(1) DEMOLITION OF EXISTING PORCH (2) CONSTRUCTION OF AN EXTENSION TO EXISTING DWELLING HOUSE TO PROVIDE ANCILLARY ACCOMMODATION (3) REPLACEMENT OF EXISTING SEPTIC TANK WITH WASTEWATER TREATMENT SYSTEM INCLUDING ALL ASSOCIATED SITE WORKSDecision record indexed
(A) ERECTION OF A DORMER EXTENSION TO SIDE OF EXISTING DWELLING CONSISTING OF GARAGE, WET ROOM AND UTILITY AT GROUND FLOOR LEVEL WITH AN ADDITIONAL BEDROOM, BATHROOM & STORE AT FIRST FLOOR LEVEL (2) ALTERATIONS TO FRONT ELEVATION OF EXISTING DWELLING (3) CONNECTION TO EXISTING STORM AND FOUL DRAINAGE (4) ALL ASSOCIATED WORKS AND SITE WORKSDecision record indexed
PROVISION OF 2 NO. SHEPHERDS HUTS WITH CONNECTION TO PUBLIC SEWER AND OTHER ANCILLARY WORKS TO THE REAR OF GOOSE & GANDER PIZZARIADecision record indexed
CNOC NA MUIRLEOIGE AGUS AN LEARGAIN RIACH, NA DÚNAIBH, LEITIR CEANAINN
TEACH CÓNAITHE A THÓGÁIL A BHFUIL CEANGAL AIGE LE SÉARACHAS POIBLÍ AGUS GARÁISTE CEANGAILTE (CEAD IMLÍNEACH A BHEITH DEONAITHE AG UIMHIR 24/61241)Decision record indexed
(1) REMOVAL OF FRONT PROJECTING ENTRANCE AND BAY WINDOW, (2) EXTENSION TO THE FRONT AND SIDE OF EXISTING DWELLING, (3) ALL ASSOCIATED WORKS AND SITE WORKSDecision record indexed
REMOVAL OF EXISTING BAY WINDOW AND CONSTRUCTION OF NEW BAY WINDOW WITH FLAT ROOF COVERED CANOPY ACROSS FRONT FAÇADE, INCLUDING ALL SITE DEVELOPMENT WORKSDecision record indexed
(1) DEMOLITION OF THE EXISTING FRONT EXTENSION (2) CONSTRUCTION OF A SINGLE STOREY FRONT EXTENSION AND SINGLE STOREY REAR EXTENSION TO THE REAR OF THE DWELLINGDecision record indexed
ERECTION OF A NEW DWELLING HOUSE AND WASTEWATER TREATMENT SYSTEM WITH ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS INCLUDING THE ALTERATION OF AN ENTRANCE PREVIOUSLY GRANTED UNDER APPLICATION 25/60944Decision record indexed
(1) FICHE LÁTHAIR DÓ VEAIN CHAMPÁLA TURASÓIREACHTA (2) FOIRGNEAMH Á THÓGÁIL LE ÁISEANNA CITHFHOLCHTA, LEITHREAIS AGUS NÍOCHÁN (3) CEANGAIL A DHÉANAMH LEIS AN SÉARACH POIBLÍ CHOMH MAITH LE OIBREACHA LÁITHREÁ GAOLMHARADecision record indexed
LARGANREAGH AND CROCKNAMURLEOG, DOWNINGS, LETTERKENNY PO
CONSTRUCTION OF A GARAGE ADJACENT TO THE DWELLING AND TO CARRY OUT ALTERATIONS TO THE ELEVATION OF DWELLING AND TO CARRY OUT OTHER SITEWORKSDecision record indexed
PLAN REF NO: 17/50816, FOR THE ERECTION OF A DWELLING HOUSE WITH CONNECTION TO THE PUBLIC SEWER, AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
DÉANFAR 6 THUILSOLAS, 15M AR AIRDE, COMH MAITH LE FÁLÚ TEROANN A CHUR TIMPEALL NA PÁIRCE PEILE ATÁ ANSIN FAOI LÁTHAIR, LENA MBEIDH OIBREACHA LÁITHREÁIN AG BAINT LEIS. TÁ STAIR AG BAINT LEIS AN IARRATAS SEO MAR GO NDEARNADH TUILSOILSE AGUS FÁLÚ TEORANN A CHEADÚ DON PHÁIRC SEO AG LEARGAIN RIACH, NA DÚNAIBH, CHEANA FHÉIN FAOIN IARRATAS PLEANÁLA 06/50340Decision record indexed
ALTERATIONS TO PREVIOUSLY APPROVED 14 BEDROOM GUESTHOUSE WITH LICENSED BAR AND RESTAURANT AT GROUND FLOOR LEVEL (PLANNING REF. NO. 23/51749 REFERS) INCLUDING (1) INTERNAL RECONFIGURATION AND PROVISION OF ADDITIONAL SPACE AT GROUND FLOOR, FIRST FLOOR AND SECOND FLOOR, (2) PARTIALLY ENCLOSED STRUCTURE WITH PARKING ON LOWER LEVEL AND TERRACE AT UPPER LEVEL, (3) ADDITIONAL ROADSIDE PARKING ALONG THE L-51123-0 ROAD AND PERMISSION FOR REVISIONS TO PARKING AREAS AND PROVISION OF SEPARATE BIN STORAGE AND OTHER ANCILLARY WORKSDecision record indexed
(1) CONSTRUCTION OF A 14 BEDROOM GUESTHOUSE INCLUDING ANCILLARY FACILITIES AND (2) PROVISION OF AN ON SITE SEWAGE TREATMENT PLANT TO PRETREAT THE SEWAGE OF EXISTING 4 APARTMENTS, DWELLING ON THE SITE AND PROPOSED NEW DEVELOPMENT WITH DISCHARGE OF TREATED EFFLUENT TO PUBLIC SEWER AND OTHER ANCILLARY WORKSDecision record indexed
CONSTRUCTION OF (1) AN APARTMENT BLOCK CONTAINING 7 NO. APARTMENTS (CONSISTING OF 3 NO. 1-BED APARTMENTS, 2 NO. 2-BED APARTMENTS AND 2 NO. 3-BED APARTMENTS), A RECEPTION/GENERAL PURPOSE AREA INCLUDING STAFF FACILITIES, A STORE ROOM (2) A DETACHED DWELLING AND (3) PROVISION OF AN ONSITE SEWAGE TREATMENT PLANT TO PRETREAT THE SEWAGE OF THE EXISTING 4 NO. APARTMENTS AND DWELLING ON SITE AND THE PROPOSED NEW DEVELOPMENT WITH DISCHARGE OF TREATED EFFLUENT TO PUBLIC SEWER AND ALL OTHER ANCILLIARY WORKSDecision record indexed
MOBILE HOME CONTAINING SITE OFFICE, STAFF TOILETS, OVERNIGHT STAFF ACCOMMODATION WITH CONNECTION TO PUBLIC SEWER AND FOR LANDSCAPING WORKSDecision record indexed
6 THUILSOILSE 18M AR AIRDE IN ÁIT NA DTUILSOILSE 15M AR AIRDE, A CEADAÍODH ROIMHE SEO FAOI THAGAIRT PHLEANÁLA 20/51578. TÁ STAIR AG BAINT LEIS AN IARRATAS SEO MAR GO NDEARNADH TUILSOILSE A CHEADÚ DON PHÁIRC CHEANA FHÉIN FAOIN IARRATAS PLEANÁLA 06/50340Decision record indexed
(1) RENOVATION AND REFURBISHMENT OF EXISTING DWELLING HOUSE (2)CONSTRUCTION OF A SINGLE STORY EXTENSION AND GARAGE TO THE REAR (3)DEMOLITION OF EXISTING OUTHOUSES (4) ALTERATION AND REPLACEMENT OF EXISTING WINDOWS AND DOORSDecision record indexed
(1) A FHÁIL DO SHÍNEADH A RINNEADH AR AN TEACH CÓNAITHE ATÁ ANSIN, LENA N-ÁIRÍTEAR OIBREACHA FORBARTHA SUÍMH AGUS (2) CEAD PLEANÁLA CHUN (A) FOROINNT A DHÉANAMH AR AN TEACH CÓNAITHE ATÁ ANSIN LE ‘HÁRASÁN MUINTIRE’, A BHEAS MAR PHÁIRT DE, A SHOLÁTHAR, (B) PÓIRSE A THÓGÁIL LE FREASTAL A DHÉANAMH AR AN ‘ÁRASÁN MUINTIRE’ ATÁ BEARTAITHE, (C) ARTHUITHE A DHÉANAMH AR LEAGAN AMACH NA BHFUINNEOG AR AN INGEARCHLÓ (THIAR), (D) AN GARÁISTE ATÁ ANSIN MAR CHUID DEN TEACH CÓNAITHE A ATHRÚ GO CÓIRÍOCHT CHÓNAITHE LE FREASTAL AR AN TEACH CÓNAITHE AGUS, (E) NA HOIBREACHA FORBARTHA SUÍMH UILIG A BHAINEANN LE SEODecision record indexed
CONSTRUCTION OF 63 NO. ADDITIONAL CARAVAN PITCHES AND 7 NO. LOG CABINS & ALL ASSOCIATED SITE WORKS INCLUDING (1) NEW FOUL EFFLUENT TREATMENT SYSTEM AND PUMP STATION INCLUDING CONNECTION TO EXISTING PUBLIC SEWER (2) NEW STORM WATER NETWORK INCLUDING ATTENUATION TANK AND A 3-STAGE WETLAND SYSTEM PRIOR TO DISCHARGE TO EXISTING WATER COURSE. AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) AND A NATURA IMPACT STATEMENT (NIS) ACCOMANPIES THIS APPLICATIONDecision record indexed
(1) DEMOLITION OF EXISTING SINGLE STOREY HOUSE, (2) CONSTRUCTION OF A NEW STOREY AND HALF DWELLING WITH SINGLE STOREY PROJECTION TO THE REAR, (3) RENOVATION WORKS TO EXISTING GARAGE TO MATCH THE NEW DWELLING APPEARANCE AND (4) NEW HOUSE TO BE CONNECTED TO EXISTING PUBLIC FOUL AND SURFACE WATER DRAINAGE ONSITE AND ALL ASSOCIATED SITE WORKS RELATING TO THE ITEMS ABOVE INCLUDING DEFINED BOUNDARY TREATMENTDecision record indexed
(A) DEMOLITION OF THE EXISTING SUNROOM, (B) ERECTION OF NEW EXTENSION TO THE EXISTING DWELLING HOUSE INCLUDING ALTERATIONS TO THE FRONT FACADE AND (C) ERECTION OF DOMESTIC GARAGE WITH ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed