The development will consist of an extension to an existing stable / garage and to change the use to a home office
For the construction of detached two storey dwelling house, onsite wastewater treatment system and percolation area, new entrance, connection to necessary services, together with all associated ancillary and incidental site works
To construct a house, garage and associated site works
Of the extension to the side of the existing dwelling and the shed to the rear of the dwelling & all other associated site works
To renovate, alter and extend an existing dwelling house, to covert an attached garage into living accommodation, to construct a new private garage and to demolish an existing garden shed along with all ancillary works
For development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
For the construction of a new dwelling house and garage complete with a new entrance, wastewater treatment system, a bored well and ancillary works
For development which will consist of the construction of a dwelling house, garage, a septic tank with percolation area and ancillary site works
For development which will consist of a 10-year permission for a Synchronous Condenser and Battery Energy Storage System (BESS) across a site of approximately 2.97 hectares, co-located with an existing solar farm. The development will have an operational capacity of c. 50 MW and will consist of the construction of battery energy storage system units, power conversion units, a synchronous condenser, control modules and rooms, transformers and bunds, cooling equipment, a generator circuit breaker, an emergency diesel generator with associated fuel tank, water tank, underground cabling, fencing with access gates, CCTV and lighting posts, a temporary construction compound, new and upgraded access tracks, and associated landscaping, and ancillary works. The development would be in operation for up to 30 years. A Natura Impact Statement (NIS) has been submitted with this application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
For development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary works
Of the converted garage for domestic use, the connecting porch area, the altered fenestration, internal layout and all associated and ancillary site works
For the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
To demolish existing sunroom to side of existing dwelling, make changes to the layout and elevations of the dwelling, construct extensions to sides and porch to front of the dwelling, use part of the dwelling as a granny flat, and extend the existing percolation, all with associated site works
For the construction of a dwellinghouse, New Entrance, and Proprietary Wastewater Treatment System including ancillary site works
To construct an extension to the existing dwelling house along with ancillary site works
To (A) alter, extend and renovate existing dwelling house. (B) demolish existing rear sunroom annex. (C) RETAIN existing domestic garden shed including all associated site works & services
For development at this site in the townlands of Ballyvonnavaum TD, Coolshamroge TD, Cloonmore TD, Deerpark TD, and Manusmore TD, Ennis, Co Clare. The development will consist of planning permission for a period of 10 years to construct and complete a Solar PV Energy development with a total site area of 27.34 hectares, to include inverter station modules, solar PV panels ground mounted on support structures, internal access tracks, security fencing, electrical cabling and ducting, CCTV and other ancillary infrastructure, drainage, additional landscaping and habitat enhancement as required and associated site development works including works relating to the access to the site. The solar farm would be operational for 35 years. A Natura Impact Statement has been prepared in respect to the application for planning permission
For the construction of a dwelling house and garage, proprietary waste water treatment system, new entrance and all ancillary works
Permission for the following changes which are at variance with the grant of planning permission 18-851 (a) Changes to roof structure to the north and west elevations of the dwelling (b) Changes to window fenestrations on all elevations (c) Change to stone surround on the east elevation (d) Omission of wall recess on south elevation (e) Revised site entrance location (f) Change to boundary fence on the western boundary 2. PERMISSION for development which will consist of the completion of the site entrance, wing walls and piers
For the refurbishment of an existing stone cottage to include provision of thatch roof, timber windows, doors and thermal upgrade of the cottage and for the construction of a single storey extension to the side of the existing cottage, provision of effluent treatment system and ancillary site works
For the thermal upgrade and new front door of the existing cottage and for the construction of a single storey extension to the side of the existing cottage, and for the provision of an effluent treatment system and ancillary services
To (a) Demolish an existing conservatory, (b) To construct a single storey rear extension, (c) Raise the level of the existing flat roof. (d) change of habitable space and (e) Elevations changes with all associated site works
To construct a new dwelling house, site entrance, private garage and on-site waste water treatment system along with all associated site works and services
For development which will consist of 1. Demolish existing dressing room, toilet and storage buildings. 2. Construction of a new building comprising of dressing rooms, meeting room, gymnasium, tea room, small shop for sale of club gear, medical room, referees changing rooms and all ancillary areas. 3. Construction of a new separate equipment store. 4. Decommission existing septic tank and install a new proprietary waste water treatment system. 5 All ancillary site works
For development, the development consists of the construction of a slatted unit and associated site works
For development consists of the construction of a silage slab and associated site works
To alter the position, orientation and layout of the hurling wall which was previously granted under Planning Reference No. P20/79
To carry out the following works. The proposed works will involve the following: 1. Construction of new vehicular entrance. 2. Construction of new Hardstand area along with associated site works for Vehicular overflow car park. 3. Construction of new hurling wall. 4. Associated ancillary works associated with the proposed development.
To construct a slatted cubicle unit, 3 bay machinery shed and all ancillary site works
For development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
To construct a new dwelling house, entrance, private garage and install a new wastewater treatment system on an infill site along with all associated works
For development which will consist of the construction of a single storey dwelling house, garage, a proprietary waste water treatment system and ancillary site works
For development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
For development which will consist of the change of use of an existing domestic garage to an ancillary living accommodation unit including modifications to existing elevations and ancillary site works
To erect a dwelling house, garage, install and effluent treatment system and percolation area and all associated works
To (a) Construct side extension and fenestration changes to existing cottage (b) Construct detached domestic garage together with all associated site development works and services
To (a) Construct extensions to front and rear of existing dwellinghouse, (b) Reconstruct existing conservatory (c) Carry out fenestration changes together with all associated site development works and services
To construct a new dwelling house and garage complete with a new entrance, wastewater treatment system and ancillary works
For development, the development will consist of construction of a bungalow dwelling, effluent treatment system together with site access & all associated site works.
To RETAIN increased number of children enrolled at MaryK's Childcare, Preschool and Montessori facility. This application is necessary to facilitate significant changes in childcare including the addition of education, inclusion and access to the childcare model system since planning PERMISSION was previously granted, including hours of operation and all associated works
(a) to RETAIN minor internal layout changes and minor elevational changes to existing as built building, including existing as built site works adjustments (b) To RETAIN existing detached prefabricated multipurpose room and prefabricated storage shed including all associated site works/services
To construct a dwelling house, garage, waste water treatment system, upgrade existing entrance/exit and all ancillary works
For the construction of a single storey extension to side of existing school building comprising of classroom accommodation together with additional parking, minor landscaping, drainage, plant and related works
For the development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
(planning ref. no P22-700) which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
To Extend the Appropriate Period of Planning Permission P11-447 to construct dwelling house, garage, entrance, effluent treatment system including all associated site works and services
To (a) Close up existing entrance from the R469 regional road. (b) Create a new entrance and driveway from the L4114 local road. (c) Construct a dwelling house, garage, wastewater treatment system and all associated site works
To construct dwelling house and garage, connect to proprietary wastewater treatment system, connect to public services and carry out all ancillary site works
Of garage and covered patio as constructed together with all ancillary site development works and services
For the construction of a dwelling house, proprietary treatment system and new entrance including ancillary site works