Retention of changes to the existing dwelling, namely front elevational changes and extension, roof height from that previously granted under planning permission 74688 2. Retention of rear and side extension to the existing domestic dwelling. 3. Retention of the existing fuel/domestic store at the rear of the dwelling. 4. Retention of existing site boundaries and layout. together with all ancillary site works.Decision record indexed
Changes to previous permission granted Ref. No. P21/797 to include alterations and extensions to existing commercial unit along with ancillary site work.Decision record indexed
SWINFORD WATER TREATMENT PLANT, KILBRIDE, SWINFORD
CONSTRUCTION OF A RAW WATER BALANCE TANK, CONSTRUCTION OF A SOLIDS RESIDUALS MANAGEMENT SYSTEM (TO INCLUDE BACKWASH SETTLEMENT AND EQUALISATION TANKS, SUPERNATANT BALANCE TANK, THICKENING TANK AND HOLDING TANK), INSTALLATION OF CHEMICAL STORAGE TANKS, INSTALLATION OF KIOSK ENCLOSURES TO HOUSE PUMPS AND ALL ANCILLARY SITE WORKSDecision record indexed
The development will consist of the demolition of single storey extension to rear, construction of a new single storey extension to rear and side, renovation of existing dwelling, on-site waste water treatment system together with ancillary site development works.Decision record indexed
Construction of a new dwelling house, construction of a domestic garage and provision of a proprietary wastewater treatment systemDecision record indexed
Construction of access road to facilitate access to the existing forestry plantation. The proposed road shall have a bell mouth access onto the regional road and internal turning circle together with all ancillary site worksDecision record indexed
RENOVATION AND ALTERATION OF EXISTING HOUSE AND THE ADDITION OF A NEW 148SQM SINGLE STOREY EXTENSION, INCREASING THE OVERALL FLOOR AREA FROM 93SQM TO 220SQM. PERMISSION IS ALSO SOUGHT FOR REPLACING THE EXISTING SEPTIC TANK WITH A NEW SEPTIC TANK, ASSOCIATED PERCOLATION AREA AND ALL OTHER SITE DEVELOPMENT WORKS.Decision record indexed
CONSTRUCTION OF A NEW DWELLING HOUSE, DOMESTIC GARAGE, SEPTIC TANK AND PERCOLATION AREA TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICESDecision record indexed
Construction of a new dwelling house, domestic garage, septic tank treatment system and percolation area along with ancillary site worksDecision record indexed
The development will consist of: 1) retention of as built single storey garage to rear of dwelling, and 2) retention of single storey extension to side of existing dwelling and all ancillary works.Decision record indexed
CONSTRUCT A 30 METRE MULTI-USER LATTICE TOWER TELECOMMUNICATIONS STRUCTURE, CARRYING ANTENNA AND DISHES ENCLOSED WITHIN A 2.4 METRE HIGH PALISADE FENCE COMPOUND WITH ASSOCIATED GROUND EQUIPMENT AND ASSOCIATED SITE WORKS INCLUDING NEW ACCESS TRACKDecision record indexed
1. Full Planning Permission for the demolition of existing sheds and decommissioning of existing septic tank system, the construction of a single storey extension to the side of an existing dwellinghouse, together with the installation of a new septic tank and percolation area and all ancillary site works, 2. Retention Permission (Temporary) for a mobile home while the above mentioned works are being carried out on site,Decision record indexed
Planning permission for development comprising; Extension and alterations to existing two storey Dwelling House, demolition of existing extensions, demolition of part of an existing outbuilding and a farm shed, upgrade of existing wastewater treatment system and all ancillary site works and services at Lisheenabrone, Swinford, Co. Mayo Height of proposed Extension building: 7.35mDecision record indexed
Planning permission to construct a new dwelling house, new septic tank/sewerage treatment system and associated siteworks and services.Decision record indexed
Retention permission for existing dwelling house as constructed along with all ancillary site works, previous planning ref No. P95/807Decision record indexed
Construction and continuous operation of an Agricultural Biogas Renewable Energy Facility consisting of; 2 no. primary digester tanks, 2 no. post digester tanks with pumproom, pasteurisation unit with auxiliary tanks, emergency flare with base and security fencing, 2 no. agricultural solid feeders with associated concrete bases, 2 no. underground pre-reception tanks, 2 no. covered agricultural digestate storage tanks, gas combined heat & power (CHP) unit with concrete base, site office/control building with associated staff car parking area and wastewater treatment system and percolation area, biogas upgrading treatment and compression system, electric transformer and sub-station with securty fence, agricultural feedstock storage clamp building, nutrient recovery system building with ancillary tanks and equipment, 4 no. Ammonium Sulphate Solution (ASS) storage tanks with concrete bases, digestate drying and pelletising building, pellet storage building, weighbridge, construct new access and entrance improvement works, site lighting with security cameras, surface water drainage system with storage pond and discharge system, boundary earth bunded areas, landscaping and boundary security fencing. All ancillary works located on lands measuring 4.0 hectares. The planning application is accompanied by a Natura Impact Statement (NIS)Grounds not yet categorised
CONSTRUCTION AND CONTINUOUS OPERATION OF AN AGRICULTURAL BIOGAS RENEWABLE ENERGY FACILITY CONSISTING OF; 2 NO. PRIMARY DIGESTER TANKS, 2 NO. POST DIGESTER TANKS WITH PUMPROOM, PASTEURISATION UNIT WITH AUXILIARY TANKS, EMERGENCY FLARE WITH BASE AND SECURITY FENCING, 2 NO. AGRICULTURAL SOLID FEEDERS WITH ASSOCIATED CONCRETE BASES, 2 NO. UNDERGROUND PRE-RECEPTION TANKS, 2 NO. COVERED AGRICULTURAL DIGESTATE STORAGE TANKS, GAS COMBINED HEAT & POWER (CHP) UNIT WITH CONCRETE BASE, SITE OFFICE/CONTROL BUILDING WITH ASSOCIATED STAFF CARPARKING AREA AND WASTEWATER TREATMENT SYSTEM AND PERCOLATING AREA, BIOGAS UPGRADING TREATMENT AND COMPRESSION SYSTEM, ELECTRIC TRANSFORMER AND SUB-STATION WITH SECURITY FENCE, AGRICULTURAL FEEDSTOCK STORAGE CLAMP BUILDING, NUTRIENT RECOVERY SYSTEM BUILDING WITH ANCILLARY TANKS AND EQUIPMENT, 4 NO. AMMONIUM SULPHATE SOLUTION (ASS) STORAGE TANKS WITH CONCRETE BASES, DIGESTATE DRYING AND PELLETISING BUILDING, PELLET STORAGE BUILDING, WEIGHBRIDGE, CONSTRUCT NEW ACCESS AND ENTRANCE IMPROVEMENT WORKS, SITE LIGHTING WITH SECURITY CAMERAS, SURFACE WATER DRAINAGE SYSTEM WITH STORAGE POND AND DISCHARGE SYSTEM, BOUNDARY EARTH BUNDED AREAS, LANDSCAPING AND BOUNDARY SECURITY FENDING AND ALL ANCILLARY WORKS LOCATED ON LANDS MEASURING 4.0 HECTARES. THIS APPLICATION IS ACCOMPANIED BY A NISGrounds not yet categorised
Retention of developments on site namely: Construction of Domestic Garage and Domestic Fuel Store, together with all ancillary site works.Decision record indexed
Planning Permission for development consisting of construction of a new slatted shed and underground slurry storage tank along with all associated site works There will be one building and all effluent will be collected and stored in the proposed/existing slatted tanks. The slatted shed will be 6.464m in height and is going to be constructed in an existing farmyard our clients family have been farming in for years.Decision record indexed
CONSTRUCTION OF A NEW DWELLING HOUSE ALONG WITH A SEPTIC TANK AND PERCOLATION AREA AND DOMESTIC GARAGE ALONG WITH ALL ANCILLARY SITE WORKSDecision record indexed
CONSTRUCT DETACHED DWELLING HOUSE AND DOMESTIC GARAGE ON SITE WITH ONSITE WASTEWATER TREATMENT SYSTEM AND ALL OTHER ASSOCIATED SITE WORKS.Decision record indexed
1. Retention of changes and rear extension to the existing dwelling, 2. Retention of the structure on site containing an Independent Living Unit and a remote working unit. together with all ancillary site works.Decision record indexed
Construction of an extension to an existing dwelling house, decommissioning of existing foul water system and installation of a new wastewater treatment system and all ancillary worksDecision record indexed