Extension and alterations to existing house, together with all ancillary site works and services inclusive of new access on to public roadDecision record indexed
Change of Design from previously granted Planning Permission Reference P22/885 comprising of: 1. Reduction of factory unit from 4,295m2 to 3,623m2 2. Relocation of office block from southern to eastern side of the building and increase in floor area to 872m2 3. Relocation and reduction of carpark area to 50 spaces with revised access roads 4. Permission for 129.6 Kilowatt (324 no.) of roof mounted Photo Voltaic Solar Panels (810m2) placed on the roof, and all associated site worksDecision record indexed
Retention of changes to the existing dwelling, namely front elevational changes and extension, roof height from that previously granted under planning permission 74688 2. Retention of rear and side extension to the existing domestic dwelling. 3. Retention of the existing fuel/domestic store at the rear of the dwelling. 4. Retention of existing site boundaries and layout. together with all ancillary site works.Decision record indexed
The development will consist of, modifications to previously approved planning permission Reg Ref: P25/60421 to include an increase to the height of the approved garage to provide space for a home office and home gym for personal use. This application for permission also includes for revisions to the approved garage layout and elevations to include windows, doors and skylights to accommodate the new layout and all associated site worksGrounds not yet categorised
A single story extension to the rear of the existing property and for the demolition of the existing single story garage and garden room and construction of a new two storey dormer garage to the rear of the property and all associated site works.Decision record indexed
CONSTRUCT DETACHED DWELLING HOUSE AND DOMESTIC GARAGE ON SITE WITH ONSITE WASTEWATER TREATMENT SYSTEM AND ALL OTHER ASSOCIATED SITE WORKS.Decision record indexed
Alterations and extension to existing dwelling house, the construction of a new domestic garage and the upgrading of the existing septic tank and percolation area along with ancillary site worksDecision record indexed
The development consists of the retention of the garage (54.5m2), conservatory (16m2) and open porch (5.3m2) as constructed, an upgrade of the wastewater treatment system together with all associated ancillary site works on revised site boundaries.Decision record indexed
Changes to previous permission granted Ref. No. P21/797 to include alterations and extensions to existing commercial unit along with ancillary site work.Decision record indexed
Construction of access road to facilitate access to the existing forestry plantation. The proposed road shall have a bell mouth access onto the regional road and internal turning circle together with all ancillary site worksDecision record indexed
Refurbishment of existing dwelling and the construction of a new extension, new effluent treatment unit and percolation area with associated site worksDecision record indexed
A 3 metre extension on top of an exisitng 30 metre lattice telecommunications support structure (previously granted permission under planning reference P21/1181) to give an overall structure height of 33 metres together with antennas, dishes, associated equipment, ground-based equipment cabinets and all associated site development works for high-speed wireless data and broadband servicesDecision record indexed
RETAIN EXISTING TELECOMMUNICATIONS SUPPORT STRUCTURE (PREVIOUSLY GRANTED UNDER P05/3391) TOGETHER WITH ASSOCIATED GROUND EQUIPMENT WITHIN A FENCED COMPOUNDDecision record indexed
RENOVATION AND EXTENSION OF THE EXISTING DWELLING, INSTALLATION OF A PROPRIETARY EFFLUENT TREATMENT SYSTEM TOGETHER WITH ALL ANCILLARY SITE WORKSDecision record indexed
Retention permission for the dwelling house as constructed along with all ancillary site works, previous planning reference no. P06/2205Decision record indexed
The development will consist of: 1) retention of as built single storey garage to rear of dwelling, and 2) retention of single storey extension to side of existing dwelling and all ancillary works.Decision record indexed
SWINFORD WATER TREATMENT PLANT, KILBRIDE, SWINFORD
CONSTRUCTION OF A RAW WATER BALANCE TANK, CONSTRUCTION OF A SOLIDS RESIDUALS MANAGEMENT SYSTEM (TO INCLUDE BACKWASH SETTLEMENT AND EQUALISATION TANKS, SUPERNATANT BALANCE TANK, THICKENING TANK AND HOLDING TANK), INSTALLATION OF CHEMICAL STORAGE TANKS, INSTALLATION OF KIOSK ENCLOSURES TO HOUSE PUMPS AND ALL ANCILLARY SITE WORKSDecision record indexed
Planning Permission sought to erect new dwelling house, domestic garage, entrance, boundary walls, piers with sewerage treatment system & percolation area and all associated site works.Decision record indexed
Construction and continuous operation of an Agricultural Biogas Renewable Energy Facility consisting of; 2 no. primary digester tanks, 2 no. post digester tanks with pumproom, pasteurisation unit with auxiliary tanks, emergency flare with base and security fencing, 2 no. agricultural solid feeders with associated concrete bases, 2 no. underground pre-reception tanks, 2 no. covered agricultural digestate storage tanks, gas combined heat & power (CHP) unit with concrete base, site office/control building with associated staff car parking area and wastewater treatment system and percolation area, biogas upgrading treatment and compression system, electric transformer and sub-station with securty fence, agricultural feedstock storage clamp building, nutrient recovery system building with ancillary tanks and equipment, 4 no. Ammonium Sulphate Solution (ASS) storage tanks with concrete bases, digestate drying and pelletising building, pellet storage building, weighbridge, construct new access and entrance improvement works, site lighting with security cameras, surface water drainage system with storage pond and discharge system, boundary earth bunded areas, landscaping and boundary security fencing. All ancillary works located on lands measuring 4.0 hectares. The planning application is accompanied by a Natura Impact Statement (NIS)Grounds not yet categorised
CONSTRUCTION AND CONTINUOUS OPERATION OF AN AGRICULTURAL BIOGAS RENEWABLE ENERGY FACILITY CONSISTING OF; 2 NO. PRIMARY DIGESTER TANKS, 2 NO. POST DIGESTER TANKS WITH PUMPROOM, PASTEURISATION UNIT WITH AUXILIARY TANKS, EMERGENCY FLARE WITH BASE AND SECURITY FENCING, 2 NO. AGRICULTURAL SOLID FEEDERS WITH ASSOCIATED CONCRETE BASES, 2 NO. UNDERGROUND PRE-RECEPTION TANKS, 2 NO. COVERED AGRICULTURAL DIGESTATE STORAGE TANKS, GAS COMBINED HEAT & POWER (CHP) UNIT WITH CONCRETE BASE, SITE OFFICE/CONTROL BUILDING WITH ASSOCIATED STAFF CARPARKING AREA AND WASTEWATER TREATMENT SYSTEM AND PERCOLATING AREA, BIOGAS UPGRADING TREATMENT AND COMPRESSION SYSTEM, ELECTRIC TRANSFORMER AND SUB-STATION WITH SECURITY FENCE, AGRICULTURAL FEEDSTOCK STORAGE CLAMP BUILDING, NUTRIENT RECOVERY SYSTEM BUILDING WITH ANCILLARY TANKS AND EQUIPMENT, 4 NO. AMMONIUM SULPHATE SOLUTION (ASS) STORAGE TANKS WITH CONCRETE BASES, DIGESTATE DRYING AND PELLETISING BUILDING, PELLET STORAGE BUILDING, WEIGHBRIDGE, CONSTRUCT NEW ACCESS AND ENTRANCE IMPROVEMENT WORKS, SITE LIGHTING WITH SECURITY CAMERAS, SURFACE WATER DRAINAGE SYSTEM WITH STORAGE POND AND DISCHARGE SYSTEM, BOUNDARY EARTH BUNDED AREAS, LANDSCAPING AND BOUNDARY SECURITY FENDING AND ALL ANCILLARY WORKS LOCATED ON LANDS MEASURING 4.0 HECTARES. THIS APPLICATION IS ACCOMPANIED BY A NISGrounds not yet categorised
Upgrade of raw water pumps and controls, modification of underground tanks to provide a dedicated raw water tank, installation of equipment to improve process including a new flocculation tank, clarification tank, dissolved air flocculation. UV reactor dedicated chemical delivery area, and associated pumps, piping and valves and accessories. Construction of solids management consisting of tank for settlement and associated pumps and infrastructure. Installation of new concrete slab and installation of new sludge holding tank (45m3), settlement tank, sludge balancing tank, alum tank, DAF and all associated ancillary works and associated engineering works. Works also include the installation of pumps and pipework to the treated water storage tank including a scrubber within the Callow Water Reservoir siteDecision record indexed
CONSTRUCTION OF A NEW DWELLING HOUSE, DOMESTIC GARAGE, SEPTIC TANK AND PERCOLATION AREA TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICESDecision record indexed