We, Rockface Developments Limited, intend to apply for Planning Permission for proposed roof mounted Solar PV Panels to the warehouse building as part of an overall previously permitted warehousing development at Magna Avenue and Magna Drive, City West Business Campus, Co Dublin. (Existing granted planning Reg.: SD22A/0065 with associated warehousing development works currently under construction on site). The subject elements for which Planning Permission is sought are as follows: Provision of 2,572No Monocrystalline Solar PV Panels to the warehouse roof with a total area of 5,658sqm. Elevations, Site plan & drainage layout remain unaltered, and the building area remains the same as per previous planning application.
Provision of a warehouse unit with ancillary office and staff facilities and associated development. The building will have a maximum height of 15.5m with a gross floor area of 13,604sq.m including a warehouse area (12,568sq.m), staff facilities (489sq.m) and ancillary office area (538sq.m). The development will also include a vehicular and pedestrian entrance to the site from Magna Avenue, a separate HGV entrance from Magna Drive; 69 ancillary car parking spaces; covered bicycle parking; HGV parking and yards'; level access good doors; dock levellers; access gates; signage; hard and soft landscaping; lighting boundary treatments; ESB substation; sprinkler tank and pump house; an all associated site development works above and below ground.
Erection of a new external car wash structure (64sq.m) at the south east corner of the existing building, including for all associated site works, excavations, pumps, drainage, kerbing and landscaping.
Changes of use within parts only of the existing building from storage and production to: (a) use of an area as a marketing suite/showroom (380sq.m ground floor together with an 80sq.m first floor mezzanine extension); (b) automotive academy and training area (925sq.m); (c) construction of additional ancillary office/welfare accommodation (467sq.m) at ground and first floor; (d) two storey briese soleil/sun shade structure to the south elevation; (e) additional windows and glazed screens on all elevations; (f) new single storey hand wash valet structure (146sq.m) on south elevation; (g) new wall mounted signage to west and south elevation; (h) 14 new car parking spaces (previously approved) and 25 new electric car charging points; (i) revisions to existing hard and soft landscaping to accommodate the development; (j) new ramped and stepped access with external terrace to form new entrance area with canopy at existing exit on west elevation; (k) existing 8 metre high water sprinkler tank to be replaced with 11 metre high water sprinkler tank. It is intended that the majority of the premises (6926sq.m) will continue in use for storage and distribution with ancillary office use continuing also.
Demolition of the single storey conservatory to the side of existing house; new vehicular access is proposed fronting and serving the existing dwelling house; the construction of a new two storey, detached 3 bed house to the side of existing house and all associated site development works. Proposals also provide for revised boundary treatments to sub-divide the site, including hard landscaping, connections to services and new vehicular & pedestrian access.
Retention Permission for ground floor front and rear extensions with pitched roof.
Erection of linear arrays of solar photovoltaic panels on the roof of Unit 2007 together with 4 invertors 1.075m wide x 0.33m deep x 0.55m high together with all ancillary works. There will be 350 panels in all, each 1.34m x 2.28m in size, located on 3 of the 4 south facing sides of the roof area, all concealed from view behind the parapet walling. No panels are proposed on the 4 north facing elevations. The panels will provide sustainable energy to the premises with the surplus being fed into the grid. An additional means of escape is also proposed.
Double storey extension comprising a playroom, utility room and office room to the ground floor, extended bedroom, walk-in wardrobe and bathroom to the first floor to an existing detached house; alterations to the existing house front elevation including new window to the first floor bedroom; all to be constructed behind existing boundary walls.
Single storey family flat side extension and all associated site works.
Minor modifications to previously approved plans (Reg Ref SD21A/0238 + SD23A/0206) of existing (2390m²) light industrial facility at Unit 25 Magna Drive, Magna Business Park, Citywest, Co Dublin D24 PVY8. Modifications include- 1)Provision of additional Warehouse/Assembly and Office staff facilities totalling 523m² additional floor area based on- a)The provision of an additional warehouse/assembly floor area at 1st floor mezzanine level (441m²). b)In addition to the ground and 1st floor mezzanine office/staff facilities granted permission (Reg ref SD21A/0238) provision of) provision of office/staff facilities at ground and 1st floor mezzanine levels which will result in 82m² additional floor area. 2)Minor alterations to Elevations to include: a)New 1st floor mezzanine escape doorway and external stairs to side (East) elevation. b)New staff entrance side (East) elevation. c)New windows to front (North), East and West Elevations. d)New Ventilation louvred panels to front (North) and East Elevations. 3)In addition to the 38 no. car parking already granted (Reg ref SD21A/0238), 7 no. additional car parking spaces (45 no. spaces in total). 4)Relocation of previously approved Electricity substation and switch room (Reg Ref SD23A/0206) to the North of the site adjacent to the vehicular access. 5)Relocation of previously approved waste management and Plant enclosures. 6)New pedestrian gates and vehicular barriers. 7)Signage totem adjacent to the vehicular access. 8)all associated site landscaping and drainage works.
Change of use of the existing warehouse/distribution facility (2,390sq.m) to a light industrial use facility for the production, assembly and distribution of plastic assemblies for healthcare and biopharmaceutical industries; provision of additional floor area at first floor mezzanine level (290sq.m) resulting in a total floor area of 2,680sq.m comprising 910sq.m of ancillary floorspace, including ancillary office areas (263sq.m), staff changing facilities, staff canteen, toilets and plant rooms; external works to the existing building including the installation of a secure gated enclosure to the rear of the building containing air handling equipment, a new escape doorway in the side (east) elevation of the building, a new access footpath; 10 new car parking spaces (including 2 disabled spaces and 4 EV spaces with charging points) (resulting in a total of 38 spaces); new bin store; new bicycle parking provision; removal of existing sign; erection of new illuminated sign (3.6sq.m); all associated soft and hard landscaping works; solar panels; all piped infrastructure; plant and any other works above and below ground associated with the proposed development.
Construction of a detached single storey ESB substation with switch room & associated site landscaping & drainage works.
Two storey side extension; 3 front facing 'Velux' windows and a rear facing dormer window.
Permission to install a standby industrial diesel generator and solar panels. The generator will include a bunded fuel tank and be located within a mesh enclosure. The proposed solar panels will be attached to a steel frame to be erected adjacent to the generator ( Covering an area of approximately 32 sq.m, to a maximum height of 4.8 meters above ground level ). Works to include all ancillary development works, all located within an existing fenced compound.
Change of use from education to office use within the existing building. No increase in area, external alterations or extensions are proposed.
Construction of a three storey creche and community centre facility of 1,610sq.m gross floor area with associated external play area; car & cycle parking, hard and soft landscaping, bin storage, a revised layout to the northern edge of Cuil Duin Avenue to accommodate access to the proposed development including amendments to the existing footpath and cycle track and provision of set down car parking spaces and all associated site and development works.
Conversion of the existing garage to habitable space including replacement of garage door with a new window, and for a single storey extension to the rear of the existing house and garage and associated site works
The proposed development will consist of modifications to the elevational design and floor plan layout of the previously permitted 3 storey creche/ community centre building (approved under Reg. Ref. SD22A/0398) resulting in a reduction in overall floorspace from 1610sqm to 1596.8sqm. Revisions are proposed to the approved site layout plan including: removal of the pedestrian bridge and relocation of the external play space area from the open space located to the west of the stream to an outdoor deck play space adjacent (west) of the main building and an enclosed play space at ground floor level on the southern elevation. Permission is also sought for modifications to adjoining cycle track and set down car parking spaces; revised hard and soft landscaping, bin storage and cycle parking and all associated site and development works
Change of use from existing restaurant use at ground floor to proposed office use (235sq.m).
Construction of single storey detached garden room comprising of home office and gym.
Single storey side extension with a flat roof for extended living.
The development will consist of the installation of approximately 658.63 sq.m of Photo-Voltaic Solar Panels onto the existing roof. The solar panels will be used to create green electricity, all of which will be used by building.
Extension of an existing warehouse by approximately 1,685sg.m and the addition of 1 loading dock, extension of existing loading yard and upgrade of 11 parking spaces for E.V charging, 2 spaces to accessible parking spaces, and the addition of 35 covered bicycle parking spaces all on a site of approximately 1.6 hectares in the townland of Fortunestown.
Erection of a three storey with front dormer, three bedroom detached dwelling in the side garden of existing dwelling with one pedestrian entrance and one vehicular entrance; creation of a new boundary wall between existing house and new dwelling to be known as No. 2A.
The development will consist of retention of as built 2no. two bed, two storey duplex units with associated private and communal amenity spaces, bin and bike store and all associated amendments to hard and soft landscaping and car parking on the adjoining street at Parklands Parade all in lieu of previously permitted creche and community facility at this location.
Retention of 2no. two bed, two storey duplex units with associated private and communal amenity spaces, bin and bike store and all associated amendments to hard and soft landscaping and car parking on the adjoining street at Parklands Parade all in lieu of previously permitted creche and community facility at this location.
The development will consist of: The change of use of the existing warehouse to a clean manufacturing area - light industrial. Alterations to the existing south elevation, including the installation of new signage displaying the company name and the removal of the existing balcony. The provision of new double access doors and a new external pathway to facilitate access to the building; including all associated site and ancillary works.
Conversion of attic space to non-habitable space with dormer to side of existing dwelling and all associated site works.
Attic conversion for storage incorporating a dormer window to the front, a dormer window to the rear, and a new gable window to the side.
Attic conversion and dormer roof window on rear slope of roof at attic level.
Residential development consisting of 99 dwellings comprised of 84 two storey houses, 15 apartments and duplex units accommodated in 2 three storey blocks; the proposed houses are comprised of 9 two bed houses, 71 three bed houses, 4 four bed houses; the proposed apartments & duplex units are comprised of 6 one bed units, 3 two bed units and 6 three bed units, also providing for all associated site development and infrastructural works, car and bicycle parking, ESB sub-station, open spaces and landscaping, bin and bicycle storage; access to the development via a new vehicular entrance on the western boundary of the site, off the existing access road to the Luas park & ride facility on a site area of 3.14ha bounded to the north by Citywest Avenue, located east of a permitted residential development known as Citywest Village and existing ESB sub-station and is north of the Luas red line.
Single storey and 2 storey extension to front of existing dwelling.
Extensions and alterations to existing two storey detached house to include (a) single storey detached domestic garage (garage 1) to front of existing house; (b) single storey (garage 2) and family flat extension to front of existing house to include change of use of existing garage/store to family flat use; (c) single storey porch to front of existing use; (d) 2 single storey domestic use extensions to rear of existing house and all associated alterations; (e) modifications to window openings to rear and side of existing house; (f) landscaping and all associated site development works; Retention of single storey domestic extension to side of existing house.
Conversion of Attic Space comprising of modification of existing roof structure, new gable window new access stairs, 2no roof windows to the front and flat roof dormer to the rear.
Retention of alterations to, completion of structure to rear of existing house and all associated site works.
Single storey extension with non-habitable attic space to rear of existing dwelling.
Change of use of 3,397sqm of the existing interlinked complex of buildings of 18,984sqm from a mix of ancillary warehouse, packaging, logistics and research and development uses within part of the ground floor of Block E (2,952sqm) and part of the ground floor of Block G (445sqm) to office based industry that incorporates research and development, ancillary office, gym and other facilities related to the operation of the overall development. The development will include internal works only to facilitate the change of use.
Retention of the generator compound (391sq.m) consisting of three generators along with three transformers and ancillary 3 diesel tanks and perimeter treatment on a permanent basis on the southern perimeter of the site with Orchard Avenue; The development also consists of the retention of 3 signs (10.94sq.m) as follows: retention of 1 sign (0.57sq.m) on plinth at the corner of Bianconi Avenue and the N82/Citywest Road; retention of 1 sign (4.58sq.m) on the eastern elevation of Block D facing the N82/Citywest Road and retention of 1 sign (5.79sq.m) on the northern elevation of Block M facing Bianconi Avenue. The development will include retention of all revisions to the permitted landscaping and site development works required.
Change of use of 6,299sq.m of the existing interlinked complex of buildings of 18,984sq.m from a mix of ancillary warehouse, packaging, logistics and research and development uses within Blocks E, G and K to an independent office based industry use that would function independently to the remaining Xilinx facility and could be sub-let and subdivided. An area of existing office space of 1,591sq.m at the second floor within Block G will also be sub-let creating an overall independent office based industry use of 7,890sq.m. The development will include the removal of the mezzanine level above the ground floor of Block G (201sq.m) that will reduce total floor area of facility to 18,783sq.m. The development will also consist of the amendment of Condition no. 6 of S94A/0344 and S99A/0908 so that the new independent office based industry use of 7,890sq.m can be sub-let and subdivided and so that the existing office space (10,893sq.m) is not integral or ancillary to the non office uses that are subject of this change of use application. Minor elevation changed are also proposed, including a new entrance within the north elevation of Block E, and additional glazing to the north, west and south elevation of Block G. The remaining Xilinx facility (10,893sq.m) will continue as per its permitted uses. The new office based industry use will be served by the reconfigured 197 car parking spaces of the 568 permitted car parking spaces serving the site with vehicular access via the existing secondary entrance off Bianconi Avenue. 371 spaces will continue to serve the remaining Xilinx facility. Retention permission is also sought for the generator compound (391sq.m) consisting of three generators along with three transformers and ancillary 3 diesel tanks and perimeter treatment on a permanent basis on the southern perimter of the site with Orchard Avenue. The development will include all ancillary landscaping and site development works.
Kelland Homes Ltd. and Evara Developments Ltd. wish to apply for permission for a Large-scale Residential Development (LRD) on a site located at Boherboy, Saggart, County Dublin. To the immediate north of the site is the Carrigmore residential estate, to the west are agricultural lands and a single dwelling, to the east is the Corbally residential estate and Carrigmore Park, while to the south is the Boherboy Road. The proposed development consists of 611 no. dwellings, comprised of 306 no. 2, 3, 4 & 4-5 bed, 2 & 3 storey, detached, semi-detached & terraced houses, 133 no. 1, 2 & 3 bed duplex units in 12 no. 2-3 storey blocks, and 172 no. 1, 2 & 3 bed apartments in 5 no. buildings ranging in height from 4-5 & 5 storeys. The proposed development also includes a 2-storey crèche (c.630m²). Access to the development will by via one no. new vehicular access point from the Boherboy Road, along with new vehicular connections to adjoining developments at Corbally Heath to the east and Carrigmore Green to the north. Ten no. houses in the south-eastern part of the site will be accessed from Corbally Glade to the east. The proposed development includes for pedestrian and cyclist connections throughout the proposed development and accesses into adjoining lands at Carrigmore Park, Corbally Heath and Corbally Glade to the east and Carrigmore Green to the north. Private amenity space for the residential units is provided in the form of rear gardens for houses and ground floor terraces / upper floor balconies for apartments and duplex units. The proposed development provides for a total of c.2.3Ha of public open space, and c.4,750sq.m of communal open space associated with proposed development. The proposed development also provides for (i) all associated site development works above and below ground, including surface water attenuation & an underground foul sewerage pumping station at the northern end of the site, (ii) public open spaces (c.2.3Ha), (iii) communal open spaces (c.4,750sq.m), (iv) hard & soft landscaping and boundary treatments, (v) surface car parking (861 no. car parking spaces), (vi) bicycle parking (711 no. bicycle parking spaces), (vii) bin & bicycle storage, (viii) diversion of all existing overhead ESB lines underground, (ix) public lighting, and (x), plant / PV panels (M&E), utility services & 8 no. ESB sub-stations, all on an overall application site area of c.18.7Hha. In accordance with the South Dublin County Development Plan (2022-2028), an area of c.1.03Ha within the site is reserved as a future school site.
Development to the immediate north of the site is the Carrigmore residential estate, to the west are agricultural lands and a single dwelling, to the east is the Corbally residential estate while to the south is the Boherboy Road; The proposed application represents the development of the entire Boherboy Neighbourhood as identified in the Fortunestown Local Area Plan (2012) consisting of 655 dwellings, comprised of 257 two, three & four bed, two & three storey detached, semi-detached & terraced houses, 152 one, two & three bed duplex units in 17 two to three, three to four & four storey blocks, and 246 one, two & three bed apartments in 9 buildings ranging in height from two, two to five, four to five & five storeys, and a two storey crèche (693sq.m); Access to the development will by via one vehicular access point from the Boherboy Road, along with proposed upgrade works to Boherboy Road to include the provision of a roadside footpath along the front of the site at the Boherboy Road, continuing eastwards to the junction with the N81 Blessington Road (for an overall distance of c.370m); The proposed development also provides for pedestrian and cyclist connectivity to the adjoining Carrigmore Park to the north-east, and vehicular, pedestrian and cyclist connections to adjoining developments at Corbally Heath to the east and Carrigmore Green to the north; The proposed development provides for (i) all associated site development works above and below ground, including surface water attenuation & an underground foul sewerage pumping station at the northern end of the site, (ii) public open spaces (c. 3Ha), including alongside the Corbally Stream, which will accommodate the provision of pedestrian / cyclist links to Carrigmore Park to the north-east, (iii) communal open spaces (c. 6,392sq.m), (iv) hard and soft landscaping and boundary treatments, (v) undercroft, basement & surface car parking (914 car parking spaces, including EV parking), (vi) bicycle parking (797 bicycle parking spaces), (vii) bin & bicycle storage, (viii) public lighting, and (ix), plant (M&E), utility services & 5 ESB sub-stations, all on an overall application site area of 18.3ha; In accordance with the Fortunestown Local Area Plan (2012) an area of c. 1.4Ha within the site is reserved as a future school site.
Installation of two internally illuminated external building mounted signs to the existing south-west and north-west facades.
Construction of single storey extension to side of existing dwelling comprising 2no. bedrooms, office, playroom, living room, bathroom, and associated site works.
New educational campus of 2 new school buildings to be delivered on a phased basis including the demolition/removal of the existing 4 four storey educational/former short stay residential blocks (golf apartments) on the site; provision of 1 part three storey, 1000 pupil post primary school including 4 classroom special educational needs unit with a gross floor area of 11,331sq.m including a sports hall and all ancillary teacher and pupil facilities; 1 two storey 16 classroom primary school and 2 classroom special educational needs unit; a general purpose hall and all ancillary teacher and pupils facilities with a gross floor area of 2,820sq.m; vehicular access to the site will be from the existing Fortunestown Lane entrance, which is to be widened; fire tender and delivery access will be from the existing entrance to the northwest of the site, via Fortunestown Lane; cycle and pedestrian access to the site will be from a new entrance on Fortunestown Lane; provision of bicycle and scooter parking; new pedestrian crossing at Saggart Lakes Road, vehicle drop off/set down areas; internal access roads; hard and soft play areas; piped infrastructure and ducting; plant, landscaping and boundary treatments; PV panels; external courtyards; disabled car parking spaces; ESB substation and 1 substation access door to the site boundary wall on Fortunestown Lane; ancillary ramps and stairs; signage; 1 attenuation tank; flood mitigation measures; SUD's; changes in level and all associated site development and excavation works above and below ground.
New educational campus of 2 new school buildings to be delivered on a phased basis including the demolition/removal of the existing 4 four storey educational/former short stay residential blocks (golf apartments) on the site; provision of 1 part three storey, 1000 pupil post primary school including 4 classroom special educational needs unit with a gross floor area of 11,331sq.m including a sports hall and all ancillary teacher and pupil facilities; 1 two storey 16 classroom primary school and 2 classroom special educational needs unit; a general purpose hall and all ancillary teacher and pupils facilities with a gross floor area of 2,820sq.m; vehicular access to the site will be from the existing Fortunestown Lane entrance, which is to be widened; fire tender and delivery access will be from the existing entrance to the northwest of the site, via Fortunestown Lane; cycle and pedestrian access to the site will be from a new entrance on Fortunestown Lane; provision of bicycle and scooter parking; new pedestrian crossing at Saggart Lakes Road, vehicle drop off/set down areas; internal access roads; hard and soft play areas; piped infrastructure and ducting; plant, landscaping and boundary treatments; PV panels; external courtyards; disabled car parking spaces; ESB substation and 1 substation access door to the site boundary wall on Fortunestown Lane; ancillary ramps and stairs; signage; 1 attenuation tank; flood mitigation measures; SUD's; changes in level and all associated site development and excavation works above and below ground.
New main entrance door and canopy, installation of external signage and removal of existing draught lobby to south-west facade, installation of 5no. glazed doors and 4no. louvred panels to existing glazed facades, provision of 198sqm of photovoltaic panels below parapet level of flat roof, 2no. free-standing signage totems, 8no. new Electric Vehicle charging points, 2no. bicycle parking shelters and miscellaneous landscaping works.
Permission for change of use of part of ground floor and entire of first floor of domestic garage for habitable use with internal and minor external elevation modifications and complete all ancillary site works in relation to above with all to be classed as one residential unit part of existing dwelling.
Ground floor extension to side and rear to provide kitchen, wc, utility and living room with bay window to front elevation; first floor extension to side to provide single bedroom and en-suite double bedroom and associated site works.
Two bedroom, single storey bungalow to side.
Family flat to side.