeking permission for a proposed single storey dwelling, storage structure, site walls, relocation of entrance gates granted under planning with Reg. Ref. No. F23A/0493, changes to landscaping, widening of the existing driveway to 5.5m wide, mini roundabout, SUDS (rainwater butts & permeable surfaces), connection to existing services and all associated site and other works. AI received 30/01/2025
The development development on a 2.4 ha site will consist of a 38 kV electrical substation. The development will include the following elements: (1) Substation compound of approximately 700 m2 with 2.6 m high palisade fence around the entire perimeter of the substation, with the following electrical plant within the substation: - 1 No. prefabricated 38 kV GIS module and foundation (c. 22m2, 4.5 m high), - 1 No. prefabricated MV GIS module and foundation (c. 5 m high), - 1 No. 38/20 kV 5 MVA transformer and associated bund (c. 12m2, 4.0 m high); (2) Telecoms SCADA pole of approximately 10 metres in height; (3) Associated and ancillary outdoor electrical equipment and other apparatus, including installation of underground cables; (4) Replacement of existing 38 kV timber intermediate poleset (IMP18) in the northwest corner of the site with a similar timber poleset to support 38 kV cable connection; (5) The site will be accessed from the existing entrance off Batter Lane. The existing access road of approximately 125 m metres in length will be widened to a general width of 5 m, from the public road to the substation property boundary, and there will be minor modifications to the existing vehicular entrance including a new entrance gate. An access road of approximately 100m in length and generally five metres in width will be constructed along the western side of the property to the proposed substation. (6) Compound lighting, boundary treatment, associated drainage, landscaping and all ancillary site development works. For information purposes only - it is ESBs intention to upgrade the proposed 38 kV substation, that is the subject of this application, with a 110 kV substation within a period of 5 years, subject to a SID planning approval from An Bord Pleanála (ABP).
Planning permission for a proposed single storey dwelling. storage structure, site walls and gates, relocation of existing site entrance gates, soakpit, landscaping, SUDS and all associated site and other works at The Grange, Ballyboughal, Fingal, Co. Dublin. AI rcvd 11//24
A single storey storage shed (area: 226.50m²) with rooftop solar panels with local alteration to existing driveway and landscaping, permeable paving, soakaway and all associated site and other works. AI received 13/02/23
The provision of 4 no. detached two storey 3-bed dwellings, local alteration to existing boundary walls, landscaping, paving, walls and fences, solar panels, rainwater harvesting tanks with overflow to existing stream (SUDS), connection to existing pumping station and all associated site and other works.
Planning permission for a new residential infill development at The Grange, Ballyboughal, Fingal, Co. Dublin, with the development to consist of the provision of 2 no. detached two storey 4-bed dwellings, local alteration to existing boundary walls, landscaping, swale with overflow to existing stream (SUDS), connection to existing pumping station and all associated site and other works.
The provision of 4 no. detached two storey 3-bed dwellings, local alteration to existing boundary walls, landscaping, paving, walls and fences, solar panels, rainwater harvesting tanks with overflow to existing stream (SUDS), connection to existing pumping station and all associated site and other works.
The provision of 1 no. detached two storey, 4-bed dwelling. local alteration to existing boundary walls, landscaping, swale with overflow to existing stream (SuDS), connecting pump station and all associated site and other works.
Permission for a proposed single storey dwelling, storage structure, site walls, relocation of new entrance gates relocated under planning with Reg. Ref. No. F24A/0907E, new block boundary wall, changes to landscaping, relocate mini-roundabout granted under planning with Reg. Ref. No. F24A/0907E, SUDS (swale, rainwater butts & permeable surfaces), connection to existing services and all associated site and other works.
Retention planning permission for existing commercial unit no. 2 mezzanine, consisting of offices, reception area, general stores, workshop, and staff canteen and wcs, along with attached compound. ( This planning application is for the retention of change of use from approved commercial agricultural use. ( Reg Ref F97A/1010 at unit 2 Doorogue, Ballyboughal, Co. Dublin.
Permission for the construction of a two storey dwelling, with a detached domestic garage, new site entrance, the installation of a wastewater disposal system and all associated site works.
Construction of a two storey style dwelling, with a detached domestic garage, new site entrance, the installation of a wastewater disposal system and all associated site works.
Planning Permission sought for new single storey cottage (86m2) and associated site works including upgraded existing entrance to rear of existing dwelling. Additional Information received 07/11/25
A new residential infill development at The Grange, Ballyboughal, Fingal, Co. Dublin, with development to consist of the provision of 1 no. detached single storey 2-bed dwelling, local alteration to existing boundary walls, landscaping, paving, walls and fences, solar panels, rainwater harvesting tank with overflow to existing stream (SUDS), connection to existing pumping station and all associated site and other works. AI Rcvd 05/12/2024
Development on a site of 0.265 hectares. The proposed development consists of a change of use of a previously approved agricultural sales and service workshop premises (floor area 509 sq.m) to commercial enterprise and/or community use, to accommodate village-scale uses in accordance with the RV (Rural Village) zoning objective. This development includes associated services, car parking, and all ancillary site works.
Permission for the provision of 1 no. single storey storage shed, local alteration to existing boundary walls, landscaping, soakpit, SUDS and all associated site and other works.
Planning permission for the provision of a
Construction of a 2-storey detached dwelling, detached domestic garage, new vehicular entrance & all associated siteworks. AI received 05/05/23 SAI received 17/05/23
Retention of a front boundary wall and gates
Permission for a new residential infill development to consist of the provision of one proposed single storey dwelling, timber storage structure, swale, landscaping, site walls, SUDS, connection to existing pumping station and all associated site and other works.
Planning Permission for a new residential infill development with development to consist of the provision of one proposed single storey dwelling, timber storage structure, swale, landscaping, site walls, SUDS, connection to existing pumping station and all associated site and other works.
Amendments to the approved solar photovoltaic ("PV")
Planning Permission for the conversion of an existing attic roof space, new access stairs, roof windows to the rear, dormer roof to the rear and all associated works.
Construction of a new detached 2 storey 4 bedroom dormer bungalow located to the north of the existing dormer bungalow with new wastewater treatment system and upgraded vehicular entrance off Balheary Road and all associated works.
The development will consist of a single storey granny flat connected to the existing house and consisting of a lobby, lounge/kitchen, main bedroom, carers bedroom, bathroom and utility room all to rear of existing house. AI received 06/10/23
Planning Permission for alterations to part of an existing granted planning application Reg. Ref. F23A/0034 for a proposed warehouse development with ancillary office and staff facilities at Staffordstown Business Park, Co. Dublin. The subject alterations for which planning permission is sought for are as follows: The development will consist of: amendments to the warehouse development permitted under Fingal County Council Reg. Ref. F23A/0034 to 'Unit A' only. The amendments principally comprise: 1. Change of area of the permitted structure (9,555 sqm warehouse with 638 sqm ancillary office and staff facilities) to 5,492 sqm warehouse with 914 sqm ancillary office and staff facilities with maximum height of 18.9 m. 2. Portion of rear yard to be used for external storage (3,919 sqm), 3.5 m high, of goods related to the construction industry, specifically drainage related products – pipes, manholes and surface water drainage components. Rear yard to incorporate HGV marshalling, loading and unloading plus related parking for own fleet vehicles. 3. Elevational alterations to reflect the proposed floor plans. 4. Provision of a ground level sprinkler water supply tank, 10m diameter, 9m high, to the eastern boundary, with an additional site area of 0.10 ha/0.24 ac to accommodate the tank, bringing the total overall development area to 2.53 ha/6.25 ac. 5. Provision of pump house serving the proposed water tank, 48 sqm, 2.8 m high, adjacent to the above referenced water tank. 6. Provision of an outdoor smoking shelter, 3.9 sqm, 2.68 m high to the western side of the proposed office block. 7. Relocation of the permitted covered bicycle parking to the eastern side of the proposed office block. 8. Rearrangement of the permitted car parking and reduction of the permitted spaces from 82 no. to 62 no., with additional 6 no. Motorcycle parking bays. 9. Provision of an ESB Substation, 33 sqm, 3 m high, to the front north boundary. 10. Modifications to boundary treatments, gates, external surface finishes, drainage and all associated site works above and below ground. All other details will remain as per the granted planning application Reg. Ref. F23A/0034. Additional Information Received 30/03/2026
Retention permission for existing single storey utility extension (7.29m2) and full planning permission for (a) proposed single storey extension to existing single storey sunroom at rear with roof window (6.5m2 increase), (b) proposed replacement single storey porch and new single storey office room to side of dwelling with roof windows (16.77m2 increase), (c) proposed two storey rear facing extension to Livingroom (6.85m2 increase) and bedroom & ensuite (11.70m2 increase) and enlarging size of rear facing bedroom window and internal modifications.
Planning permission is sought for an attic conversion, to include three number velux windows to the front elevation and all associated site works.
Nethercross Ltd. intend to apply for retention permission
The conversion of the existing garages to a living area and kitchen with a first floor extension above the converted garage, incorporating a first floor bedroom, storage room and bathroom with two front facing roof dormers.
The development will consist of a new ancillary family accommodation consisting of the conversion of the existing garages to a living area with a first floor extension above the converted garage, further incorporating a first floor bedroom, storage room and bathroom with two front facing roof dormer windows
Permission for increase in height of existing boundary wall and vehicular gate at the entrance to 21 Dooroge Woods comprising a 1.8 meter high wall and vehicular gate previously granted under F16A/0484. AI received 24/05/21 AI deemed significant Revised public notices received 11/06/21
The construction of an attic dormer window to the rear of existing pitched roof and all associated site works necessary to facilitate the development.
The construction of 2 no. industrial/ warehousing units on an overall applicable site area of approx. 6.25ha. Unit A consists of an industrial building of approx. 9,555 sqm with 638 sqm of ancillary office and staff facility space, together with 82 no. car parking spaces and 72 no. cycle parking spaces. Overall height of approx. 18.3m. Unit B consists of an Industrial building of approx. 7,775 sqm with 824 sqm of ancillary office and staff facility space, together with 83 no. car parking spaces and 48 no. cycle parking spaces. Overall height of approx. 15.3m. Approximately 445m long, 7.5m-9m wide carriageway for the internal road layout to the future phase of Staffordstown Business Park and associated future industrial/commercial units (subject to separate planning application). A 1.5m footpath on both sides of the road (approximately 980m in length); and grass verges. The road, grass verges and footpath will extend to connect to the existing road constructed under Reg. Ref. F07A/1477. The site and access road levels will be raised and compensatory storage provided. The proposed development will also consist of a new watermain connection, proposed surface water drainage and foul sewer drainage connections and underground attenuation tank. Together with all ancillary drainage and site development works associated within the proposed development. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with this planning application. The planning application and NIS may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy at the offices of Fingal County Council, Fingal County Hall, Main Street, Swords, Fingal, Co. Dublin, during its public opening hours. AI received 8/6/2023 AI deemed significant ** Revised Public Notices received 16/6/2023
The development will consist of the construction of a 60 sq.m rear and side extension consisting of kitchen/dining/living area, a playroom and new bathroom. Increase height of existing flat roof by 600mm. Relocation of entrance at front elevation. The change of use of existing living room to bedroom. Demolition of existing concrete block shed, 15 sq.m. Replacement of existing septic tank with new waste water treatment plant and associated site works.
The development will consist of:
Permission for construction of a single storey dwelling, effluent treatment system and all associated site works. AI received 09/07/21
We, Raymond and Caroline Coleman, intend to apply for retention permission on lands at Coldwinters, Blakes Cross, Lusk, Co. Dublin. The development consists of the use of the site for the storage of empty skip containers; the retention of an open storage structure on site; and all associated works necessary to facilitate the development.
Alterations to existing hip roof to side to create gable roof to accommodate new attic stairs to allow for proposed conversion of attic space i into a non-habitable storage room, including rooflights to rear roof slope and all associated site works.
Planning permission for new enlarged carpark area to south with new Carwash, Dog Wash, Laundromat, Plant Room, SuDS drainage landscaping, seating area & all associated site works.
New enlarged carpark area to south with new Carwash, Dog Wash, Laundromat, Plant Room, Biodiversity Community Nature Garden, landscaping, alterations to public access, seating area & all associated site works.