CONSTRUCTION OF A CAR PORT TO THE SIDE OF DWELLING HOUSE CURRENTLY UNDER CONSTRUCTION UNDER PLANNING REF. NO. 14/50495 AND 20/50008 AND ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
DEMOLITION OF EXISTING DETACHED GARAGE AND CONSTRUCTION OF EXTENSION TO SIDE AND REAR OF EXISTING DWELLING HOUSE, INCLUDING ALL ELEVATIONAL AMENDMENTS AND ALTERATIONS TO EXISTING DWELLING HOUSE, CONSTRUCTION OF NEW DETACHED DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
DEMOLITION OF EXISTING TWO STOREY DWELLING DUE TO DEFECTIVE CONCRETE BLOCKS AND CONSTRUCTION OF A SINGLE STOREY REPLACEMENT DWELLING INCLUDING CONNECTION TO EXISTING SEPTIC TANK AND ALL ASSOCIATED SITE WORKSDecision record indexed
(1) DETACHED DOMESTIC GARAGE AND STORAGE SHED WITH ATTACHED FUEL STORE AND PERMISSION FOR (1) DEMOLITION OF EXISTING DWELLING HOUSE CONSTRUCTED WITH DEFECTIVE CONCRETE BLOCKWORK AND CONSTRUCTION OF A REPLACEMENT DWELLING HOUSE AND ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
DETACHED STORAGE SHED AND PERMISSION FOR CONSTRUCTION OF EXTENSION AND CHANGE OF USE OF PART OF EXISTING DETACHED STORAGE SHED TO PROVIDE A SELF-CONTAINED RESIDENTIAL ANNEX, CONNECTION INTO EXISTING SEPTIC TANK SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
(1) ALTERATION OF THE PERMITTED RIDGE HEIGHT AND CONVERSION OF THE ATTIC AREA INTO HABITABLE SPACE INCORPORATING ROOFLIGHTS TO THE FRONT AND REAR ELEVATIONS AND (2) RELOCATION OF SEPTIC TANK SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
DECOMMISSIONING OF EXISTING SEPTIC TANK SYSTEM AND INSTALLATION OF A REPLACEMENT SEPTIC TANK / SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
CONSTRUCTION OF A DWELLING HOUSE, DETACHED DOMESTIC GARAGE, SEPTIC TANK/SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
ERECTION OF NEW DWELLING HOUSE, DOMESTIC GARAGE, INSTALLATION OF A SEPTIC TANK/SEWAGE TREATMENT PLANT AND ALL ANCILLARY SITE WORKSDecision record indexed
DECOMMISSIONING OF EXISTING SEPTIC TANK SYSTEM AND INSTALLATION OF A REPLACEMENT SEPTIC TANK / SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
CONSTRUCTION OF (1) AN EXTENSION TO EXISTING DWELLING, WITH SINGLE STOREY EXTENSION TO THE SIDE ELEVATION INCORPORATING, KITCHEN & UTILITY ROOM/WC AND A SMALL BOX BAY WINDOW TO THE FRONT ELEVATION (2) A NEW DETACHED GARAGE/STORE AND ALL OTHER ASSOCIATED SITE WORKSDecision record indexed
DEMOLITION OF DWELLING AND ERECTION OF REPLACEMENT DWELLING WITH NEW WASTEWATER TREATMENT SYSTEM AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
CONSTRUCTION OF 5 NO. 'SHEPHERD HUT' TYPE STRUCTURES AND 1 'LOG CABIN'. CONSTRUCTION OF A SERVICES BUILDING TO ACCOMMODATE TOILETS, SHOWER AND KITCHEN.REMOVAL OF EXISTING SEPTIC TANK AND PERCOLATION AREA AND PROVISION OF NEW EFFLUENT TREATMENT UNIT AND PERCOLATION AREA AS WELL AS NEW ACCESS ONTO PUBLIC ROAD, CAR-PARKING FACILITIES, INTERNAL TRACKS, PASSING BAY ON PUBLIC ROAD AND ALL ASSOCIATED SITE WORKS AND RETENTION PERMISSION FOR CHANGE OF USE OF PRE EXISTING BARN FOR USE AS RESIDENTIAL ACCOMMODATION FOR TOURIST ACCOMMODATIONDecision record indexed
DOMESTIC SHED/STORE AND PERMISSION FOR (1) DEMOLITION OF EXISTING SHED/STORE (2) CONSTRUCTION OF AN EXTENSION TO THE SIDE OF EXISTING DWELLING HOUSE (3) ALTERATIONS TO THE FRONT ELEVATION OF THE DWELLING HOUSE AND ALL ASSOCIATED SITE WORKSDecision record indexed
CONSTRUCTION OF A SINGLE DOMESTIC BUNGALOW TYPE DWELLING HOUSE WITH ROOF SPACE ACCOMODATION, ON SITE FOUL SEWAGE TREATMENT SYSTEM & PERCOLATION AREA, ALL OTHER ASSOCIATED SITE WORKSDecision record indexed
(1) EXTENSION TO THE SIDE AND REAR OF DWELLING HOUSE (2) REVISED POSITION OF VEHICULAR ENTRANCE TO DWELLING HOUSE (3) EXISTING DOMESTIC SHEDSDecision record indexed
CONSTRUCTION OF A DWELLING HOUSE, DETACHED DOMESTIC GARAGE, SEPTIC TANK / SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
(1) DEMOLITION OF EXISTING DEFECTIVE CONCRETE BLOCK DWELLING HOUSE AND GARAGE AND (2) CONSTRUCTION OF NEW REPLACEMENT DWELLING, NEW GARAGE AND ALL ASSOCIATED SITE WORKSDecision record indexed
CONSTRUCTION OF A TWO STOREY BUILDING CONSISTING OF NEW CHANGING ROOMS, MEETING / TRAINING ROOM, SPECTATOR VIEWING AREA AND ALL ASSOCIATED SITE WORKSDecision record indexed
CONSTRUCTION OF A DWELLING HOUSE, DOMESTIC GARAGE, ON-SITE WASTE WATER TREATMENT PLANT AND PERCOLATION AREA AND ALL ASSOCIATED SITE WORKSDecision record indexed
CONSTRUCTION OF A DWELLING HOUSE, DOMESTIC GARAGE, SEPTIC TANK / SEWAGE TREATMENT SYSTEM AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
DEMOLITION OF EXISTING TWO STOREY DWELLING HOUSE AND CONSTRUCTION OF A SINGLE STOREY REPLACEMENT DWELLING HOUSE UNDER THE DCBGS (MICA SCHEME), PLUS ASSOCIATED SITE WORKSDecision record indexed
CONSTRUCTION OF AN EXTENSION TO PROVIDE SELF CONTAINED FAMILY ACCOMMODATION TO THE SIDE OF EXISTING DWELLING AND ALL ASSOCIATED SITE DEVELOPMENT WORKSGrounds not yet categorised
CONSTRUCTION OF A TWO-STOREY DWELLING HOUSE, CONNECTION TO A NEW ONSITE SEWAGE TREATMENT PLANT AND PERCOLATION AREA, A NEW ACCESS ROAD, AND ALL ASSOCIATED WORKS AND SITE WORKSDecision record indexed
(1) RETENTION AND COMPLETION OF AN EXTENSION TO THE REAR OF EXISTING DWELLING HOUSE, (2) REFURBISHMENT WORKS TO EXISTING DWELLING HOUSE AND (3) DECOMMISSIONING EXISTING SEPTIC TANK AND CONSTRUCTION OF A REPLACEMENT SEPTIC TANK SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
REPLACEMENT OF EXISTING 15 METRE HIGH TELECOMMUNICATIONS SUPPORT STRUCTURE WITH A PROPOSED LATTICE TOWER STRUCTURE (NEW HEIGHT 31.5 METRES) CARRYING THE TELECOMMUNICATIONS EQUIPMENT TRANSFERRED FROM THE EXISTING STRUCTURE AND THE ADDITION OF NEW TELECOMMUNICATIONS ANTENNAS, DISHES AND ASSOCIATED EQUIPMENT, TOGETHER WITH INSTALLATION OF GROUND EQUIPMENT CABINETS, NEW FENCING AND THE REMOVAL OF 1 NO. TREEDecision record indexed
DWELLING HOUSE, DETACHED DOMESTIC GARAGE AND VEHICULAR ENTRANCE AND PERMISSION FOR RETENTION AND COMPLETION OF SITE DEVELOPMENT WORKSDecision record indexed
CONSTRUCTION OF TWO-STOREY DWELLING AND DETACHED SINGLE STOREY DOMESTIC GARAGE, INSTALLATION OF A SEWAGE TREATMENT SYSTEM AND ALL ASSOCIATED SITE DEVELOPMENT WORKS ACCESSED VIA EXISTING ROADWAYDecision record indexed
CONSTRUCTION OF EXTENSION TO EXISTING DWELLING HOUSE TO THE SIDE AND REAR, INCLUDING MINOR INTERNAL CHANGES, WITH ALL ASSOCIATED SITE WORKSDecision record indexed
(1) EXTENSIONS TO THE SIDE AND REAR OF EXISTING DWELLING HOUSE AND (2) DETACHED STORAGE SHED AND ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed