Clonmill Limited are applying for Permission, for the proposed amalgamation of shop units 19 and 20, at The Mill Shopping Centre Clondalkin, Ninth Lock Road, Clondalkin, Dublin 22. The proposed development will consist of the amalgamation of the existing retail Unit 19 (c. 78 sq.m) and existing retail Unit 20 (c. 74 sq.m) into a single retail unit 19/20 c. 155 sq.m through the removal of the existing wall between the two units. The existing entrance to Unit 20 is to be closed with a partition wall and the shop front glazing to be removed and replaced with a glazing unit to match height to Unit 19. Including all associated site services and development works.
The development comprises the retention of the following amendments to the development permitted under Reg. Ref.: SD20A/0309, as amended by Reg. Ref.: SD22A/0093 and Reg. Ref.: SD23A/0158, which arose during the detailed design / construction stage of the project: Amendments at plant and roof level including the reconfiguration of plant and associated extracts, provision of a roof level package plantroom, provision of 2 no. backup landlord generators, reconfigured gantry associated with the 2 no. back-up landlord generators, and reconfiguration of solar PV panels; The provision of 2 no. pumproom buildings to accommodate process water and fire water with a gross floor area (GFA) of c. 44 sq.m and c. 105 sq.m; The provision of underground water process tanks located to the south of ICT Facility 1; The provision of a wastewater treatment skid located to the west of ICT Facility 1; Reconfiguration of car parking spaces resulting in an overall reduction of 1 no. car parking spaces from 44 no. car parking spaces to 43 no. car parking spaces; Relocation of permitted cycle parking from the north of ICT Facility 1 to the south of ICT Facility 1; Amendments to fenestration and arrangement of façade treatment to ICT Facility 1 and minor reconfiguration of the internal layout; and All associated and ancillary works. An EPA-Industrial Emissions Directive (IE) licence is required to facilitate the operation of the development.
Revision to existing permission (SD24B/0194) to include enlargement of single storey extension to rear with internal modifications and associated site works.
Planning permission for attic conversion to non-habitable storage space with metal clad dormer and Velux to rear roof. Permission to alter roof profile from hip roof to gable roof. Relocation of existing window on side gable. Proposed single storey extension to existing extension to rear with all associated ancillary works. at 16 St Patricks Road, Ballymanaggin Dublin 22
Retention Planning Permission for detached single storey gym/shed & outdoor canopy seating area to rear garden with associated ancillary works.
Partial demolition of existing outhouse to side to accommodate construction of ground floor kitchen/living room extension to side of existing dwelling, and associated site works.
Proposed ground floor only porch to the front of the existing house and replacing the garage door with a new window, converting the existing garage into habitable space with new roof design. Demolishing of existing ground floor extension to the rear of the existing house and replacing with new ground floor only extension. A new dormer roof to the rear of the existing house roof and a new Velux to the front of the existing house and all ancillary works.
Planning Permission for (1) Construction of a two storey pitched roof side extension to the existing dwelling (2) Construction of a single storey flat roof rear extension to the existing dwelling and extending for the width of the two storey extension. (3) Works to the existing house (a) Internal alterations at ground and first floor level to facilitate the new extension (b) Alterations to existing ground floor window on the front elevation (4) Increased width vehicular entrance of the public road and (5) All necessary ancillary site development works to facilitate this development
Retention of erection of new electronic of 8 x 5.5ft sign which replaces existing 9 x 6ft wooden sign inside the boundary wall on Orchard Road side of the site, in the curtilage of Áras Chrónáin (Protected Structure).
Gabor Construction Limited are applying for Permission for partial change of use as constructed under Reg. Ref. S99A/0146, from Warehouse to Office use (29sqm) to include for internal alterations and extension of current office floor areas on ground and first floor level.
1) External insulation to front and gable with smooth render finish. 2) Porch overhang to front. 3) Removal of window to front to incorporate increased entrance size and reduced window size to front. 4) Increased dormer size and modified design with parapet to gable end to rear. 5) All associated site works and drainage connections.
Retention for the construction of a garden structure circa 26sqm for home office and gym use.
New dormer type window extension to side elevation for existing bedroom, new metal clad canopy over existing bay window and entrance door to replace existing tiled canopy, with internal modifications and associated site works.
New Ground Floor Extension to front with new metal clad canopy over existing porch and new extension with internal modifications and associated site works
The construction of a concrete block boundary wall to north boundary of the front garden.
Amendments to previous grant of permission SD14A/0157. Change of use of part first floor plan to create 2 addtional bedrooms, alterations and refurbishment of existing nursing home and all associated site works.
Demolition of existing garage and construction of new 2 storey side extension; demolition of rear conservatory and construction of new canopy; construction of new dormer structure to rear; construction of 2 new dormer windows to front elevation; internal alterations to floor layouts; construction of new front porch canopy and all associated site works.
1) demolition of detached domestic garage to rear, 2) construction of a 2-storey detached dwelling to rear with new vehicular access and new pedestrian access, 3) modification to existing house rear garden perimeter including relocation of garden wall, 4) all related works.
We, Alucraft Ltd, make application to South Dublin County Council for permission. FOR RETENTION of development at this site address: Unit AF4O, Cloverhill Industrial Estate, Clondalkin, Dublin, D22 HY51, for alterations to permitted development under Reg. Ret: 91A/1082, 90A/734, 89A/50, 85A/505, T.A.562., R.A. 1123 and R.A. 1098, comprising of the following: 1. 1 No. 3-sided bike shelter with polycarbonate roof and wall sheets measuring 16.5 sq.m GFA to front of building, 2. 1 No. 3.83M High prefabricated structure comprising of additional office space measuring 76.8 sq.m GEA to front of building, 3. 1 No. 7.61M High, permanent storage enclosure with loading bay measuring 178.42 sq.m GEA to rear of building, 4. 1 No. 2.74M high prefabricated structure comprising of additional WC provision measuring 18.11 sq.m GFA to rear of building connected to existing foul sewer, 5. 1 No. 2.74M high prefabricated structure comprising of additional WC provision measuring 13.47 sq.m GFA to rear of building connected to existing foul sewer, 6. 1 No. 6.54M high permanent loading platform enclosure, measuring 100.95 sq.m GEA to rear of building, 7. 1 No. 3.31M (H) glazed curtain wall entrance porch/lobby to main reception measuring 9.11 sq.m GFA to front of building, 8. 1 No. 2.87M (H) glazed curtain wall entrance porch/lobby to main reception measuring 6.63 sq.m GFAto front of building, and all associated ancillary site works on an overall site area of 2.23 hectares.
Amalgamation of units F2 and F3 (with connecting doors at ground and first floor levels) and its use for warehouse and distribution with ancillary trade counter and showroom at ground and first floor levels; Retention of offices at second floor level which are ancillary to the overall warehouse operation; Retention of all signage and external illumination of the signage.
Conversion of attic to storage including changing existing hipped end roof to a gable end roof; dormer window to the rear and a window to the new side gable wall, all at roof level.
Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs, flat roof dormer to the rear and 2no. roof windows to the front.
Erection of a first floor bedroom extension above the existing garage; raise section of the tiled roof to match the existing roof; front of the extension will have a dormer type roof with two windows to the front; convert the existing garage to a study and relocate the front door.
Permission is sought for construction of a single storey Extension to the rear and a bedroom extension at first floor level to the side of existing house; alterations to elevations and internal layout: 2 no. roof lights and all associated site development works at 22 Monastery Crescent Clondalkin Dublin 22
Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs, 2no. roof windows to the front and flat roof dormer to the rear
Construction of new second floor extension to the side of existing dwelling comprising of 2 bedrooms and bathroom and single storey extension to the rear comprising of family room, kitchen and dining room.
Construction of new single storey extension to the rear of existing dwelling and all assocciated works.
First floor extension to front elevation and ground floor extension to rear elevation and all associated site works.
Retention Permission for several items further to the construction of the development as granted planning under South Dublin County Council Reg. Ref. SD24A/0015 for an extension, refurbishment, and alterations to adjoined warehousing Units 1, 2 & 3 Cloverhill Industrial Estate, Clondalkin, Dublin 22. The items for which Retention Permission is sought are as follows: 1.Alterations at Unit 1, resulting in a total area of 10,153m2 (10,120m2 of warehouse area, and 33m2 of Staff Facilities Area) as follows: A.Omission of previously proposed subdivision of Unit 1 in two units (Unit 1A and Unit 1B), with no area change. B.Change of use of 276m2 of Ancillary Office Area and 236m2 of Staff Facilities Area to Warehouse Area (at Ground Floor) and removal of 545m2 of Ancillary Office and Staff Facilities Area (at First Floor) due to the omission of previously proposed 2 storey Ancillary Office for Unit 1A and Unit 1B and redesign of existing Plant Room area at North-western corner of Unit 1 to accommodate warehouse toilet block and IT room. 2.Alterations at Unit 3: change of use of 3m2 of Staff Facilities Area to Ancillary Office Area and 39m2 of Ancillary Office Area to Warehouse Area (at Ground Floor) and 3m2 of Ancillary Office Area to Staff Facilities Area (at First Floor), resulting in 5,182m2 (4,824m2 of warehouse area, 221m2 of Ancillary Office Area and 137m2 of Staff Facilities Area) due to the structural design arrangements at the Ancillary Office and demolition of 2No. existing warehouse offices. 3.Previously proposed existing internal roller door to be built up, now retained to provide a connection between Unit 1 and Unit 3. 4. Elevational changes, with no floor area changes, due to the above mentioned modifications, including: A.Addition of 3No. fire escape concrete steps and refugee area at Unit 1. B.Omission of 2No. personal doors at Unit 1. C.Relocation of 1No. level entry door at Unit 1 and, D.Omission of 1 dock leveller door due to the retention of existing level door and personnel door at Unit 3. 5.Associated site works including: A.Existing ancillary area at front elevation of Unit 1 is retained unaltered. B.Previously proposed HGV access at front elevation of Unit 1 now omitted due to the omission of the subdivision on Unit 1, HGV access is now at South-eastern corner of the site. C.Addition of fence and swinging gate for fire escape circulation at South-western corner of Unit 1 and omission of fire tender swinging gate at the rear of the site, between Unit 1 and Unit 3. D.Site works adjustments due to elevational changes. All other elements remain as per granted planning application Reg. Ref. SD24A/0015.
Extension, refurbishment, and alterations to adjoined warehousing Units 1, 2 & 3 Cloverhill Industrial Estate, Clondalkin, Dublin 22 as follows: 1. The existing warehousing Unit 1 (existing total area 11,725m2, comprised of 8,526m2 warehouse area and 3,199m2 of two storey ancillary offices) is proposed to be subdivided into two units as follows: A. Unit 1A, 2,582m2 in total including redesigned ancillary offices on 2 floors with an overall area of 522m2 (note: existing two storey office will be reduced by the demolition of 259m2 first floor offices and change of use of part of ground floor office, 281m2, to warehousing space), with a resulting warehouse area of 2,060m2. B. Unit 1B, 8,116m2 in total including redesigned ancillary offices on 2 floors with an overall area of 568m2 (note: existing two storey office will be reduced by demolition of 768m2 first floor offices and change of use of part of ground floor office, 801m2, to warehousing space) with a resulting warehouse area of 7,548m2. Both of the above units to receive front/southern elevation upgrades and access improvements of HGV's entering the site through two improved existing entrance/exit locations, addition of 1 no. goods door to Unit 1A, addition of 4 no. dock leveller doors & 1 no. goods door to Unit 1B, removal of a disused sprinkler pumphouse/plant room & (167m2) and sprinkler tank (24m2, 7m high) to the rear of Unit 1B, associated elevational changes, drainage works including surface water swales, landscaping, rearranged car parking, provision of cycle parking and associated site development works. 2. Existing Unit 2 building area remains unaltered. 3. Existing Unit 3 with a total area of 4,995m2, proposed alterations will include existing warehouse office area (90sqm total over 3 locations) to be reduced to 42sqm by the demolition of 24m2 of first floor office and the change of use of 24sqm of part of ground floor office area to the warehousing area, and separately demolition of 147sqm of adjoined warehouse corridor resulting in 4,782m2 of warehouse area with the addition of a proposed new two storey adjoined ancillary office area extension of 358m2, with associated elevation works, ancillary cycle parking and adjusted car parking, addition of 2no. dock leveller doors & 1 no. goods door to the side/eastern elevation plus associated drainage works including surface water swales, landscaping and associated site development works.
The Erection of a first Floor, 2 Bedroom Extension to the rear
The development seeking permission will consist of widening the existing vehicular entrance to 3.5m wide.
A new single storey front, side and rear extension with roof windows comprising of a den, utility room, living area, WC and kitchen. Convert attic to bedroom with new roof windows to front & rear of existing roof and all associated site works.
Single storey outbuilding in the rear garden, which is a revision to the garage previously granted under An Bord Pleanala Ref. No. PL06S.247883 and all ancillary site works.
Demolition of existing two storey and single storey enterprise and retail buildings on site including a car repair and maintenance garage, hair and beauty salon, grocery store, pet store and sports facility; 2 first floor level apartments; construction of a mixed use development comprising of 1 five storey and 1 six storey apartment block comprising 86 apartments (48 two bedroom and 38 1 bedroom; 4 commercial units at ground floor level in Block A (525sq.m); 96 bicycle parking spaces (88 basement level and 8 surface level); 81 car parking spaces and 5 motorcycle parking spaces at basement level; all engineering, landscaping, lighting and site works necessary to facilitate the development; each apartment will be served by communal landscaped open space at surface level (1600sq.m) and private amenity space in the form of a balcony; vehicular access will be provided to the basement car park from Watery Lane.
Modifications to previously approved application granted by An Board Pleanála, grant reference ABP-309646-21, at the site of Clondalkin Enterprise Centre. The proposal consists of two additional one bed apartments on the second floor of Block B east side of the site. Apartment 1. (67.5 sq.m) is located on the north side of Block B and apartment 2. (45 sq.m) is located on the south side of Block B. the gross sq.m of the proposed works is 112.5 sq.m
Retention consists of a detached single-storey ESB substation with switch room & associated site landscaping & drainage works. Location the northeast corner of site.
Remove a condition from a previously granted permission on their premises at Clondalkin Enterprise Centre, Watery Lane, Clondalkin, Dublin 22. The application (local authority Reg Ref SD20A/0234) was to demolish the existing buildings on site and to construct 86 apartments (48 two bedroom and 39 one bedroom units) in a five storey and six storey block with four commercial units at ground floor. Following a Third Party Appeal, (Ref AB-309646-21) against the South Dublin decision to grant permission, An Bord Pleanala, granted permission on 16th November 2021 This permission contained a condition 12 relating to the provision of Part V housing but in addition contained a condition 21 that stated, 'prior to the commencement of the development as permitted, the applicant or any person with an interest in the land shall enter into an agreement with the planning authority (such agreement must specify the number and location of each residential unit), pursuant to section 47 of the Planning and Development Act 2000, that restricts all residential units permitted to first occupation by individual purchasers i.e. those not being a corporate entity and/or by those eligible for the occupation of social and/or affordable housing including cost rental house'. The reason given was to restrict new housing development to use by persons of a particular class or description in order to ensure an adequate choice and supply of housing including affordable housing in the common good. Permission is now sought to remove entirely this additional condition 21 from the final grant of planning permission as issued by An Bord Pleanala.
(i) A change of use from existing residential dwelling to guest house, and (ii) the provision of 1 no. accessible bathroom at ground floor level. The development includes drainage, landscaping, boundary treatments and all ancillary works needed to facilitate the development.
The development will consist of a) Demolition of side boundary wall, b) Construction of new two storey dwelling to the side of existing adjoining dwelling, c) Associated site works including construction of new boundary wall and new pedestrian access to rear, d) Widened dished pavement for vehicular access.
Permission to (a) construct extension to front of existing building & (b) convert existing Laundry room to bedroom with en-suite associated with Guest House / B&B.
(i) a change of use from existing residential dwelling to guest house, (H) the provision of 1 no. accessible bathroom at ground floor level, (Hi) changes to the external elevations inclusive of the widening and lowering of existing door ope to 0.8m on the south elevation, widening of gate into courtyard to (from O.8m to 1m wide) and subdivision of an existing window opening on the north elevation of the building, (iv) internal layout revisions including the omission of existing partition walls/doors at ground and first floor levels and provision of new partition walls to facilitate new internal layouts, and (v) provision of 1 no. accessible car parking bay. The development includes all ancillary site works, inclusive of boundary treatments, landscaping and SuDS drainage, necessary to facilitate the development, at Towerville, Tower Road, Dublin 22, D22 XTS1 (a protected structure: RPS Ref: 419).
1. Conversion of garage to side, 2. New ground floor extension to front, 3. Re-Configuration of entrance door 4. new 1st floor extension to side 5. revised rood profile 6. Internal modifications to dwelling layout, 7. Associated site works
Demolition of the existing side extension 34sq.m; New side/rear extension to be built (rear extension to be two-storey), total new extension 72sq.m.
Parking area to the front with dropped kerb for access; new folding wrought iron gates in keeping with the existing.
Erect an end of terrace two storey dwelling to the side of the existing dwelling and connect to existing services along with a new vehicular entrance to the front and new pedestrian access to the rear to serve the existing dwelling and widen the existing vehicular entrance to serve the new dwelling along with all associated site development works.
(i) provision of a single-story extension (2.4m x 8.92m) to the front of the structure; (ii) internal works as follows: (a) plastering of internal walls with insulated lime plaster, (b) build-up of existing front window opes internally only on 1st floor level (maintaining window slats), and (c) internal layout revisions including the omission of existing partition walls/doors and provision of new partition walls at ground and first floor levels; (iii) restoration of roof slates with replacement where required. (iv) change of use of the structure from an ancillary storage building to guesthouse use to provide for 2 no. additional guesthouse suites, each inclusive of 1 no. bedroom, 1 no. living area and 1 no. bathroom; (v) The development includes all ancillary site works, inclusive of landscaping, tree-removal and drainage, necessary to facilitate the development. The proposed guesthouse will form part of the existing guesthouse use within Towerville and will result in a total of 9 no. guesthouse bedrooms provided on site. The subject building is within the curtilage of Towerville, a protected structure.
Construction of a new two storey house adjacent to the existing house; a new driveway to the front; new garden access gates to the side and all associated site works.
Retention Permission for conversion of the existing garage to habitable space, A side extension at first floor level with double-pitched roof continuing the existing main roof profile and a front dormer window similar to the existing front dormer window. Permission for removal of the existing chimney, A front extension at first floor level with double-pitched roof. A flat-roofed ground floor level extension to the rear and a flat-roofed dormer extension to the rear.
The development will consist of ground and first floor rear extensions with flat roofs and roof lights including windows to the side and rear at first floor, new roof to the existing single storey side extension, alterations to the front, side and rear elevations, internal alterations, demolition of existing chimney stack and all associated site works.