to
to

Planning records

Showing 51-100 of 311 public records
Page 2 of 7
  1. © OpenStreetMap
    WEB1322/25Granted

    Site of 0.56 ha at Clanwilliam Court, Clanwilliam Place and Lower Mount Street, Dublin 2

    The site is bounded by Velasco Building and Osprey House, onto Grand Canal Street to the North East, Clanwilliam Place, to the East; Love Lane to the West and Mount Street Lower, to the South West. The proposed development consists of minor amendments to the permitted redevelopment of the existing Elm House (D02 A344), Block 1 Clanwilliam Court (D02 CF97), Clanwilliam House (D02 CV61), Marine House (D02 FY24) office buildings and former Clanwilliam Court Block 6 apartment building (D02 NR22) as permitted under DCC Reg. Ref.: 4126/22, ABP Ref.: PL29S.314983. The proposed amendments include: • Reconfiguration of the permitted lower ground floor to include for a reduction in the social hub space, reduction in the size of ancillary kitchen area associated with ground floor café unit, relocation of permitted gym unit and subsequent increase in office floorspace at this level. Additional reconfiguration of permitted cycle parking area, with no reduction in parking spaces, and associated cycle facilities. • Reconfiguration of permitted ground floor level to include for a relocated gym reception/juice bar, of 89 sq.m, from Clanwilliam Place to Mount Street Lower, filling in of previous double height space to lower ground resulting in an increased reception/social hub of 823 sq.m at this level, increase in permitted retail/ restaurant/café unit from 141 sq.m to 191 sq.m through removal of previously included fire access corridor and associated minor façade alterations to doors and glazing. • Reconfiguration of permitted first floor level include double height space to ground floor level to include for increased office space. • Reconfiguration of permitted basement level to facilitate changes to plant areas and internal routes. There is no change to permitted car parking or cycle parking numbers other than a reconfiguration to now accommodate cargo bike parking. An increase in associated cycle facilities i.e. shower and lockers is included for. • Minor alteration of 2 no. permitted courtyard/lightwells at the centre of the building and relocation of sanitary facilities resulting in minor floor space increase from second to seventh floor levels. • Alterations to the permitted northern façade of the building to incorporate changes required under Condition 2 of DCC Re. Ref.: 4126/22, ABP Ref.: PL29S.314983 and to provide for minor increase in panelled areas and to facilitate improved fire requirements. • These changes do not result in any increase in overall size of the building but a minor increase in overall gross floorspace of 194 sq.m from 36,657 sq.m to 36,851 sq.m (incl. basement areas). • Alterations to permitted external landscaping onto Clanwilliam Place to include relocated external stair to lower ground level from Mount Street side to Clanwilliam Place.Decision record indexed
    Decision23 June 2025View record
  2. © OpenStreetMap
    3158/25Granted

    189 Elm Mount Avenue, Beaumont, Dublin 9

    The development will consist of a) Demolition and safe removal of existing hipped roof structure at side (North West Elevation). b) The raising of existing gable wall to include 1no. window with obscure glass at side (North West Elevation) with modfications & extension of pitched roof structure over. c) Conversion of existing attic space for domestic storage/ancillary accommodation, including new access staircase and 2no. velux roof-lights at rear (North East Elevation ) d) Including all associated site and storm water drainage works.Decision record indexed
    Decision06 June 2025View record
  3. © OpenStreetMap
    D25A/0304/WEBGranted

    49, North Avenue, Mount Merrion, Blackrock, Dublin, A94A6P9

    Intend to apply for full planning permission for the following to the existing two storey fully serviced semi-detached house with attic space & single storey extension to the rear and side and porch to front. Full planning permission is sought for a single storey extension to the side with roof light over, minor alterations to the main front elevation with two new windows and an insulated roof over porch. New rooflights in the main roof front elevation. To the rear changing the glazing on the rear elevation to accommodate the new layout on ground floor, addition of a new dormer and rooflight on the rear main roof. Additional window in the side gable wall over new stair to attic space. Removal of existing chimney Minor changes internally to allow the new design. Widening of the existing vehicle entrance. Maintain connection to public sewerage and surface water and all ancillary site works.Decision record indexed
    Decision05 June 2025View record
  4. © OpenStreetMap
    SDZ25A/0007WGranted

    Within the townland of Cappagh and Clonburris, Clonburris, Dublin 22

    The development will consist of amendments to the permitted development as approved by South Dublin County Council under Planning Reg. Ref. SDZ23A/0018 comprising the Clonburris Development Areas CSW-S1 and CSW-S2 of the Clonburris SDZ Planning Scheme 2019 as follows: Site A (to the north of the permitted CSLS) the proposed amendments to the permitted layout and external elevations of Apartment Block B1 to include: i. A change to the location of window / terrace door at ground floor level; ii. The swapping of a terrace door / window at ground and upper floor levels; iii. Amendment to the stair core and omission of a step-out of the external wall at ground and upper floor levels; iv. Proposed relocation of a plant room door at ground floor level on the western elevation; v. Proposed change of doorway to bicycle store at ground floor level on the western elevation; vi. Provision of 1 no. Cleaner's Store at ground floor level (c.12.4 sq.m); vii. Proposed increase in area for PV panels from c.15 sq.m to c.175 sq.m and provision of 7 no. additional Automatic Opening Vents (AOVs) at roof level; viii. Provision of 2 no. additional internal fire doors at ground floor level; ix. Amendment to 6 no. units at ground floor level to provide for Universal Access; x. The amalgamation of 2 no. Plant Rooms, as approved under the parent permission, to provide for 1 no. single Plant Room (c.86.32sq.m) and a Meter Room (c.14.19 sq.m) located to the north of the Plant Room; xi. A proposed change from green roof, as approved under the parent permission, to brown roof; xii. The lowering of the higher roof parapet level from 74.47 AOD to 73.42 AOD on the western elevation; xiii. Proposed change of finish from render to buff brick on western elevation and provision of protruded buff brick detail on upper floor levels of northern, southern, eastern and western elevations; xiv. Provision of wall mounted feature panel (3.45 sq.m) at ground floor level on the western elevation; xv. Proposed change from brick finish to render at ground and upper floor level of the western elevation; and, xvi. The omission of dark render detail at upper floor levels on the western elevation. Site B (to the south of the permitted CSLS) the proposed amendments to the permitted layout and external elevations of Apartment Block B2 to include: i. A change in window location at ground and upper floors on western elevation due to a change in apartment layout; ii. Relocation of plant room door on ground floor level on eastern elevation; iii. the provision of a new window ope at ground and upper floor levels on the northern elevation; iv. Provision of Cleaner's Store (4.79 sq.m) at ground floor level; v. Proposed change to fenestration arrangement on northern, southern, eastern and western elevations due to change in apartment layout; vi. Amendment to arrangement of stairway; vii. Provision of 2 no. additional Automatic Opening Vents and increase in area for PV panels from 30 sq.m to 132 sq.m at roof level; viii. The lowering of the higher roof parapet level from 75.32 AOD to 74.47 AOD on the western elevation; ix. The amalgamation of 2 no. Plant Rooms, as approved under the parent permission, to provide for 1 no. single Plant Room (c.59.55 sq.m) and a Meter Panel Room (c.13.82 sq.m) located to the south of the Plant Room; x. Proposed change from green roof to brown roof; xi. The omission of dark render detail on the upper floors of the eastern elevation; xii. The provision of a wall-mounted feature panel (3.91 sq.m) at ground floor level on the western elevation; xiii The lowering of brick finish to window head height on the northern, southern and eastern elevations; xiv. The omission of a canopy above the permitted entrance on the eastern elevation; xv. The provision of protruded brick details at upper floor levels on the western elevation; and, xvi. The provision of alternative render panels on upper floor levels of the northern and eastern elevations. The proposed amendments will result in an overall increase in Gross Floor Area by 35.4 sq.m to 7,722.2 sqm and will also include the relocation of an ESB substation and associated switch room to the gable end of Apartment Block 2, the reconfiguration of the existing bin, bicycle and ESB room to provide for bin and bicycle storage only and a minor amendment to car parking spaces to provide for access to the relocated ESB substation and all associated/ancillary amendments.Decision record indexed
    Decision03 June 2025View record
  5. © OpenStreetMap
    D25A/0248/WEBGranted

    China Sichuan, The Forum, Ballymoss Road, Sandyford Business Park, Dublin 18, D18XH28

    The development will consist of: a) the demolition of existing single storey monopitch glazed restaurant conservatory and smoking extension (38 m2) to front (north-west) of existing ground floor restaurant facing Ballymoss Road and replacement with construction of a larger (42 m2) single storey, monopitch glazed restaurant conservatory and smoking area extension to front (north-west) of building. b) Relocation of existing self-illuminating wall mounted entrance sign in existing smoking area to corner of proposed front (north-west) elevation of new conservatory. c) All associated site works and drainage. All of the above at the existing 11 storey apartment building (including basement) known as The Forum.Decision record indexed
    Decision19 May 2025View record
  6. © OpenStreetMap
    WEB1621/25Granted

    The A & L Goodbody, 25North Wall Quay, Dublin 1, D01 H104

    Matagorda Unlimited Company intend to apply for planning permission for development at the A&L Goodbody Building, 25-28 North Wall Quay, Dublin 1, D01 H104. The site is bound by North Wall Quay to the south, an access ramp to existing basement to the east, Alderman Way to the north and the Spencer Hotel/an unnamed laneway to the west. The proposed development will consist of 1 no. totem sign, bolted to a concrete base along with 1 no. wall-mounted sign at the access ramp to the basement, and 25 no. wall-mounted signs on the northern elevation, including at the car parking entrance and loading bay.Decision record indexed
    Decision14 May 2025View record
  7. © OpenStreetMap
    2460651Refused

    Site 1 Phase 2 North Paddocks, Mount Juliet, Thomastown

    For provision of a revised entrance to that previous approved (Grant of Permission ref 21/389), driveway, parking area, detached garage and associated site works at Site 1, Phase 2, North Paddocks, Mount Juliet, Thomastown (formally described as Site opposite 10th Green, Mount Juliet). A number of Protected Structures exist at Mount Juliet Estate (inc. Refs C367, D24, C1021, C1022, C1023), however, no works are proposed to these structuresGrounds not yet categorised
    Decision12 May 2025View record
  8. © OpenStreetMap
    D25A/0179/WEBGranted

    2 The Rise, Mount Merrion, Blackrock, Co. Dublin, A94FW24

    Planning Permission for the Proposed works include; (i) Proposed alterations and internal Modification to the existing flat- roofed single-storey ground floor extension to the side of the main house (north) elevation, and construction of new proposed first floor extension to the side over the existing structure with internal access from the main house and external rear garden access door to the front; the roof to be an extension of the existing hipped roof and part flat roof to the rear extension. (ii) Proposed removal of the existing conservatory room and rear garden low wall connecting the main house and new proposed outdoor seating area proposed. (iii) Replacement of all existing windows/doors and refurbishment works on the Front Porch with a new entrance door and cladding to the front elevation. (iv) Widening of the existing vehicular entrance (accessed from The Rise Road) & provision of new gates and gate piers to the front garden. (v) Construction of a new single-storey ground floor extension at the rear with a flat roof that includes roof lights to the rear elevation (east). (vi) Proposed internal layout modifications and alterations to both existing ground and first floors of the main house. (vii) Conversion of the existing attic space into habitable accommodation with en-suite and store area, including the provision of three new Velux-type roof window to the slope of the main roof. (viii) All with associated site works, landscaping, and other services /drainage works to facilitate the proposed development.Decision record indexed
    Decision25 April 2025View record
  9. © OpenStreetMap
    FW25A/0062EGranted

    Site north of the Cherryhound-Tyrrelstown M2/M3 Link Road and west of

    Planning permission is sought for the proposed development that will consist of the installation of 1 no. temporary signage structure with uplighting, mounted on a lightweight steel structure over a concrete base (2.5m x 6m) with an aluminium display panel (6m width x 6m height), and all associated site works. The overall height, including the concrete base, is c. 8.1m.Decision record indexed
    Decision17 April 2025View record
  10. © OpenStreetMap
    2461160Granted

    The IDA Business and Technology Park, Raheen, County Limerick.

    A 10-year permission for development at our existing Biopharmaceutical Manufacturing Campus, located at Ballycummin, The IDA Business and Technology Park, Raheen, County Limerick. The proposed development consists of extensions, modifications, alterations and new structures to previously permitted and partly built Biopharmaceutical Manufacturing Campus (Limerick City and County Council Reg. Ref. 22190 and as amended by planning permission Reg. Ref.23152), with a proposed total additional floor area of approximately 67,997 square metres, located on the existing Eli Lilly site, north of Ballycummin Avenue and bounded by Patrickswell Road (R526). The development consists of all site buildings and infrastructure required to support the new campus extension, including the following; (a) A 4-storey Biopharmaceutical Manufacturing Facility sized approximately 52,400 square metres and approximately 34 metres high, with roof-mounted plant and equipment, including solar panels. (b) An extension to the previously permitted single storey Central Utilities Plant (CUP) Building sized approximately 1,050 square metres and approximately 10.6 metres high, with roof-mounted plant and equipment and additional acoustic screening at roof level. (c) An extension to previously permitted single storey pedestrian link with a roof-mounted pipe rack, sized approximately 3,440 square metres and approximately 10.6 metres high. (d) An extension to the north-west side of the previously permitted 2-storey canteen, laboratory and administration building with roof-mounted plant and equipment, acoustic screens and solar panels at roof level, sized approximately 2,200 square metres and approximately 13.5 metres high. (e) An extension to the south-east side of the previously permitted 2-storey canteen, laboratory and administration building with roof-mounted plant and equipment, acoustic screens and solar panels at roof level, sized approximately 2,200 square metres and approximately 13.5 metres high. (f) An additional 2-storey Central Utilities Plant (CUP) Building sized approximately 5,400 square metres and approximately 10.6 metres high, with 4no. Boiler Stacks approximately 17 metres high and roof-mounted plant and equipment and additional acoustic screening at roof level. (g) A single storey Storage Building sized approximately 520 square metres and approximately 6 metres high located to the north of the site. (h) A single storey Firewater pumphouse sized approximately 90 square metres aDecision record indexed
    Decision16 April 2025View record
  11. © OpenStreetMap
    2560062Granted

    Beech Hill College, Dubin Road, Tirkeenan

    Permission for development consisting of: a) Minor amendments to the elevational treatments to the previously permitted planning application (Reference: 22/510) b) The construction of a new two-storey extension linked to the existing post-primary school consisting of 6 no. general classrooms, 1 no. construction studies room with a preparation area, 2 no. science laboratories with a preparation area, 1 no. specialist classroom, 4 no. tuition rooms and 3 no. classbase special educational need suite and ancillary accommodation (total area = 2,230m², no change to previously permitted planning reference: 22/510) c) The installation of a solar PV array of 32 panels each of which are 1800mm x 1100mm with a total peak output of 12.8kW. d) The installation of polyester powder-coated individual lettering pin-mounted on spacers raised off the surface and rear illuminated (LED) to the north elevation of the proposed extension e) and associated ancillary site works (no change to previously permitted planning reference: 22/510)Decision record indexed
    Decision15 April 2025View record
  12. © OpenStreetMap
    2460697Granted

    Arklow Shipping HQ, Mill Road North Quay, Arklow

    Installation of 109.08 KW (512.9M2) of ground mounted Solar PV Array and associated site works and services. Included in this application is a Landscape visual impact assessment (LVIA),an appropriate assessment screening (AA), a site specific flood risk assessment, and a glint & glare assessmentDecision record indexed
    Decision31 March 2025View record
  13. © OpenStreetMap
    25/4124Granted

    Cogans Garage Ltd Cork Road, Carrigaline Middle Carrigaline Co.Cork

    Permission for a) a 92sqm single storey extension to the north of the existing car dealership to accommodate additional showroom area, b) new shopfront recladding of the west façade and partially of the south façade to match the finish of the new extension, c) new vehicular access to south façade of car showroom, d) the removal of all existing Toyota signage (6 no.) and replacement with 8 new internally illuminated signs comprising 4 free standing signs and 4 building mounted signs, e) redecoration, all associated drainage and site worksDecision record indexed
    Decision26 March 2025View record
  14. © OpenStreetMap
    2560083Refused

    Townlands of Portgloriam Clonsast Ballybrack Ballyloughlan Farrandum, Clonduff Clonfert North and Laragh, Balraheen

    For a period of 10 years to construction and complete a Solar PV and BESS Development with a total site area of 235.8 hectares to include PV panels mounted on metal frames, inverter stations, battery storage infrastructure, (BESS units, PCS Units, storage and maintenance units), new access tracks, underground cabling, perimeter fencing with CCTV cameras and access gates, temporary construction compounds and all ancillary grid infrastructure and associated works. The solar farm would be operational for 40 years. A Natura Impact Statement (NIS) will be submitted with this applicationGrounds not yet categorised
    Decision24 March 2025View record
  15. © OpenStreetMap
    2460574Granted

    Former Cemex site at Maudlins roundabout, Dublin Road Link with Fishery Lane, Naas

    For demolition of all existing buildings on the site (c.9,949sq.m) and north and north-western boundary wall. Provision of new Electric Vehicle Charging Hub for 36 vehicles (all under canopy measuring 3.22m high) along with 8 no. EV bus/HGV charging spaces. Construction of 8 no. buildings (total gfa 10,527.59sq.m) as follows: Distribution centre: single storey structure including offices (gross floor area 9,383.85sq.m) with a maximum height of 19.5m. It includes 13 no. loading bays, Service station – single storey building (759.5sq.m) including net retail area of 99.7sq.m, 3 no. food offers, seating area, drive-thru hatch, toilets, back of house area and external storage compound. The maximum height is 8.55m high. Drive-thru café – single storey building (256.70 sq.m) including kitchen, back of house, seating area and drive-thru hatch. The maximum height will be 6.24m. Substation (gfa 33.54sq.m). External generator (gfa 37.58sq.m) Service compound (gfa 37.58sq.m) Water pump house (gfa 12sq.m) Refuse compound (gfa 6.84sq.m) There will be signage on the distribution centre, service station and drive-thru café buildings. Free standing signage is also proposed within the site and a totem sign measuring 17.5m high and an information sign measuring 6.8m high at the perimeter of the site. All ancillary development including fuel pumps under canopy (5.6m high), underground tanks, vent pipes, HGV fuel pumps (5.6m high), modified vehicular entrance off Maudlins roundabout, replacement entrance off Johnstown Road with new slip lane, new spine road, car parking (169 – including EV parking and accessible spaces), cycle parking (46) with canopy over (3.1m high), HGV/Bus parking (16 no. – including 8 no. EV parking spaces, HGV only parking 3 no.), drainage infrastructure, boundary treatments, hard and soft landscaping (including detention basins), internal roads, footpaths and cycle lanes, outdoor exercise areas, outdoor eating/picnic areas, covered smoking area, overground tank, roof mounted solar panels, new internal roundabout junction, internal control sliding gate, underground fire water storage tank and lighting. All associate site works. The proposed development also includes works on lands in the ownership of Kildare County Council as part of the Key development Area Master Plan and Access Strategy agreed with Kildare County Council, to include: 1. Provision of a left slip lane from the R445 (Dublin Road) to the Monread Road at the Dublin Road RoundaboutDecision record indexed
    Decision07 March 2025View record
  16. © OpenStreetMap
    2560007Granted

    Dundalk Science & Technology Park, Mullagharlin Road, Dundalk Co. Louth

    Retention of the following: 10sqm single storey electrical Meters Building. Main industrial building: Roof: 7 No. flues to max 1.6m height above the parapet level. North Elevation: 9 No. services penetrations and a 0.5x0.5m façade mounted grill. East Elevation: 4 No. services penetrations and 2 No. 2x2.5m louvred screens. Previously approved 1215sqm external yard to North-East of site increased to 1340sqm to include all associated security and acoustic fencing. Previously approved 8.5m high nitrogen tank increased to 11.8 m high. Minor amendment to location of the previously approved MV Switchroom building with associated fencing amendments. Updated landscaping plan inclusive of amendments to screening to Northern and Eastern site boundariesDecision record indexed
    Decision28 February 2025View record
  17. © OpenStreetMap
    2460491Refused

    Fearmore, Coole, Co. Westmeath

    Mixed use development. The development comprises of the following: (a) 2 storey 80-bed nursing home complete with all necessary roof mounted plant and a service yard to accommodate additional plant and equipment including a sprinkler tank, an ESB sub-station with switch room and bin stores; (b) change of use for from an existing derelict chapel to a convenience store. Permission is also sought for the internal and external modifications to the existing derelict chapel and an outdoor seating area 18.6m2; (c) 44 no. residential units including (i) 22 no. 1 storey 2 bed semi-detached bungalow units; (ii) 17 no. 1 storey 1 bed detached units; (iii) 2 no. 2 storey 3 bed semi-detached units; (iv) 2 no. 2 storey 4 bed semi-detached units; (v) 1 no. 2 storey 3 bed detached unit; (d) lawn bowls green (466m2), allotments (110m2) and park areas (5,668m2); (e) all associated site works including (i) foul and surface water drainage, and water mains; (ii) vehicular/pedestrian entrance and access roads from the existing R395 road to the north and the existing laneway off the R395 road to the east of the site; (iii) bicycle parking (iv) landscaping (v) building signage; and (vi) all other associated site development works. The development is within the curtilage of a protected structure, RPS no.: 003-047, St. Joseph's Orthopaedic Hospital complex as recorded in the Westmeath County Development Plan 2021-2027Grounds not yet categorised
    Decision21 February 2025View record
  18. © OpenStreetMap
    LRD24A/0882/WEBGranted

    Site of 2.54 hectares, Knockrabo, Mount Anville Road, Goatstown, Dublin 14

    Permission for a Large-scale Residential Development (for a period of 7 years) with a total application site area of c. 2.54 hectares. The proposed development relates to Phase 2 of the development on the ‘Knockrabo’ lands. Phase 1 of ‘Knockrabo’ was granted under Dún Laoghaire-Rathdown County Council (DLRCC) Reg. Ref. D13A/0689/An Bord Pleanála (ABP) Ref. PL06D.243799 and DLRCC Reg. Ref. D16A/0821 (Phase 1) and DLRCC Reg. Ref. D16A/0960 (Phase 1A) and comprises a total of 119 No. units. The site is bounded to the south-east by Mount Anville Road; to the south by ‘Mount Anville Lodge’ and by the rear boundaries of ‘Thendara’ (a Protected Structure – RPS Ref. 812), ‘The Garth’ (a Protected Structure – RPS Ref. 819), ‘Chimes’, ‘Hollywood House’ (a Protected Structure – RPS Ref. 829); to the south-west by existing allotments; to the north by the reservation corridor for the Dublin Eastern By-Pass (DEBP); and to the east by the site of residential development ‘Knockrabo’ (Phase 1, permitted under DLRCC Reg. Ref. D13A/0689 / An Bord Pleanála (ABP) Ref. PL.06D.243799 and DLRCC Reg. Ref. D16A/0821 (Phase 1); and DLRCC Reg. Ref. D16A/0960 (Phase 1A)). The site includes ‘Cedar Mount’ (a Protected Structure- RPS Ref. 783), ’Knockrabo Gate Lodge (West)’ (a Protected Structure RPS Ref. 796), including Entrance Gates and Piers. The development with total of c.17,312.2 sq.m. gross internal area (GIA) will consist of the construction of 158 No. residential units (12 No. houses and 146 No. apartments (35 No. 1 beds, 81 No. 2 beds, 3 No. 3 beds and 27 No. 3 bed duplex units), a childcare facility (c.400 sq.m. GIA) and Community / Leisure Uses (c. 223 sq.m. GIA), as follows: Block E (c.1,077 sq.m. GIA): a 5-storey including semi-basement podium level apartment block, comprising 8 No. apartments (1 No. 1 bed and 7 No. 2 beds); Block F: (c.8,390.8 sq.m. GIA): a part 2 to part 8 storeys including semi basement podium apartment block, comprising 84 No. units (31 No. 1 beds, 50 No. 2 beds and 3 No. 3 bed duplex units); Block G: (c.2,022.1 sqm GIA): a part 4 to part 5-storey apartment block, comprising 20 No. units (3 No. 1 bed units, 14 No. 2 bed units and 3 No. 3 bed units); (with sedum roof/PV panels at roof level of Blocks E, F and G; a communal Roof Terrace of c. 198 sqm on Block F; and balconies/wintergardens on all elevations of Blocks E, F and G); Duplex Blocks: (c. 3,292.6 sqm GIA): 1 No. 3 storey and 1 No. 4 storey block, comprising a total of 32 No. units (8 No. 2 bed units and 24 No. 3 bed duplex units); 10 No. (new build) houses: 6 No. 4 bed 2.5-3 storey terraced/semi-detached units (ranging in size from c.162.1 sqm GIA to c.174.2 sq.m. GIA); 1 No. 3 bed 2 storey detached unit (126.2 sq.m. GIA); 1 No. 3 bed 2 storey mid terrace unit (c.127.4 sq.m. GIA); 1 No. 3 bed 2 storey end of terrace unit (c.127.9 sq.m. GIA); and 1 No. 1 - 2 storey ‘Gate House’ (c. 122.6 sq.m. GIA) to the west of proposed repositioned entrance to Cedar Mount from Mount Anville Road; The use of existing ‘Coach House’ as a residential dwelling and for internal / external repair / refurbishment works at ground and first floor levels, including the removal of 3 No. roof lights, 1 No. metal clad dormer roof window and external water tank; the construction of 2 No. single storey flat roof extensions (c.35.5 sq.m. GIA), revisions to the external facade including the addition of 1 No. new window ope on the south facade and rendered finish to all original facades, solar panels at roof level; removal / re-use of stone to form new garden wall; to provide 1 No. 2 bed house (c. 99.5 sq.m. GIA) with refurbished stone shed (c. 13.9 sq.m. for storage GIA). The use of Knockrabo Gate Lodge (West) (a Protected Structure) as a residential dwelling; and for repair / refurbishment works including demolition of existing section of extension on top of stone boundary wall; removal of 1 No. roof light and 1 No. internal partition wall; construction of replacement extension (c.77.5 sq.m. GIA) to provide 1 No. 3-bed unit (c. 128 sq.m. GIA) with solar panels at roof level, bin storage, landscaping, all repair works to the existing Gate and Piers, and all associated internal and external elevational changes. The proposed development comprises works to Cedar Mount (a Protected Structure) to provide: 1 No. Childcare Facility at Lower Ground Floor level (c.400 sq.m. GIA) with associated external play and bin storage areas; Community / Leisure Uses at Ground Floor Level (c. 223 sq.m. GIA), comprising Gym / Studio (c.35.6 sq.m. GIA), Library / Office (c. 35.9 sq.m. GIA), Meeting room (c.28.4 sq.m. GIA) and Conservatory room (c. 21.6 sq.m. GIA); and 2 No. 2 bed apartments at 1st floor level, (c.77.6 sq.m. GIA and c.88.2 sq.m. GFA). The works to Cedar Mount to consist of: At lower ground floor/ basement level, the removal of internal walls and sections of external and internal walls and access doors; insertion of openings through external and internal walls; repair of existing “loggia” (covered external corridor) on northern, north-western and north-eastern facades, with revised elevations comprising glazed panels / glazed entrance doors located within loggia opes; the additional area (c. 58 sq.m. GIA) to form part of proposed Childcare Facility; At ground floor level removal of wooden staircase to 1st floor level and replacement with open-tread staircase, and construction of conservatory room (c. 21.6 sqm GIA) with flat roof on south - western side of Cedar Mount with sedum roof; removal of 1 No. WC; At 1st floor level removal of sections of internal walls; insertion of doors through internal walls; o Re-instatement of 1 no. new chimney stack on the western end of the existing roof; replacement of rubble masonry finish with lime and sand plaster finish on all elevations relating to sections of original façade; removal of security bars from existing windows in front porch; replacement / reconfiguration of rainwater downpipes, hopper heads and associated roof outlets; Re-modelling of extension on northern side including replacement of timber / pressed metal cladding with brick / zinc cladding and glazing at ground and 1st floor levels, removal / replacement of external doors and windows; replacement of flat roof deck, parapet, eaves and roof-light with flat roof comprising brick / zinc clad parapet and removal of internal link at 1st floor level; repair works to external walls at ground floor level; Construction of rendered blockwork wall and steel handrail to terrace and associated repair works to section of existing parapet wall on eastern side of Cedar Mount; all hard and soft landscaping; revisions to garden wall and pillars on western side of Cedar Mount; and all associated internal and elevational changes; and the repositioning of existing access (including gates and piers) to Cedar Mount (a Protected Structure) on Mount Anville Road to the northeast with associated works to boundary wall to Mount Anville Road. The development will also provide 130 No. car parking spaces consisting of 117 No. residential spaces (comprising 54 No. at podium level, 63 No. on-street and on curtilage spaces, 6 No. visitor spaces and 2 No. on-street car sharing spaces); and 5 No. non-residential spaces; provision of 366 No. bicycle parking spaces (consisting of: 288 No. residential spaces, 70 No. (residential) visitor spaces, 6 No. (non-residential) spaces and 2 No. visitor (non-residential) spaces); and 9 No. motorcycle parking spaces. All other ancillary site development works to facilitate construction, site services, piped infrastructure, 1 No. sub-station, plant, public lighting, bin stores, bike stores, boundary treatments, provision of public, communal and private open space areas comprising hard and soft landscaping, site services all other associated site excavation, infrastructural and site development works above and below ground. In addition to the repositioned access to Cedar Mount (a Protected Structure) as referenced above, the development will be served by the permitted access road ‘Knockrabo Way’ (DLRCC Reg. Ref. D13A/0689; ABP Ref. PL.06D.243799, DLRCC Reg. Ref. D16A/0821 and DLRCC Reg. Ref. D16A/0960). The application does not impact on the future access to the Reservation for the Dublin Eastern Bypass. The planning application may be inspected online at the following website: www.knockrabolrd.comDecision record indexed
    Decision19 February 2025View record
  19. © OpenStreetMap
    WEB2271/24Granted

    50/51, O'Connell Street Lower, North City, Dublin 1

    McDonald’s Restaurants of Ireland Ltd. intend to apply for planning permission for development at Nos. 50/51 O’Connell Street Lower, Dublin 1. The development will consist of proposed improvement works to the existing shopfront/front eastern elevation to include new window frames and glazing to the upper floors to replace existing frames, new window fascias to match existing, new bay window fascias to high level shopfront decorated to match existing, new marble fascia to match existing, revised entrance design to include new sliding entrance doors, new full height glazing and low stall riser to match existing, new shopfront signage to replace existing signage to include internally illuminated projecting sign, wall mounted golden arch and ‘McDonald’s’ text signage, new orb, new digital window poster, and all associated site works necessary to facilitate the development.Decision record indexed
    Decision14 February 2025View record
  20. © OpenStreetMap
    2461081Granted

    Tayto Snacks Ltd., Kilbrew Ashbourne, Co. Meath A84 F854

    The demolition of the existing single & two storey offices & high level walkway structure, (2,118 sqm in extent) and the construction of replacement new two storey office buildings with roof top comms/plantroom and external roof mounted plant with louvred screens and roof mounted photovoltaic solar panels (2,734 sqm in extent), the rearranging of the car parking to the front (North) complete with the landscaping of the resultant area, a new substation/transformer room/switchroom (52.5 sqm in extent), to the rear of the existing factory building and all associated site works at our premises at Kilbrew, Ashbourne, Co. Meath. The installation to rear of the site of temporary portacabins (1000 sqm in extent) to house office workers during construction. These buildings will be served by a new wastewater treatment system connected to the existing wastewater system serving the existing offices. These temporary structures will be removed once the new office is constructed and available for occupation. There will be no changes to the existing access, circulation within the overall site or to the industrial buildings and processes on site as a consequence of this applicationDecision record indexed
    Decision11 February 2025View record
  21. © OpenStreetMap
    24/224Granted

    Dunmanway North, Dunmanway South, Brookpark and Underhill (townlands) Dunmanway Co. Cork

    Upgrade works to the existing wastewater network and all associated site development works: 1. Decommissioning of 485 linear meters of sewers along the north bank of the Sally (Dirty) River, in addition to the upstream river crossing, and 648 linear meters of sewer from the Quarry Road Pumping Station to the Clonakilty Road (R-599) via Brookpark including 2 no. existing river crossings of the Sally (Dirty) River and Brewery River. The existing sewers and manholes will be removed where the new pipeline coincides with the existing pipeline (approximately 305m of pipeline in total). All other sections of pipeline will be left in situ when decommissioned. 2. Upgrading and replacement of foul sewer consisting of the laying of c.1,267 linear metres of new underground pipework and associated manholes across public roads (L-4620, L-8691, L-8680, R-599) and private lands, including provision of 3 no. watercourse crossings at the Sally (Dirty) River and Brewery River. 3. Upgrades to Quarry Road Pumping Station consisting of the provision of 2 no. additional storm tanks, inlet screen, 3 no. new storm pumps, rising main diversions, interconnecting pipework and chambers, odour and electrical control infrastructure, overhead cabling, relocation of existing pole-mounted transformer, photovoltaic panels with associated controls / interfaces, provision of new control kiosks and adjustments to perimeter fencing. 4. Upgrades to Longbridge Pumping Station consisting of 1 no. additional storm overflow tank, inlet screen, 3 no. new storm pumps, replacement of existing foul pumps and macerator with 2 no. submersible electric pumps, interconnecting pipework and chambers, replacement outfall pipe, rising main diversions, odour and electrical control infrastructure, overhead cabling, photovoltaic panels with associated controls / interfaces, relocation of existing terminal pole and the existing control kiosk, provision of new control kiosks, and adjustments to perimeter fencing. 5. Tree removal and replacement planting, landscaping, and all associated site development and reinstatement works including ancillaries and excavation works above and below ground for the proposed works. The project will be constructed in the Dunmanway Agglomeration area licenced under the Waste Water Discharge (Authorisation) (WWDA) Regulations 2007 (Licence D0160-01 A). This application relates to a proposed development which requires a review of the existing WWDA Licence. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and will be submitted to the Planning Authority with this application. The planning application and the NIS may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority, Norton House, Skibbereen, Co. Cork, during its public opening hours i.e. 9.00a.am. to 4.00 p.m. Monday to Friday (excluding public holidays).Decision record indexed
    Decision16 January 2025View record
  22. © OpenStreetMap
    2460551Granted

    Cosmona & Loughrea, Gallows Hill (R350)

    The construction of a single storey, discount foodstore with ancillary off-license sales area. Construction of surface level car parking spaces, including electrical vehicle (EV) charging spaces and pre-wiring other spaces to accommodate future EV parking; cycle stands; trolley bay canopy; hard and soft landscaping and boundary treatments including retaining structures; ESB substation building; site lighting; mechanical plant area; roof mounted photovoltaic panels; all advertising signage including a “flagpole” sign at the entrance. Vehicular access and egress for the foodstore is from the R350 which will require works to the existing stone wall on the west side of the R350 a new footpath and land reserved for a cycle path along the east side of the site; on site drainage infrastructure including SUDS measures; connection to existing watermain; and construction of foul drain connection from the application site to an existing foul drain at Hazelwood to the north. All other works required to complete the development. The application is accompanied by a Natura Impact Statement. A Protected Structure, RPS reference 330 on its attendant grounds. Gross floor space of proposed works: 2,326.50 sqmDecision record indexed
    Decision08 January 2025View record
  23. © OpenStreetMap
    2460449Granted

    Nenagh North Nenagh South and Tyone, Abbeycourt Hotel Dublin Road, Nenagh

    (1) ground mounted solar PV panels with new fence enclosure and access gates; (2) a container battery storage installation with 6 electric vehicle charge points, and associated site worksDecision record indexed
    Decision04 December 2024View record
  24. © OpenStreetMap
    2460506Granted

    Deerpark, Ardnacullia South, Ennistymon Co. Clare

    Of the following: a) Retention of works to the existing farmhouse, a dry building (56.06 sq.m.) including replacement of existing slate roof with grey, powder coated corrugated aluminium roof; the installation of roof mounted solar panels and associated infrastructure as well as 2 no. rooflights, 2 no. external doors; b) Retention works to widen an existing agricultural entrance on the Ardnaculla Road from 6m to 7.4m as well as permission for upgrade works to the entrance including the provision of a new timber gate, the set back of an existing wall and as surface water drainage; c) Retention of a standalone staff welfare facilities (wooden cabin); d) retention of works to provide a car parking area as well as permission for extension of the car park; e) retention of internal access tracks to the northeast and southwest; f) The development of a new internal access track running north-south across the site; g) Temporary Retention of 1 no. composting toilet; h) Retention of volunteer accommodation cabin; i) retention of a farm office; j) PERMISSION for the development of 5 no. horticultural polytunnels (1464 sq.m, with a maximum height of 3.6 m); k) Permission for the development of 1 no horticultural shed (212 sq.m.) with a maximum height of 7m; l) Permission for the development of a welfare block (43.4 sq.m) including toilets and washroom and associated treatment unit and percolation area; m) all associated site development and site enabling worksDecision record indexed
    Decision04 December 2024View record
  25. © OpenStreetMap
    2461251Refused

    Kilnaborris, Lairakeen House Ballinasloe, Co. Galway

    For: (a) Conservation and protection of all existing viable trees and woodland areas and the natural environment as a fundamental objective of the development and the extensive planting of additional native tree species, as well as other planting proposals in keeping with biodiversity objectives, the design heritage of the estate and the proposed development. A small number of minor and diseased trees are proposed for removal to accommodate safe site circulation. (b) Construction of a visitor centre comprising a restaurant, café and gift shop, which will be fully universally accessible with interpretation and visitor servicing. (c) The provision of 10 no. timber shepherd's huts raised above ground levels, to conserve existing ground conditions and preserve through routes for movement of wildlife. The huts, arranged in a cluster, are confined to the north eastern portion of the lands, carefully respond to their specific site context, respecting existing woodlands and topographical conditions. The provision of an external guest communal area. (d) Provision of 2 no. butterfly domes, a garden dome with internal water feature, a media dome, vivarium and mining experience to provide interactive immersive experiences, enhancing awareness and promoting environmental stewardship. (e) Construction of a playground and petting farm area. (f) Provision of sensitively designed landscaped areas, including paths and paved terraces, native, ornamental and screen planting; seated areas; timber cycle shelters and pergolas and water features. Resurfacing of existing pathways with minor extensions and realignments to avoid tree canopy overhangs. (g) Sustainable energy sources with the use of roof-mounted renewable solar photovoltaic panels and plant. (h) Provision of an entrance gate to provide vehicular access from the R356, with related walls and signage, demolition of existing boundary wall and new hedgerow with post and rail fence to define boundary. (i) Construction of 1 no. permeable asphalt surfaced car park providing a total of 250 no. car parking spaces including 18 no. designated parking spaces and 6 no. bus parking spaces and a separate recreational vehicle (RV) area. The majority of the parking bays will be gravel and the designated parking bays will be asphalt. The car parking provision includes for the future installation of EV charging facilities for 20% of the car parking spaces. (j) Provision of public lighting/foul sewer drainage & all site works. (NIS)Grounds not yet categorised
    Decision14 November 2024View record
  26. © OpenStreetMap
    SD23A/0304Granted

    Townlands Of Tymon North And Templeogue, Spawell Golf and Leisure Centre, Templeogue, Dublin 6W, D6W PY06

    The development will consist of a GAA Cluster Facility including: a) 3 no. floodlit GAA pitches (Pitches No's 1., 3. & 4.) comprising; Pitch no. 1, a sand-based grass pitch (145m x 90m) with floodlights with a lux level of 500 mounted on 7 no. 21.4m high columns; Pitch no. 3, a sand-based grass pitch (140m x 90m) with floodlights with a lux level of 350 mounted on 6 no. 21.4m high columns; Pitch no. 4, a synthetic all weather pitch (140m x 90m) with floodlights with a lux level of 350 mounted on 6 no. 21.4m high columns; All pitches will have GAA goal posts and ball stop netting to rear of same, (90m x 16m in height to the eastern end of Pitch no. 1 and Pitch no. 4 and 30m x 16m in height elsewhere) electronic scoreboards and 2 dugouts each, a railing around the perimeter of each of the sand-based pitches and 2.4m sports fencing around the perimeter of the all-weather pitch. b) The provision of floodlighting for Pitch no. 2, which is under construction (Ref. ED 19/0005) with floodlights with a lux level of 350 mounted on 6 no. 21.4m high columns); Three floodlight mountings serving Pitch no. 2 are on three shared columns also serving Pitch no. 3. c) The construction of a single storey Pavilion building (2050 m2) to provide 10 no. team changing rooms, showers and toilets, male and female officials changing rooms, kitchen preparation and service area, dining / multi-purpose room, team meeting room, gymnasium / weights room, medical room, physio room, first aid room, storage, tuck shop, reception, cleaning supplies room, office, changing places room, male WC, female WC, unisex WC, foyer/ entrance lobby and plant room. The Pavilion building will include photovoltaic panels on the roof and associated heat pump enclosure. d) the provision of a separate Indoor Training Facility including a 20m x 30m pitch. (600m2) e) Maintenance garage (200 m2) adjoining Indoor Training Facility building. f) the construction of a spectator stand to the south of Pitch no. 1 to accommodate 500 seated spectators with roof/cover, with Public Toilets (male and female) and equipment storage and plant located in undercroft of the stand. g) a 500 person uncovered terraced spectator stand, on the south of Pitch no. 1 consisting of two separate 250 person terraces either side of the main spectator stand h) Hurling wall, 5m in height and 105m in total length on two sides of an all weather hurling practice area / warm up area (40m x 65m) and also including 2.4m high fence and floodlights with a lux level of 300 mounted on 4 no. 18m high columns. i) a sprint training area of synthetic all weather surface adjoining the hurling warm-up area. j) Plaza area; space between Pitches no. 1, 3 & 4, and Pavilion Building with hard and soft landscaping including permeable paving areas. k) a walking/jogging trail (1.32km) with outdoor exercise equipment within the perimeter of site, l) a proposed new signalized junction roadway and pedestrian/ cyclist access onto Wellington Lane at its junction with Rossmore Road; m) 112 car parking including 84 no. standard car parking spaces, 5 no. universal access spaces, 23 no. electric vehicle parking spaces with associated charging points and the provision of an additional 55 no. overflow spaces for intermittent use with a grasscrete finish, 4 no. coach spaces and bicycle stands for the parking of 161 no. bicycles. n) demolition of the driving range bays (820 m2), at Spawell Golf Academy. o) demolition of part of Indoor soccer pitch facility (296 m2 area to be demolished) at Spawell Leisure Centre. p) removal of part of outdoor soccer pitch (326 m2 area to be removed) at Spawell Leisure Centre. q) demolition of 1 no. maintenance shed (34 m2) at Spawell Leisure Centre. r) SuDS Measures including a combination of stone-attenuation beds within pitches, tree pits, permeable overflow parking surface, permeable paving to plaza area, grassed swales and channels. s) an ESB substation and 2 no. switch rooms, housed in one structure of overall area 57m2. t) site clearance to include removal of trees and vegetation. In addition, the development will include; u) Earthworks, drainage infrastructure and attenuation, retaining structures, signage, landscaping, security fencing / boundary treatment, bin storage, and all other associated site development works above and below ground level. A Natura Impact Statement (NIS) will be submitted to the planning authority with this application.Decision record indexed
    Decision14 November 2024View record
  27. © OpenStreetMap
    3785/24Granted

    46-47 and 54-62 Henry Street, Dublin 1., The site is bounded by Coles Lane to the east and the ILAC Shopping Centre to the north.

    The development will consist of the change of use of retail/café floorspace to gymnasium (c. 2,559 sq m) at third floor level and including internal alterations at ground level floor to accommodate the provision of a new entrance to Cole Lanes, an entrance lobby, bicycle parking and circulation areas (c. 118 sq m). The development will also consist of signage elements as follows: 2 No. new digital screens (2500mm x 2000mm each), 5 No. internal new illuminated static lightboxes (2 No. 2500mm x 2000mm and 3 No. 1250mm x 2000mm) and 7 No. new internally illuminated suspended window signs (3 No. 800mm x 358mm, 2 No. 787mm x 287mm, 1 No. 889mm x 250mm and 1 No. 1014mm x 250mm), all located internally on the southern elevation, fronting Henry Street, at ground floor level. 2 No. new internally illuminated suspended window signs (1 No. 800mm x 358mm and 1 No. 788mm x 287mm), 3 No. new illuminated static lightboxes (1 No. 2500mm x 2000mm, 1 No. 3000mm x 2000mm and 1 No. 1500mm x 2000mm), 2 No. vinyl brand logos sets (500mm x 2000mm each) and 2 No. vinyl graphics (1 No. 3663mm x 4148mm and 1 No. 7988mm X 4158mm), 1 No. vinyl sign adjacent to the proposed gym entrance (600mm x 800mm) and 1 No. internally illuminated sign located centrally above the proposed gym entrance (1900mm x 1900mm), all located internally on the eastern elevation at ground floor level, fronting Coles Lane. 1 No. illuminated, externally mounted sign (1852mm x 830mm) located centrally above the existing main entrance (c. 3.7m above the finished floor level), 6 No. internally illuminated suspended signs hung within the existing void of corner feature window (1 No. 3083mm x 1382mm, 1 No. 1885mm x 1885mm, 1 No. 810mm x 210mm, 1 No. 810mm x 405mm, 1 No. 760mm x 515mm and 1 No. 760mm x 525mm) and 8 No. illuminated brand logos sets fret cut on either side of the entrance (500mm x 2000mm each), all located to the south- east of the site, at the corner of Henry Street and Coles Lane junction. 2 No. existing double-sided blade signs (1698mm x 8617mm each) located above ground floor level on the southern (Henry Street) and eastern elevations (Coles Lane) to be reskinned with new replacement internally illuminated lettering. The development will also include: the removal of the existing glazing system, bulkhead, canopy and alcove entrance and replacement with extended height glazing, a new entrance doorset, and new emergency access at ground level on Henry Street; the provision of new aluminium external cladding (including associated signage) to the existing main entrance at ground floor level to the south-east of the site, at the junction of Henry Street and Coles Lane; the removal and replacement of ancillary plant equipment at roof level; the provision of LED window lighting and all ancillary above and below ground.Decision record indexed
    Decision04 November 2024View record
  28. © OpenStreetMap
    4176/24Granted

    32 Mount Prospect Grove, Clontarf, Dublin 3, D03KA46

    For the following: 1. Skylight to North Roof Slope. 2. To remove existing roof hip on the East Side and extend it with an ''A'' line gable wall type to include a window with frosted glazing. 3. To construct a dormer roof on the South Roof Slope and convert the attic for use as Study/ Playroom and Attic Storage.Decision record indexed
    Decision14 October 2024View record
  29. © OpenStreetMap
    2460240Granted

    'Hearthfield' Headford Road, Mount Avenue Farndreg, Dundalk

    Permission for revisions to phases 2 and 3 of the permitted development at "Hearthfield" only and affects 19 no. dwellings. It also includes the re-positioning and configuration of public open space and revisions to drainage and boundary treatments. The amendments proposed as they affect the Phase 2 permission (P.A. Ref. No. 20/210) affect permitted House No.’s 95, 96, 120 and 121. The change in house type proposed will result in an increase in the number of dwellings within Phase 2 from 47 to 49. It is also proposed to reposition and reconfigure the public open space area identified as ‘Local Green No. 4’ within Phase 2 to the south of the permitted Link Road within phase 3 and replace attenuation tank with an over-ground detention basin within reconfigured public open space in Phase 3. The position and alignment of the permitted link road is not affected by the revisions. The reconfiguration of the public open space will result in changes to the Phase 3 layout as granted under P.A. Ref. No. 20/211 affecting permitted dwellings No’s 140 – 154 located to the south of the permitted Link Road. It is proposed to replace these dwellings and locate them to the north of the permitted Link Road. The change in house types will result in a decrease in the number of dwellings permitted within Phase 3 from 67 to 65. The proposed amendments however will not result in any change to the overall number of dwellings permitted within the overall “Hearthfield” development as permitted under PA Ref. No. 18/943 (ABP Ref. 303628-19); PA Ref. No. 20/210 and PA Ref. No. 20/211 i.e. 194. For details of proposed replacement dwellings please see full development description as contained in the Public Notices. The proposed development also provides for car parking, public open space, landscape and boundary treatments, including the construction of retaining walls, public lighting, surface water attenuation, in addition to all site development works including alterations to ground levels. *Significant Further Information received on 28/08/2024 and revised notices received on 30/08/2024 which includes revisions to the permitted link road to provide a vehicular connection to residentially zoned lands to the south; a public lighting plan and additional information in relation to roads, drainage and structural engineering matters.Decision record indexed
    Decision19 September 2024View record
  30. © OpenStreetMap
    2460050Granted

    Toor Commons Ballysallagh (Fox) Ballyhug Ballysallagh (Tuite) Ballyhoreen Kill, Balroe Cartron Grange Kildallan North Kildallan Parcellstown Slane More and Walshestown South, Co. Westmeath.

    Development which will consist/consists of: a 10-year permission for the development of a solar farm on a site of 140 hectares consisting of the following: 781,578sqm of solar photovoltaic panels on ground mounted steel frames; 17 hardstanding locations for the installation of electrical skids; new internal access tracks; underground power and communications cables and ducts, including along the L-5802, R-393, L-5913, L-1811 and the L-5808 public roads; a new access point and an upgrade to an existing access point along the R-393 public road and a new access point along the L-5808 public road; landscaping and biodiversity enhancement measures; boundary fencing; and all associated ancillary development, site works and services. The solar farm will be operational for 40 yearsDecision record indexed
    Decision10 September 2024View record
  31. © OpenStreetMap
    3679/24Granted

    Alexandra College, Richmond Avenue South, Milltown, Dublin 6, D06 KX50

    Permission for development at this site within the Alexandra College Campus (6,4317 ha.) Richmond Avenue South, Milltown, Dublin 6, D06 KX50. The campus is principally bounded by Mount Saint Annes to the north; partly by Mount Saint Annes and Milltown Road to the east, Milltown Road to the south and by Richmond Avenue south and the green line LUAS track to the west. The development will consist of the full renovation and upgrading to the existing dining hall building (509 sqm) and the construction of a new single storey extension (231 sqm) to provide additional dining hall space for the school, located on a site of c. 0133 ha within the campus. The following works area proposed: installation of new gazing and upgrading of the fabric of the existing facades and roof of the Dining Hall; provision of new toilets (20sqm), additional dining area and sundry internal reconfigurations to the kitchen and servery; replacement of existing mechanical plant and a new uncovered plant enclosure at roof level (113 sqm); adjustment of existing adjacent parking layout; wayfinding signage and external lighting hard and soft landscaping in the immediate vicinity and all associated site excavation, utilities and site development works above and below ground (foul, surface water drainage and water supply). The works also include the demolition of a link corridor (47 sqm) between the existing dining hall building dormitory/ classroom building; the extension of the entrance lobby to include fire escape doors and the installation of double doors between the dining hall and dormitory/classroom building.Decision record indexed
    Decision27 August 2024View record
  32. © OpenStreetMap
    3946/24Granted

    38/39 Ormond Quay Lower, North City, Dublin 1, D01 A593

    PROTECTED STRUCTURE: permission for the temporary signage at 38/39 Ormond Quay Lower, North City, Dublin 1, D01 A593 by way of the following: provision of temporary signage to the fascia of 38 Ormond Quay Lower, to consist of vertical painted lettering indicating the wording 'Yamamori' followed with a painted logo above the lettering. This will be lit by a wall sconce located to the base of the lettering and another sconce located to the top of the logo. Provision of temporary signage to the fascia of 39 Ormond Quay Lower in the form of a Victorian styled sign to be surface mounted onto the facade. Lime mortar to be used to backfill the screws to affix this sign. This sign will be up lit from below by a wide angle warm white wall sconce light. All works are only limited to the street side elevations of (protected structures Ref. 6071 & 6072) at Nos. 38/39 Ormond Quay Lower, North City, Dublin 1, D01 A593.Decision record indexed
    Decision23 August 2024View record
  33. © OpenStreetMap
    2460783Granted

    Rinville West, Marine Institute, Rinville Co. Galway

    For the development will consist of: Ground mounted solar panels facing south, covering a total area of approx. 520m2. The height of the panels will range from 1.5m to 3.0m at an angle of 15-30 degrees. Carport canopy solar panels mounted to a new carport canopy facing north-east and south-west with a total area of approx. 1,540m2 and a maximum height of 3.8m located over the existing car park. Cabling and all other ancillary development to connect the solar panels to the existing Marine Institute building. This application is accompanied by a Natura Impact Statement (NIS)Decision record indexed
    Decision21 August 2024View record
  34. © OpenStreetMap
    FW24A/0154Granted

    Connolly Hospital, Blanchardstown, Dublin 15, (Townland of Abbotstown)

    The proposed development includes the demolition of parts of the existing buildings (approx. 531 sq.m GFA) and associated shed on site, together with site clearance (including tree removal) and ground works to facilitate the proposed development. Other works include the making good of the southern elevation of the existing RCSI G.E.M Building and the rear (eastern) elevation of the existing HSE Academic Building that are affected by the proposed demolition works. The proposed redevelopment of the site comprises the provision of a new 4-storey Health Centre building (with a total floor area of 4,176 sq.m GFA) that includes a Dental Educational Centre (DEC) with 40 no. clinical dental chairs for patient treatment, practical work and training to be carried out by dental students in a supervised setting, at ground and first floor levels together with associated reception and waiting areas; clinical service facilities; staff facilities; toilets and changing facilities; and, plant and storage rooms. The proposed second and third floor levels will accommodate medical clinical facilities (consultation / examination rooms) and associated facilities to include waiting areas, meeting rooms / offices, toilets and changing areas, and storage rooms for existing HSE services (Rheumatology and Endocrinology) that will be relocated from within the Connolly Hospital Campus to the proposed building. Provision is made for a combination of open rooftop plant and enclosed plant rooms that are screened at rooftop level. The proposed building is located on part of the site of the permitted ERC development under FCC Reg. Ref. FW21A/0078. The proposed development includes amendments to the permitted ancillary car park, cycle parking and waste management facilities permitted under FCC Reg. Ref. FW21A/0078 to include: 1. the relocation of the 34 no. permitted car parking spaces to a new reconfigured and amalgamated surface level car park (to include lands to the front and rear of the existing HSE Academic Building) to provide a total of 44 no. car parking spaces (including 6 no. Universally Designed EV parking / charging bays) to serve both the permitted ERC development and proposed DEC development. Provision is also made for 5 no. motorcycle spaces; 2. the omission of the permitted waste management facilities Which will be accommodated within an existing waste storage facility at the northern end of the site; 3. internal and external amendments to the layout of the permitted bicycle store to provide a chemical storeroom and refuse / bin store together with the relocation of 36 no. permitted long stay cycle storage spaces and 18 no. short stay cycle storage spaces (9 no. Sheffield stands) to new bicycle storage facilities with capacity for 100 no. long stay bicycle spaces together with the provision of 100 no. short term bicycle storage spaces (50 no. Sheffield stands). Other proposed site works include site clearance and ground works, landscaping works and provision of external lighting and associated infrastructure provision to serve the car park (including underground surface water storage attenuation tank) together with the alterations to the layout to the existing waste storage compound, which includes the removal of the existing fence and gate to the waste compound area and the erection of a new gated entrance and wall enclosure to the revised waste storage compound at the northern end of the site. Provision is made for a new detached single storey plant and refuse storeroom (approximately 98 sq.m) to the north of the proposed Health Centre building. Two wall mounted, back-lit signs are proposed to the western elevation - one at ground floor level above the proposed building entrance (comprising standard RCSI logo and lettering, measuring h.670mm x 4100mm and another at third floor level (comprising standard HSE and RCSI coloured logo and lettering measuring h. 1400mm x 5400mm). AI received 18/07/24Decision record indexed
    Decision14 August 2024View record
  35. © OpenStreetMap
    D24A/0432Granted

    40, Mather Road North, Mount Merrion, Blackrock, Dublin, A94PR60

    Permission sought for the following works at 40 Mather Road North, Mount Merrion, Co. Dublin, A94 PR60, an existing detached four-bedroom two-storey single dwelling with detached converted garage now providing a home work space (i) the widening the the existing vehicular entrance (accessed from Mather Rd. North) & provision of new set-back gates, gate piers & flanking walls to the front garden; (ii) construction of a new single-storey ground floor extention with a curved profiled roof to the front (south-east) elevation; (iv) construction of a new single-storey ground floor extension to the rear (north-west) elevation, part with a flat roof & part with a pitched roof, the new rear roofs to include roof windows, both flat windows and Velux type roof windows; (v) demolition of a small single-storey ground floor flat-roofed extension to the side (south-west) elevation, and construction in its place of a new larger single-storey ground floor flat-roofed extension to the side with new garage-type double door to the front; (vi) conversion of the existing attic space into habitable accommodation including the provision of a new dormer roof structure to the rear (north-west) slope of the main roof and the provision of one new Velux type roofwindow to the front (south-east) slope of the main roof; (vii) relocation & enlargement of one first floor bedroom window to the front (south-east) elevation, enlargement of a first floor bathroom windon to the rear (north-west) elevation and the enlargement of the tall stairwell window to the side (north-east) elevation; (viii) new external doors & windows throughout; (ix) provision of brick cladding to the ground floor of the existing external side (north-east) wall and to the front of the existing detached home work space / converted former garage; (x) demoliton of an existing garden wall connecting the main house to the detached home work space / converted former garage and the formation of a new such wall in a slightly altered location with new gate to maintain side access through to the rear garden (xi) other internal alterations & all siteworks, services & landscaping to facilitate the proposed development. All at 40 Mather Road North, Mount Merrion, Co. Dublin, A94 PR60, a site at the junction of Mather Road North & Callary Road.Decision record indexed
    Decision07 August 2024View record
  36. © OpenStreetMap
    D24A/0410/WEBGranted

    22, Mather Road North, Mount Merrion, Blackrock, Co.Dublin, A94Y528

    The development for permission will consist of:• Construction of new dormer to rear of the main house roof to facilitate a habitable attic conversion with a bedroom and a shower room;• Change of roof from hipped to gabled with extended gable wall and rooflight to rear slope;• Alteration / enlargement of existing landing window on side gable wall;• All associated demolitions / alterations, internal layout changes, drainage and ancillary works.The development for retention permission consists of:• Retention of existing widened vehicular entrance / piers to front;Decision record indexed
    Decision31 July 2024View record
  37. © OpenStreetMap
    D23A/0489Refused

    Tara, 44 Foster Avenue A94EV20, 44A, Kildara, Foster Avenue, Mount Merrion, Blackrock, Dublin, A94W963

    A corner site with frontage to North Avenue. (i) Demolition of existing 2 no. two-storey semi-detached dwellings and shed building, (ii) Construction of 1 no. four-storey over basement residential building comprising 24 no. apartments (9 no. one-bed units and 15 no. two-bed units) access to the development will be provided from Foster Avenue to the northwest and North Avenue to the east. (iii) Provision of 19 no. car parking spaces, 40 no. bicycle spaces, bin storage and plant room and (iv) Provision of landscaping works inclusive of public seating, boundary treatment, SuDS drainage and all ancillary works necessary to facilitate the development.Grounds not yet categorised
    Decision23 July 2024View record
  38. © OpenStreetMap
    24177Granted

    Intel Ireland Limited, Collinstown Industrial Park, Leixlip

    For additions, replacements and modifications to existing industrial facilities located at Collinstown, Leixlip, Blakestown, Kellystown, Collinstown Industrial Park, Leixlip, Co. Kildare. The proposed development consisting of additions and modifications to the previously permitted (KCC Reg. Ref. 19/1054) and partially completed development, which incorporates a new Utility Building. The proposed development also includes other buildings, plant and equipment to be located North of Fab 10 and Fab 24. The proposed development is comprised of the following: (1) A Utility Building sized approximately 561 square metres approximately 10 metres high, housing plant and equipment and also including adjacent yard-based plant and equipment, consisting of a 16-metre-high storage tank approximately 3 metres in diameter, housing for electrical controls and external pipework. Also including a 4-metre-high acoustic screen, additional pipe bridges, all located north of Fab 10. (2) An elevated single-storey extension to the existing electrical building located north-west of Fab 10 sized 60 square metres approximately and 8.5 metres high approximately and a local connecting pipe bridge. (3) A building ancillary to the Fab 10 Reverse Osmosis Deionised Water (RODI) building located north of Fab 10 sized 75 square metres approximately and 7.9 metres high approximately including an Air Handling Unit, approximately 3.1 metre high located on the roof. (4) 2 no. tanks, each sized approximately 20.4 metres high and approximately 4.6 metres in diameter. 1no. located in the yard to the north of Fab 10 and 1no. located in the yard north of Fab 24. (5) The proposed development also includes minor modifications to site works, access road, underground surface water retention features, additional underground utilities, site lighting, pipe bridges, roof mounted equipment and internal roadworks. The application relates to a modification to a development which comprises or is for the purpose of an activity requiring an industrial emissions license under Part IV of the Environmental Protection Agency Act 1992 (as amended by the Protection of the Environment Act, 2003) is required. This application relates to development consisting of the modifications to an establishment within the meaning of the Major Accidents Directive (i.e. a COMAH / Seveso site).Decision record indexed
    Decision17 July 2024View record
  39. © OpenStreetMap
    DZ24A/0366/WEBGranted

    Building 8, Cherrywood Business Park, Dublin 18, D18W319

    The development will consist of tenant signage and fascia detailing at the main entrance (south western elevation); a high level building mounted sign (north western elevation) and a freestanding totem wayfinding sign between Building 8 and Cherrywood Avenue.Decision record indexed
    Decision17 July 2024View record
  40. © OpenStreetMap
    23/6197Granted

    Greenfield site to the east of the Mount Alvernia Hospital, Newberry Kilvealaton East Mallow, Co. Cork

    Estates Office of the Health Service Executive (HSE) South wish to apply for planning permission on a greenfield site to the east of the Mount Alvernia Hospital. Newberry, Kilvealton east, Mallow P51XT95 ( Part of which is a Protected Structure), the construction of a single storey, detached, 472 square metre, pitched roofed Ambulance Base with a 9.3sqm detached store with attached services enclosed and ground-mounted photo-voltaic panel array on a 6,434 square metre site with associated siteworks including a new vehicle and pedestrian entrance with selected stone cladded piers accessed off the R619 road, new 2.5m high selected metal fencing on dwarf wall along the south facing boundary with 1.8m selected metal fencing along the north, east and west facing boundaries.Decision record indexed
    Decision10 July 2024View record
  41. © OpenStreetMap
    FW24A/0180EGranted

    Denis Mahony Motor Group, North Road, Dublin 11, D11 T950

    Consisting of works to the existing motor sales and service facility including the following: 1) the replacement of 8 no. existing Toyota Signs with New Signs (6 building mounted sings & 2 free standing signs) 2) the installation of 9 no. new Sings (2 building mounted & 7 free standing site signs) 3) All associated site and development works. AI Rcvd 19/06/2024Decision record indexed
    Decision09 July 2024View record
  42. © OpenStreetMap
    2460162Granted

    Castleblayney College, Dublin Road Connabury T.D., Castleblayney Co. Monaghan

    Permission for a development consisting of:(1)Construction of a two-storey extension to the Southeast of the existing school consisting of a 3-classroom SEN base, associated toilets, Central Activities Area, 2 No. Replacement Classrooms and all ancillary spaces. Together with an external play area and sensory garden adjacent to the extension. PV panels will be mounted on the roof of the proposed building. (2) Alterations within the existing school provides a Safe Base Classroom and forms an internal link to the proposed SEN extension at ground and first floor levels. (3) Internal alterations within the rooms at the North and South of the existing entrance doors on the Western façade of the building to provide an entrance at this location. (4) Extension to the existing carpark at the west of the school and provision of a further carparking area to the East of the school to replace parking spaces being lost due to the extension location. Provide an additional 9 parking spaces for the new extension. (5) Alterations to the existing traffic flow in the site to provide for 2-way traffic throughout. (6) Provision of EV charging points (7) All necessary siteworks associated with the above.Decision record indexed
    Decision27 June 2024View record
  43. © OpenStreetMap
    3643/24Granted

    12, 29 and 30 Fitzwilliam Street Lower and 62 Mount Street Upper Dublin 2

    PROTECTED STRUCTURE. ESB Commercial Properties Ltd. intends to apply for planning permission for development at a site of 0.07 Ha, at No. 12 Fitzwilliam Street Lower and at No.s 29 and 30 Fitzwilliam Street Lower, and No.62 Mount Street Upper Dublin 2, all Protected Structures. Development parcels are located to the immediate north and south of No.28 Fitzwilliam Street Lower and No. 27 Fitzwilliam Street Lower respectively (No. 27 Fitzwilliam Street Lower being the ESB Headquarters Building). The proposed development will consist of: A) a change of use from residential use to museum use at No. 12 Fitzwilliam Street Lower, new 4 storey extension with internal lift to the rear (at lower ground to 2nd floor levels) including alterations to existing 4 storey return. The proposed development at No. 12 Fitzwilliam Street Upper also consists of the following works: 1.Works to front basement cellars for the provision of plant and storage rooms; 2. Replacement of external stair and provision of platform lift to front lightwell; 3. Alterations to existing gate, front railings and stone plinth at street level; 4. Refurbishment of front railings and stone plinth enclosure, balconettes and front steps; 5. Removal of existing wall enclosure beneath front steps at lower ground level; 6. Provision of signage, lighting, intercom and CCTV cameras, at front entrance onto Fitzwilliam Street Lower; 7. Renewal works to front façade to include render renewal; cleaning, repair and full repointing to brickwork; renewal of feathered reveals; and cleaning and renewal of stone embellishments; 8.Renewal work to rear façades to include alterations of openings, cleaning, pointing and render renewal; renewal of feathered window reveals, and, repairs to brickwork and stone embellishments; 9.Provision of new openings to rear façades;10. Enabling alterations to rear façade fenestration including formation of openings for new extension; 11. Enabling alterations to interior of existing return for new extension; 12. Conservation, alteration and restoration works to interiors, including reinstatement of joinery, conservation of plasterwork, provision of new doors, provisions of services, fire upgrade works, renewal of finishes and decoration; 13. Replacement of internal stair between ground and lower ground; 14. Replacement of existing floor at lower ground level and provision of new ramp to rear return and new extension; 15. Reconfiguration of internal layouts including removal of later subdivision; 16. Refurbishment of historic windows and replacement of later windows, upgrade works to include provision of narrow cavity glazing; 17. Provision of 2 No. rooflights with narrow cavity glazing; 18. Repairs to roof and rainwater goods; 19. Landscape works to rear including the provision of new boundary enclosure and all ancillary services and site works; 20. Provision of new mechanical plant in rear external area; and 21. Installation of 2 No. fire rated screens. B) a change of use from museum use at No. 29 Fitzwilliam Lower and lower ground level of No. 30 Fitzwilliam Street Lower and No. 62 Mount Street Upper to provide residential use to provide 3 residential units consisting of: 1 No. 2 bed unit at lower ground floor level (c.114 sqm GFA) with private garden to rear at lower ground floor level; 1No 2 bed duplex unit at lower ground and ground floor level (c. 122 sqm GFA) with private garden to rear at lower ground floor level; and 1No. 3 bed triplex unit at ground to 3rd floor levels (c. 248 sqm GFA) with private balcony to rear at first floor level. The Proposed development at No.s 29 and 30 Fitzwilliam street lower and No, 62 Mount Street Upper consists of the following works: 1.Modifications to external gate in front railings and alterations to the existing external stairs providing access to lower ground level from Mount Street Upper: 2. Provision of post boxes/keypad integrated into railings; 3. Demolition of walls in front external lightwell area and provision of new gate and railing; 4. Works to external cellars to provide storage and plant rooms; 5.New windows and door openings at lower ground levels; 6 Alterations to existing window and door openings at lower ground and rear first floor levels; 7 Renewal of windows to front façade upgrade works to include provision of narrow cavity glazing; 8 Alteration to windows to provide door access to new first floor balcony to the rear of No. 29 at first floor level; 9.Reconfiguration of internal layouts including provision of new internal stairway connecting lower ground and ground levels of No 29 Fitzwilliam Street Lower within the proposed duplex; 10. Removal of existing stairway connecting lower ground and ground level of No. 29 Fitzwilliam Street Lower; 11.Closing up of door opening between ground floor hallway to front room of No. 29 Fitzwilliam Street Lower; 12. Restoration work to interiors including new joinery, provisions of services, fire upgrade works, renewal of finishes and decoration to interiors; 13. Replacement of internal plasterwork with lime-based insulated plaster for improved thermal performance: 14. Provision of new mechanical plant within acoustic enclosure in rear external area of No. 30 Fitzwilliam Street Lower; 15. Landscape works to rear including the provision of new boundary enclosure and all ancillary services and site works.Decision record indexed
    Decision27 June 2024View record
  44. © OpenStreetMap
    24/4779Granted

    Midleton Distillery Park North Midleton co.Cork

    Permission for the demolition of 2 no. existing decommissioned industrial chimney stacks, comprising a boiler chimney (approximate height 46 metres) and a feeds recovery dryer stack (approximate height 41 metres), which is mounted to the roof of an existing feeds recovery building, and all ancillary site development works. The proposed development is for modifications to an establishment to which the Major Accident Directive applies and is for the purpose of activity requiring an Integrated Pollution Control Licence [Industrial Emissions Directive (IED) licence]Decision record indexed
    Decision25 June 2024View record
  45. © OpenStreetMap
    2466Granted

    Monksland, Athlone, Co Roscommon

    Permission for development consisting of the replacement of 5 no. existing signs, comprising 3 no. non-illuminated high level wall mounted signs on the south, east and north facades of existing Building 15, 1 no. illuminated vertical banner sign located a the main entrance off R362 to the north of the site, and 1 no. illuminated vertical banner sign located on the verge of the estate road to the rear entrance to the west of the site atDecision record indexed
    Decision18 June 2024View record
  46. © OpenStreetMap
    D24A/0265Granted

    Nutgrove Community Enterprise Centre, Nutgrove Way, Rathfarnham, Dublin 14.

    Permission for: The development will consist of the removal of exterior signage on the southern elevation of the existing community enterprise centre and replacement with new exterior signage; the replacement of the existing totem near the main entrance gates with a digital signage totem; and the replacement of external signage granted under planning register reference no. D23A/0604 for the southern elevation of the proposed new building with new signage to match that proposed for the existing building.8 conditions indexed
    Decision11 June 2024View record
  47. © OpenStreetMap
    23424Granted

    Bennetstown, Pace, Dunboyne Co. Meath

    The development will consist of: i. Construction of 3 no. office buildings with a cumulative gross floor area (GFA) of 13,729 sq.m ranging in height from 3 to 4- storeys and shall comprise the following: a. Building 1 (3,597 sq.m GFA) 3-storeys in height (12.35 metres to top of parapet), with a set back louvred screen 2m above parapet level. b. Building 2 (5,336 sq.m GFA) 4-storeys in height (16.125 metres to top of parapet), with a set back louvred screen 2m above parapet level. c. Building 3 (4,796 sq.m GFA) 4-storeys in height (16.125 metres to top of parapet), with a set back louvred screen 2m above parapet level. ii. Roof mounted solar PV panels (c. 180 sq.m combined area); iii. Provision of a 4-arm signalised junction replacing the existing Pace roundabout to include a new northern arm with segregated cycleway and footpath; iv. Access to the development is proposed from the new northern arm, with 6m wide internal access roads to serve the development; v. Upgrade works to the R157 and M3 Parkway access road to facilitate junction improvements; vi. A total of 275 surface car parking spaces including 14 disabled access bays and 55 electric car charging points; vii. 280 bicycle parking spaces in 3 secure cycle storage areas adjacent to the buildings; viii. Site signage is to be erected, all spot-lit and back-lit illuminated, including 2 no. type 1 entrance signs (6.15m x 2.4m) and 3 no. type 2 building signs (1.35m x 2.4m); ix. 3 standalone electricity substations; x. Foul sewer connection to existing public system including pumping station on site with rising mains along Kennedy Road and Navan Road; xi. Watermain connection to the north east of site at Pace for connection to Irish Water Infrastructure; xii. Permission is also sought for associated landscaping, boundary treatments, public lighting, plant, waste storage and all ancillary site and development works. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development. Signficant further information/revised plans submitted on this applicationDecision record indexed
    Decision07 June 2024View record
  48. © OpenStreetMap
    D24A/0008Granted

    Lands to the rear of 38 & 38A Greenfield road (formerly side and rear of A94W2R6) and 44A North Avenue A94V9W3, Mount Merrion, Blackrock, Co Dublin

    Demolition of the existing shed at 44A North Avenue (72.8sqm) and the development of three houses on the 0.1 hectare site (GFA 684 sqm) as follows: One ground floor over basement (two double bedrooms) dwelling with green roof on the site of 44A North Avenue, private amenity space to the side of the dwelling and one car parking space. A pair of semi detached two storey plus dormer dwellings (four double bedroom and study/home office) on the site to the rear of no.38 and no.38A Greenfield Road, each with private amenity space to the rear of the dwellings and two car parking spaces per house. All associated site development works including a new access road from North Avenue parallel to the existing row, boundary fencing, foul and surface water drainage, bicycle and bin storage and associated landscaping.Decision record indexed
    Decision21 May 2024View record
  49. © OpenStreetMap
    2360421Granted

    St. Michael's NS, Water Street Townparks, Castlepollard Co. Westmeath

    Development which will consist of an extension to the existing school as follows: (1) Construction of a single storey extension to the North of the existing school consisting of a 2-classroom SEN base, associated toilets, Central Activities Area and ancillary spaces. A further single storey extension at the West of the existing school consists of 2 SET Rooms and Assisted Changing Room. The works include the installation of roof mounted PV Panels. (2) Alterations within the existing school to form an internal link to the proposed SEN extension and connection to the GP Hall. (3) Provision of parking spaces and set-down within the school site, with the construction of new one-way traffic system with access and exit points for vehicles onto Water Street. (4) The provision of an EV (Electric Vehicle) charging point. (5) The removal of a play shelter and a storage container from the site. (6) All siteworks associated with the aboveDecision record indexed
    Decision20 May 2024View record
  50. © OpenStreetMap
    WEB1346/24Granted

    On the grass verge adjacent to Lidl, on the eastern side of North Road (N2) Finglas, Dublin 11

    The retention of the existing scrolling internally illuminated double sided 'Metropole' advertising display case mounted on an offset leg.Decision record indexed
    Decision16 May 2024View record
Showing 51-100 of 311
Page 2 of 7