Construction of a residential development of 463 dwellings comprising 353 apartments, 89 houses and 21 duplex apartments, creche (c.587.8sq.m) and community building (c.141sq.m) as follows: (A) 353 apartments in 7 apartment buildings (with balconies or terraces [including communal terraces] as follows: Block 1 (6 storeys with a part 7 storey level) of 57 apartments; Block 2(6 storeys with a part 7 storey level) of 47 apartments; Block 3 (6 storeys over undercroft/semi-basement with a part 7 storey level) of 56 apartments with car parking and ancillary plant/storage at basement level; Block 4 (6 storeys over undercroft/semi-basement with a part 7 storey level) of 56 apartments with car parking and ancillary plant/storage at basement level; Block 5 (6 storeys with a part 7 storey level) of 47 apartments; Block 6 (6 storeys over undercroft/semi-basement with a part 7 storey level) of 58 apartments with car parking and ancillary plant/storage at basement level; Block 7 is 6 storeys of 32 apartments (creche at ground and first floor) with outdoor play area. (B) 89 houses; House types 1A, 2A, 4, 4A- 3 storey to front [2 storey to rear] remainder of house types 2 storey. (C) 21 duplex apartments in 2 3-storey buildings. (D) Single storey community building including management office, 3 single storey ESB substations, single storey bicycle and bin stores. (E) 401 car parking spaces (including 3 car sharing spaces) to serve overall development and 364 bicycle spaces ([for apartments] with apartment bicycle storage provided internally at ground floor level for apartment blocks 1-7). (F) Provision of public open space areas within the development (including playground areas and communal open space areas); all ancillary landscape works, public lighting, planting and boundary treatments including regrading/re-profiling of site where required as well as provision of footpaths and cycle paths. (G) Vehicular access to the proposed development will be from the Citywest Road (N82) and will include pedestrian crossings and works to facilitate access (including vehicular and footpath/bridges over stream/ditch), secondary vehicular and pedestrian access to boundary to lands to north (currently under construction) and pedestrian to boundary to Magna Drive. (H) Provision of surface water and underground attenuation and all ancillary site development work. The application contains a statement setting out how the proposal will be consistent with the objectives of the relevant SDCC Development Plan.
Installation of energy storage units at an existing datacentre facility. The energy storage will consist of two new battery storage units, 2 new HV power skids (PCS transformer and HV RMU), two new MV transformers, concrete slab, security fence of 2.4 meters height including two new internal gate entrances.
The installation of an energy storage unit at an existing data centre facility. The development involves the placement of three ISO 40ft. shipping containers containing back up storage units at Keppel Data Centre, Citywest Avenue, Citywest Business Park, Dublin 24
Ground floor extension to side and rear to provide kitchen, wc, utility and living room with bay window to front elevation; first floor extension to side to provide single bedroom and en-suite double bedroom and associated site works.
Planning Permission for omission from a warehouse development site under construction of the superstructure associated with an ancillary sprinkler tank and pumphouse with substructure remaining as per granted planning application Reg. Ref. SD22A/0065 at Magna Avenue and Magna Drive, Citywest Business Campus, Co. Dublin.
Retention of alterations to, completion of structure to rear of existing house and all associated site works.
Single storey extension with non-habitable attic space to rear of existing dwelling.
Development at a site of 1.65ha comprising of the erection of secure anti-climb wire-mesh fencing around the perimeter of the existing building at a height of 2.1m, with associated landscaping works to screen the fencing. The provision of electronic vehicular access gates off the internal access road for access to rear service compound and car parking, vehicular barriers, and internal access footpaths, in addition to all associated site development works.
Erection of secure fencing and gates to the perimeter of the site, including all associated site development works, landscaping and planting.
Minor modifications to previously approved plans (Reg Ref SD21A/0238 + SD23A/0206) of existing (2390m²) light industrial facility at Unit 25 Magna Drive, Magna Business Park, Citywest, Co Dublin D24 PVY8. Modifications include- 1)Provision of additional Warehouse/Assembly and Office staff facilities totalling 523m² additional floor area based on- a)The provision of an additional warehouse/assembly floor area at 1st floor mezzanine level (441m²). b)In addition to the ground and 1st floor mezzanine office/staff facilities granted permission (Reg ref SD21A/0238) provision of) provision of office/staff facilities at ground and 1st floor mezzanine levels which will result in 82m² additional floor area. 2)Minor alterations to Elevations to include: a)New 1st floor mezzanine escape doorway and external stairs to side (East) elevation. b)New staff entrance side (East) elevation. c)New windows to front (North), East and West Elevations. d)New Ventilation louvred panels to front (North) and East Elevations. 3)In addition to the 38 no. car parking already granted (Reg ref SD21A/0238), 7 no. additional car parking spaces (45 no. spaces in total). 4)Relocation of previously approved Electricity substation and switch room (Reg Ref SD23A/0206) to the North of the site adjacent to the vehicular access. 5)Relocation of previously approved waste management and Plant enclosures. 6)New pedestrian gates and vehicular barriers. 7)Signage totem adjacent to the vehicular access. 8)all associated site landscaping and drainage works.
Change of use of the existing warehouse/distribution facility (2,390sq.m) to a light industrial use facility for the production, assembly and distribution of plastic assemblies for healthcare and biopharmaceutical industries; provision of additional floor area at first floor mezzanine level (290sq.m) resulting in a total floor area of 2,680sq.m comprising 910sq.m of ancillary floorspace, including ancillary office areas (263sq.m), staff changing facilities, staff canteen, toilets and plant rooms; external works to the existing building including the installation of a secure gated enclosure to the rear of the building containing air handling equipment, a new escape doorway in the side (east) elevation of the building, a new access footpath; 10 new car parking spaces (including 2 disabled spaces and 4 EV spaces with charging points) (resulting in a total of 38 spaces); new bin store; new bicycle parking provision; removal of existing sign; erection of new illuminated sign (3.6sq.m); all associated soft and hard landscaping works; solar panels; all piped infrastructure; plant and any other works above and below ground associated with the proposed development.
Construction of a detached single storey ESB substation with switch room & associated site landscaping & drainage works.
The development will consist of: The change of use of the existing warehouse to a clean manufacturing area - light industrial. Alterations to the existing south elevation, including the installation of new signage displaying the company name and the removal of the existing balcony. The provision of new double access doors and a new external pathway to facilitate access to the building; including all associated site and ancillary works.
We, Rockface Developments Limited, intend to apply for Planning Permission for proposed roof mounted Solar PV Panels to the warehouse building as part of an overall previously permitted warehousing development at Magna Avenue and Magna Drive, City West Business Campus, Co Dublin. (Existing granted planning Reg.: SD22A/0065 with associated warehousing development works currently under construction on site). The subject elements for which Planning Permission is sought are as follows: Provision of 2,572No Monocrystalline Solar PV Panels to the warehouse roof with a total area of 5,658sqm. Elevations, Site plan & drainage layout remain unaltered, and the building area remains the same as per previous planning application.
Provision of a warehouse unit with ancillary office and staff facilities and associated development. The building will have a maximum height of 15.5m with a gross floor area of 13,604sq.m including a warehouse area (12,568sq.m), staff facilities (489sq.m) and ancillary office area (538sq.m). The development will also include a vehicular and pedestrian entrance to the site from Magna Avenue, a separate HGV entrance from Magna Drive; 69 ancillary car parking spaces; covered bicycle parking; HGV parking and yards'; level access good doors; dock levellers; access gates; signage; hard and soft landscaping; lighting boundary treatments; ESB substation; sprinkler tank and pump house; an all associated site development works above and below ground.
Erection of a new external car wash structure (64sq.m) at the south east corner of the existing building, including for all associated site works, excavations, pumps, drainage, kerbing and landscaping.
Changes of use within parts only of the existing building from storage and production to: (a) use of an area as a marketing suite/showroom (380sq.m ground floor together with an 80sq.m first floor mezzanine extension); (b) automotive academy and training area (925sq.m); (c) construction of additional ancillary office/welfare accommodation (467sq.m) at ground and first floor; (d) two storey briese soleil/sun shade structure to the south elevation; (e) additional windows and glazed screens on all elevations; (f) new single storey hand wash valet structure (146sq.m) on south elevation; (g) new wall mounted signage to west and south elevation; (h) 14 new car parking spaces (previously approved) and 25 new electric car charging points; (i) revisions to existing hard and soft landscaping to accommodate the development; (j) new ramped and stepped access with external terrace to form new entrance area with canopy at existing exit on west elevation; (k) existing 8 metre high water sprinkler tank to be replaced with 11 metre high water sprinkler tank. It is intended that the majority of the premises (6926sq.m) will continue in use for storage and distribution with ancillary office use continuing also.
Erection of linear arrays of solar photovoltaic panels on the roof of Unit 2007 together with 4 invertors 1.075m wide x 0.33m deep x 0.55m high together with all ancillary works. There will be 350 panels in all, each 1.34m x 2.28m in size, located on 3 of the 4 south facing sides of the roof area, all concealed from view behind the parapet walling. No panels are proposed on the 4 north facing elevations. The panels will provide sustainable energy to the premises with the surplus being fed into the grid. An additional means of escape is also proposed.
Two bedroom, single storey bungalow to side.
Family flat to side.
The development will consist of the installation of approximately 658.63 sq.m of Photo-Voltaic Solar Panels onto the existing roof. The solar panels will be used to create green electricity, all of which will be used by building.
Extension of an existing warehouse by approximately 1,685sg.m and the addition of 1 loading dock, extension of existing loading yard and upgrade of 11 parking spaces for E.V charging, 2 spaces to accessible parking spaces, and the addition of 35 covered bicycle parking spaces all on a site of approximately 1.6 hectares in the townland of Fortunestown.
New main entrance door and canopy, installation of external signage and removal of existing draught lobby to south-west facade, installation of 5no. glazed doors and 4no. louvred panels to existing glazed facades, provision of 198sqm of photovoltaic panels below parapet level of flat roof, 2no. free-standing signage totems, 8no. new Electric Vehicle charging points, 2no. bicycle parking shelters and miscellaneous landscaping works.
Installation of two internally illuminated external building mounted signs to the existing south-west and north-west facades.
Change of use of an existing single storey detached store (floor space - 154sq.m) to a research and development gas innovation workshop and store.
The development will consist of alterations to the existing east elevation to include the provision of a new external fire escape stairs to facilitate the internal subdivision of the existing office building, together with all associated site and ancillary works.
The installation of an external Air Handling Unit, to be housed in a new timber and metal clad enclosure adjacent to Unit 3030, Lake Drive and the installation of a Heat Pump Unit to be installed within an existing plant enclosure, with additional cladding proposed, in the north east corner of the carpark of Unit 3030 and all ancillary engineering and landscape works necessary to facilitate the development at Unit 3030 Lake Drive, Browns barn, Dublin 24 D24 KX6Y. (Previous planning reference SD25A/0185W )
Construction of a 68sq.m single storey extension to the side and rear of two storey, semi-detached dwelling and all associated ancillary site development works.
1 x 50 KWp solar photovoltaic (PV) system on main office building. There will be a total of 156 PV panels on the main office roof and will occupy an area of 257sq.m.
Retention/change of use for existing development and shed/outbuilding; the development was originally built for residential purposes but is currently being used as a childcare facility.
Provision of a 3 storey office development with a total gross floor area of c. 2,992sq.m (excluding the c. 205sq.m plant room at roof level); Provision of 51 car parking spaces (including 2 accessible spaces and 27 EV spaces with charging points), accessed via the existing vehicular entrance from Lake Drive; Provision of 2 pedestrian access points to the north and east of the site, bicycle parking facilities, an ESB substation (c. 22sq.m), waste storage facilities (c. 20sq.m); signage, soft and hard landscaping works, PV panels, external lighting, piped infrastructure and ducting, SuDS drainage and all ancillary site excavation and development works above and below ground.
For Blanket installation of photovoltaic panels (PV) over existing warehouse roof footprint circa 11,400m2 and all associated works. PV panels will not extend above parapet line. Permission is being sought as building is located between Baldonnell and Tallaght University Hospital Solar Safeguarding Zones
The development will consist of erection of back-lit signage to the west elevation of Unit 3018.
Alterations to existing east and west elevations to include 10 external vents; installation of new photovoltaic solar panels to existing roof; provision of 10 bicycle parking spaces; 2 EV chargers; 1 external condenser and all associated site works.
The development will consist of retention permission for the as constructed rear detached structure and permission for construction of a single storey rear extension to link the existing rear structure to the main dwelling, and to retain existing structure as a self-contained family flat with proposed internal alterations to existing layout and all associated site works.
Retention permission for the as contracted rear detached structure with the existing structure reduced in overall length and permission for construction of a single storey rear extension to link the existing structure to the main dwelling and to retain the existing structure as a self - contained family flat with proposed internal alterations to existing layout and all associated site works.
Change of use of 3,397sqm of the existing interlinked complex of buildings of 18,984sqm from a mix of ancillary warehouse, packaging, logistics and research and development uses within part of the ground floor of Block E (2,952sqm) and part of the ground floor of Block G (445sqm) to office based industry that incorporates research and development, ancillary office, gym and other facilities related to the operation of the overall development. The development will include internal works only to facilitate the change of use.
Retention of the generator compound (391sq.m) consisting of three generators along with three transformers and ancillary 3 diesel tanks and perimeter treatment on a permanent basis on the southern perimeter of the site with Orchard Avenue; The development also consists of the retention of 3 signs (10.94sq.m) as follows: retention of 1 sign (0.57sq.m) on plinth at the corner of Bianconi Avenue and the N82/Citywest Road; retention of 1 sign (4.58sq.m) on the eastern elevation of Block D facing the N82/Citywest Road and retention of 1 sign (5.79sq.m) on the northern elevation of Block M facing Bianconi Avenue. The development will include retention of all revisions to the permitted landscaping and site development works required.
Change of use of 6,299sq.m of the existing interlinked complex of buildings of 18,984sq.m from a mix of ancillary warehouse, packaging, logistics and research and development uses within Blocks E, G and K to an independent office based industry use that would function independently to the remaining Xilinx facility and could be sub-let and subdivided. An area of existing office space of 1,591sq.m at the second floor within Block G will also be sub-let creating an overall independent office based industry use of 7,890sq.m. The development will include the removal of the mezzanine level above the ground floor of Block G (201sq.m) that will reduce total floor area of facility to 18,783sq.m. The development will also consist of the amendment of Condition no. 6 of S94A/0344 and S99A/0908 so that the new independent office based industry use of 7,890sq.m can be sub-let and subdivided and so that the existing office space (10,893sq.m) is not integral or ancillary to the non office uses that are subject of this change of use application. Minor elevation changed are also proposed, including a new entrance within the north elevation of Block E, and additional glazing to the north, west and south elevation of Block G. The remaining Xilinx facility (10,893sq.m) will continue as per its permitted uses. The new office based industry use will be served by the reconfigured 197 car parking spaces of the 568 permitted car parking spaces serving the site with vehicular access via the existing secondary entrance off Bianconi Avenue. 371 spaces will continue to serve the remaining Xilinx facility. Retention permission is also sought for the generator compound (391sq.m) consisting of three generators along with three transformers and ancillary 3 diesel tanks and perimeter treatment on a permanent basis on the southern perimter of the site with Orchard Avenue. The development will include all ancillary landscaping and site development works.
Detached two storey, four bedroom dwelling in side garden with attic conversion with dormer roof to rear; new vehicular entrance & partial dishing of kerb.
Conversion of attic space to non-habitable space with dormer to side of existing dwelling and all associated site works.
Side/rear two storey extension and rear single storey extension to dwelling; attic roof space conversion with roof dormer to rear part of roof with associated internal alterations; forming pedestrian access gateway to side boundary wall with associated boundary treatment alterations and all associated site development works.
Side/rear two storey extension and rear single storey extension to dwelling house; attic roof space conversion with roof dormer to rear part of roof with associated internal alterations; forming vehicular access driveway off Carrigmore Meadows to side/rear garden with associated boundary treatment alterations site development works.
Construction of two 4 storey office buildings, with a total floor area of 13,250sq.m. The proposed development also provides for plant rooms at roof level (125sq.m each), all associated site development works, landscaping, basement and surface car parking, bike sheds, 2 service buildings (70sq.m each), and 2 new vehicular entrances off Bianconi Avenue, all on a site area of 2.2ha.
Construction of a three storey creche and community centre facility of 1,610sq.m gross floor area with associated external play area; car & cycle parking, hard and soft landscaping, bin storage, a revised layout to the northern edge of Cuil Duin Avenue to accommodate access to the proposed development including amendments to the existing footpath and cycle track and provision of set down car parking spaces and all associated site and development works.
Provision of a warehouse with ancillary office and staff facilities and associated development. The main structure will have a maximum height of approximately 19.1 metres with a gross floor area of 9,158 sq.m, including warehouse area (7,971 sq.m), ancillary office area (701 sq.m) and ancillary staff facilities (486 sq.m). The development will also include: 2 No. vehicular entrances to the site from Bianconi Avenue, including 1 No. for HGVs; a pedestrian entrance from the Citywest Road and Bianconi Avenue; HGV parking and yard; 45 No. car parking spaces, including 3 No. accessible parking spaces; cycle parking; level access goods doors; dock levellers; access gates; lighting; hard and soft landscaping; detention basin; boundary treatments; ESB substation, switch room and site lighting and security room; plant; and all associated site development works above and below ground.
The proposed development will consist of modifications to the elevational design and floor plan layout of the previously permitted 3 storey creche/ community centre building (approved under Reg. Ref. SD22A/0398) resulting in a reduction in overall floorspace from 1610sqm to 1596.8sqm. Revisions are proposed to the approved site layout plan including: removal of the pedestrian bridge and relocation of the external play space area from the open space located to the west of the stream to an outdoor deck play space adjacent (west) of the main building and an enclosed play space at ground floor level on the southern elevation. Permission is also sought for modifications to adjoining cycle track and set down car parking spaces; revised hard and soft landscaping, bin storage and cycle parking and all associated site and development works
Proposed Side/Rear Single Storey Extension & Side/Rear Two Storey Extension with Associated Internal & External Alterations, Insert Ground Level Window Opening to North/East Side Facade, Relocate Side Landing Level Window Opening Along Side South/West Facade, Remove Chimney Stack, External Insulation System to all Facades with Associated Site Development Works to Detached Dwelling House
Two storey extension to front, side and rear of existing house with a new lounge and bedroom; single storey extension to front of house for a new porch and all associated site works.
Amendments to the development permitted under Reg. Ref. SD18A/0301 comprising of alterations to the permitted two storey data centre building including internal reconfiguration, alterations to finished floor levels, alterations to the building footprint to provide for the relocation of an internal staircore to the south of the building, and the replacement of the enclosed first floor level with an open screened roof mounted plant space (resulting in a reduction of 4,091sq.m in the gross floor area (GFA) of the data centre building); Associated alterations to the facade of the data centre building, including alterations to fenestration, cladding, step-out in the southern facade to accommodate a staircore, and a reduction in the eastern building parapet height of c. 2 metres; Provision of a canopy over the loading docks on the east facade; Alterations to the permitted generator compound, generators, and flues, including a reduction in the number of generators (5 now proposed), and provision of MV rooms within the generator compound; Provision of an ESB substation compound in the north-eastern portion of the site, comprising a single storey substation building (with a GFA of c. 125sq.m), within a 2.6 metre high security fence, 2 transformers, client control building (with a GFA of c. 47sq.m), and associated access arrangements; The ESB substation compound will be accessed from Kingswood Drive; Omission of the permitted sprinkler tank, pump room and 10kV Substation, reconfiguration of the permitted car parking, and revisions to permitted boundary treatments; Associated alterations to landscaping, access and internal road arrangements, services, lighting, and layout, and all associated and ancillary works.